Flyover Project Management

   

Added on  2020-04-15

12 Pages2260 Words392 Views
Running head: FLYOVER CONSTRUCTION (PROJECT MANAGEMENT)Flyover Construction(Project Management)Name of the StudentName of the UniversityAuthors Note

1FLYOVER CONSTRUCTION (PROJECT MANAGEMENT)Letter to SponsorTo Hanyu PinyinChinaDate: 26th Nov, 2017Subject: Funding Request for the Construction ProjectRespected sir,This project charter presents all the details for the flyover construction over ‘Road Networkin Ulaanbaata’ in manner to eliminate the traffic congestions faced by the citizens of theChina. The raw materials and well resources are extremely required for the long run of theproject, for that we will need sponsors for the successful delivery of the project. It will be anopportunity to have you with our side and with your support the project can be completedwithout any obstacles. We will be highly obliged if you show your interest in sponsoring usfor this project through contacting us.Thanking you,Sincerely,<Please Fill>Communication ManagersChina State Construction Engineering

2FLYOVER CONSTRUCTION (PROJECT MANAGEMENT)Table of ContentsLetter to Sponsor........................................................................................................................11. Introduction............................................................................................................................32. Project charter........................................................................................................................32.1 Objectives of the project..................................................................................................32.2 Importance of the project to the organization..................................................................32.3 Scope of the project..........................................................................................................42.4 Business case....................................................................................................................42.5 Milestone and schedule....................................................................................................52.6 Risk Assessment...............................................................................................................62.7 Required Resources..............................................................................................................82.8 Stakeholder Analysis............................................................................................................82.9 Principles of the Teams........................................................................................................93.0 Conclusion............................................................................................................................94.0 Bibliography:......................................................................................................................10Appendix:.................................................................................................................................12

3FLYOVER CONSTRUCTION (PROJECT MANAGEMENT)1. IntroductionIn this modern world of technology, traffic congestions are one of the crucial factorsfor the people of China and needs to be eliminated for the proper travelling. This projectproposal aims at the objectives related to the delivery of the flyover construction on the“Road Network in Ulaanbaata” in China by the China State Construction Engineering. Thisflyover will be helpful in reducing the traffic congestions and increase the mobility in thatarea. The purpose of this report is to present a project charter and cover all the objectivesrelated to the flyover protection with a practical example. This project charter consists ofobjectives related to the project, schedule and milestones of the activities involved in thewhole project, risk management that will cover the identified risks based on the pastexperience, and stakeholder analysis. 2. Project charter2.1 Objectives of the projectFollowing are the objectives of the project:Present all the objectives and activities related to the construction of the flyoverIntroduce all the stakeholders’ role and responsibilitiesPresent a risk analysis in manner to enhance the outputPresent an activity list along with the budget planning2.2 Importance of the project to the organization This project aims at enhancing the life living of the people of China througheliminating the traffic jams facing by the citizens travelling at “Road Network in Ulaanbaata”in China. This project charter will be helpful in proper planning of the project and deliver a

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project on Flyover Construction
|14
|2312
|63

Design and Construction of 1.5 km Single Deck Flyover | Project Management
|60
|13380
|126

Construction of a Residential Suite - Project Charter
|13
|2323
|275

Construction of a New Retail Store Project Charter
|13
|2623
|130

Project Feasibility Business Project
|28
|4066
|66

Assignment 1 - Project Charter
|7
|2306
|84