logo

SBM1204 Project Delivery Systems

   

Added on  2020-03-04

17 Pages4263 Words286 Views
Running Head: PROJECT DELIVERY SYSTEMProject Delivery System for Construction ProjectsName of the StudentName of the University
SBM1204 Project Delivery Systems_1
1PROJECT DELIVERY SYSTEMTable of ContentsIntroduction......................................................................................................................................21. Overview......................................................................................................................................21.1 Project Title (Project/Program Delivery Systems)....................................................................21.2 Project Background...................................................................................................................32. Objectives and Scope...................................................................................................................32.1 Objectives and Scope.................................................................................................................32.2 Outcomes/Benefits.....................................................................................................................42.3 Outputs.......................................................................................................................................42.4 Assumptions and Constraints....................................................................................................53. Literature Review and Features of Typical Delivery Systems....................................................53.1 Literature Summary Related to Project/Program Delivery Systems.........................................53.2 Case Project Objectives, Business Case, Context, Requirements and Challenges....................73.3 Structuring Knowledge to Respond To Case Project Requirements and Challenges...............93.4 Typical Delivery Systems and Key Success Factors...............................................................10Conclusion.....................................................................................................................................13References......................................................................................................................................14
SBM1204 Project Delivery Systems_2
2PROJECT DELIVERY SYSTEMIntroductionProject delivery method is defined as a fixed set of systems that are used by constructionagencies and contractors for developing a particular construction or design of a structure. Thesealso include, design, development, operations and maintenance. However, the proposed deliverysystem must be approved by legal agreements between the agencies and the parent organizationsthat have commissioned the project in the first place. Selection of a suitable project deliverysystem is necessary in order to ensure the success of the project. Construction projects aregenerally large scale projects and hence, selection of suitable delivery model is necessary. Theproject is built upon the research of project delivery systems and is continued to the design of anew project delivery system. Project delivery method is defined as a fixed set of systems that areused by construction agencies and contractors for developing a particular construction or designof a structure. These also include, design, development, operations and maintenance. In this particular project, the preliminary design of the project delivery system must beapproved by the supervisors after which, the final design will be developed.1. Overview1.1 Project Title (Project/Program Delivery Systems)The title of the project is the design of a new project delivery system for the companyunder which, the research is being conducted. Before designing the project delivery system, aliterature review and research process will be conducted on project delivery systems. The chosencase for the design of the delivery system is the Construction of Dam Spillway Upgrade in South
SBM1204 Project Delivery Systems_3
3PROJECT DELIVERY SYSTEMEast Queensland Project. This was conducted in order to construct some additional upgrades tothe originally existing Wivenhoe Dam in Queensland.1.2 Project BackgroundThe project is built upon the research of project delivery systems and is continued to thedesign of a new project delivery system. Project delivery method is defined as a fixed set ofsystems that are used by construction agencies and contractors for developing a particularconstruction or design of a structure. These also include, design, development, operations andmaintenance. In this particular project, the preliminary design of the project delivery systemmust be approved by the supervisors after which, the final design will be developed. 2. Objectives and Scope2.1 Objectives and ScopeThe main objective of this project is to design and deliver a new project delivery systemfor the construction of dam spillway upgrade in Wivenhoe Dam, South East Queensland. Hence,the objectives of this particular project are as follows.To analyze the existing condition at the Wivenhoe DamTo find a suitable project delivery model for the same projectTo analyze the usefulness of the chosen delivery model in the projectTo prepare a basic design of a project delivery system and get it approved by theproject supervisorTo prepare the final design of the project delivery system based on therequirements of dam spillway upgrade of Wivenhoe Dam
SBM1204 Project Delivery Systems_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
CPCCC5003A The Party Wall
|8
|1442
|16

Relocate Burnaby Hospital
|12
|616
|28

Development of Information System in Healthcare Industry - Project Completion Review Report
|5
|1462
|368

Launching a Solar Panel for Electricity
|4
|670
|96

Project Management: Harbour Swing Bridge
|15
|4795
|117

Project Management for St. Dismas Assisted Living Facility Project
|6
|993
|424