Table of Contents Section 1: Project Network..............................................................................................................1 1.1................................................................................................................................................1 1.2................................................................................................................................................2 1.3................................................................................................................................................3 Section 2: Project network with computation of slack, early and late activity times......................4 2.1................................................................................................................................................4 2.2................................................................................................................................................6
Section 1: Project Network 1.1 ActivityPredecessor ANone BNone CA,B DA,B EA,B FC,D GE HF IF,G Project Network Diagram – EG ABI C FH D 1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
1.2 ActivityPredecessor ANone BA CA DA EB FB GC HD IF,G JE,I,H BE AF IJ CG DH 2
1.3 IDActivityPredecessor AIdentify TopicNone BResearch TopicA CDraft PaperB DEdit PaperC ECreate GraphicsC FReferencesC GProof PaperD,E,F HSubmit PaperG AB C DEF GH 3
Section 2: Project network with computation of slack, early and late activity times 2.1 IDActivityPredecessorTimes AOrder ReviewNone2 BOrder Standard partsA3 CProduce Standard partsA10 DDesign custom partsA13 ESoftware DevelopmentA18 FManufacture custom hardware C,D15 GAssembleB,F10 HTestE,G5 B G C F A DH E Early start TEEarly finish Activity Late start TELate finish 4
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.