logo

Social sustainability and engineering Assignment

   

Added on  2021-06-14

14 Pages3051 Words15 Views
Running head: Social Sustainability and Engineering
Social Sustainability and Engineering
Name of the Student
Name of the University
Author Note
Social sustainability and engineering Assignment_1
1Social sustainability and engineering
Assignment
Title
Student Name
Student ID
Email
Social sustainability and engineering Assignment_2
2Social sustainability and engineering
Social sustainability and engineering Assignment_3
3Social sustainability and engineering
Introduction:
Engineering is the science and technology that is used to meet the demands and
needs of the society, which includes construction of buildings, bridges, tunnels, vessels
or aircrafts, and developing newer technologies and infrastructure. To meet such needs,
the engineers and the managers often needs to devise a mutual strategy to address the
demands, and can lead to shortcuts be taken in this process, in order to cut costs or
margins. These shortcuts also increase the risks of errors and thus engineering failures
and disasters that are caused due to design failures. Such can even cause massive loss
of property as well as lives. Different engineering failures have occurred within our
modern history. The deepwater Horizon explosion was a significant engineering
accident that occurred in 2010 that resulted in the sinking of the Deepwater Horizon oil
drilling rig, the death of 11 workers, injury of 17 others and a massive oil spill into the
Gulf of Mexico, that lead to an unimaginable environmental impact, due to which it was
considered the largest environmental disaster in the US history [1; 2].
The Disaster:
Background to the Incident:
$560 Million USD platform for the Deepwater Oil Rig was built by Hyundai Heavy
Industries. The rig was owned by Transocean, under the lease of BP until September
2013. It became operational on 2010, operating at a depth of 5,000 feet. The rig acted
as an exploratory well, for the construction of a well 18,360 feet deep. The plan was
plug and suspend the well as a subsea producer, after the construction and cementing
was complete. The well was due to be tested for its integrity and a cement plug to be set
which will allow the well to be temporarily abandoned [3].
Social sustainability and engineering Assignment_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
The Case of Deepwater Horizon Disaster
|17
|3552
|282

Case Study: The Deepwater Horizon Oil Spill
|6
|1080
|179

Critical Analysis of Deepwater Horizon Oil Spill
|17
|5200
|121

Deepwater Horizon Oil Spill: Lessons Learned from System Engineering and Risk Management
|11
|2935
|141

Deepwater Horizon Project Study: Risk Management and Organizational Maturity
|8
|2611
|405

Managing Complex Projects: DeepWater Horizon Oil Spill
|9
|4225
|50