Running head: PROJECT REPORT System Analysis and Design Name of the Student: Student ID: Name of the University: Authorās note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT REPORT Table of Contents Introduction......................................................................................................................................2 System Development Lifecycle.......................................................................................................2 Work Breakdown Structure.............................................................................................................6 Pert Chart showing early and late start and finish...........................................................................7 Entities and their attributes............................................................................................................11 ER diagram....................................................................................................................................11 NPV, Payback Period, and ROI Calculation.................................................................................12 Conclusion.....................................................................................................................................13 References......................................................................................................................................14
2PROJECT REPORT Introduction The following assignment would consider the project of āImplementation of Teaching and Learning System in High Quality Instituteā and the report would comprise of system development lifecycle, work breakdown structure, Pert Chart, Entities and their attributes, ER diagram, NPV, Payback Period, and ROI Calculation. System Development Lifecycle The development of the effective project plan for the project of āImplementation of Teaching and Learning System in High Quality Instituteā can be developed by using the traditional agile methodology for system development life cycle. The development of the agile methodology would be helpful for forming the development of the effective implication of the processes and formation of the unique support for the development. The following diagram would show the iterative agile software development lifecycle for the project, Figure 1: Agile Software Development Life Cycle (Source:
3PROJECT REPORT The agile software development lifecycle comprise of 6 phases namely requirements, plan, design, develop, release, and track & monitor phase. The completion of the phases would be based for the development of the final deliverable for the project. The phases has been explained below, i.Requirements:It is the first phase of the agile methodology that helps in realizing the requirements for the development of the project and completion of the activities. The phase involves the activities of analysis of requirements, initiationdocumentation,andcharterdocumentsfortheprojectof āImplementation of Teaching and Learning System in High Quality Instituteā. ii.Plan:It is the second phase of the agile methodology that helps in realizing the planning requirements for the development of the project schedule plan from the activities. The phase involves the activities of outline of plan, activity scheduling, and complete planning for the project of āImplementation of Teaching and Learning System in High Quality Instituteā. iii.Design:It is the third phase of the agile methodology that helps in realizing the design requirements for the development of the TLS, PLS, and ULS integrated system. The phase involves the activitiesof design outline, design review, completedesigndevelopment,anddesignsimulationfortheprojectof āImplementation of Teaching and Learning System in High Quality Instituteā. iv.Develop:It is the fourth phase of the agile methodology that helps in executing the activities of the project and forming the reciprocal development of the final project plan. The phase involves the activities of IT infrastructure development, server development and network device installation, switches and routers are
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4PROJECT REPORT installed,softwaredevelopmentforULSandPLS,testingprocedure development,anddatabasesystemisdevelopedfortheprojectof āImplementation of Teaching and Learning System in High Quality Instituteā. v.Release:It is the fifth phase of the agile methodology that helps in implementing the systems (TLS, PLS, and ULS) for the High Quality Institute. The phase involves the activities of registration system is developed, tracking system is formed, bug and error is reviewed, and final system development for the project of āImplementation of Teaching and Learning System in High Quality Instituteā. vi.Track and Monitor:It is the last phase of the agile methodology that helps in realizing whether the activities of the project are executed successfully for defining the completion of the project. The phase involves the activities of monitoring system is developed, review of processes, and tracking function development for the project of āImplementation of Teaching and Learning System in High Quality Instituteā. The required activity list for the project of āImplementation of Teaching and Learning System in High Quality Instituteā is given below, WBSTask Name 0Implementation of Teaching and Learning System in High Quality Institute 1Requirements 1.1Analysis of Requirements 1.2Initiation Documentation 1.3Charter Documents 2Plan
5PROJECT REPORT 2.1Outline of plan 2.2Activity Scheduling 2.3Complete Planning 3Design 3.1Design Outline 3.2Design Review 3.3Complete Design Development 3.4Design Simulation 4Develop 4.1IT infrastructure development 4.2Server Development and Network Device Installation 4.3Switches and Routers are installed 4.4Software Development for ULS and PLS 4.5Testing Procedure Development 4.6Database System is developed 5Release 5.1Registration system is developed 5.2Tracking system is formed 5.3Bug and Error is reviewed 5.4Final system development 6Track and Monitor 6.1Monitoring system is developed 6.2Review of processes 6.3Tracking function development
6PROJECT REPORT Work Breakdown Structure The work breakdown structure for the project of āImplementation of Teaching and Learning System in High Quality Instituteā is shown below, Implementation of Teaching and Learning System in High Quality Institute Requirements Analysis of Requirements Initiation Documentation Charter Documents Plan Outline of plan Activity Scheduling Complete Planning Design Design Outline Design Review Complete Design Development Design Simulation Develop IT infrastructure development Server Development and Network Device Installation Switches and Routers are installed Software Development for ULS and PLS Testing Procedure Development Database System is developed Release Registration system is developed Tracking system is formed Bug and Error is reviewed Final system development Track and Monitor Monitoring system is developed Review of processes Tracking function development Figure 2: Work Breakdown Structure
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7PROJECT REPORT Pert Chart showing early and late start and finish The pert chart development would require the use of the activities, their early start date, early finish date, late start date, late finish date, and total slack. The following table would be used for the development of the pert chart for the project of āImplementation of Teaching and Learning System in High Quality Instituteā, WBSTask NameEarly Start Early Finish Late Start Late Finish Total Slack 0 Implementation of Teaching and Learning System in High Quality Institute Wed 8/1/18 Tue 10/9/18 Wed 8/1/18 Tue 10/9/180 days 1RequirementsWed 8/1/18 Wed 8/15/18 Wed 8/1/18 Fri 8/17/180 days 1.1Analysis of RequirementsWed 8/1/18 Fri 8/3/18 Wed 8/1/18 Fri 8/3/180 days 1.2Initiation DocumentationMon 8/6/18 Thu 8/9/18 Fri 9/28/18 Wed 10/3/1839 days 1.3Charter DocumentsFri 8/10/18 Wed 8/15/18 Thu 10/4/18 Tue 10/9/1839 days 2PlanMon 8/6/18 Fri 8/17/18 Mon 8/6/18 Mon 8/27/180 days 2.1Outline of planMon 8/6/18 Tue 8/7/18 Mon 8/6/18 Tue 8/7/180 days 2.2Activity SchedulingWed 8/8/18 Fri 8/10/18 Wed 8/8/18 Fri 8/10/180 days 2.3Complete PlanningMon 8/13/18 Fri 8/17/18 Tue 8/21/18 Mon 8/27/186 days 3DesignMon 8/13/18 Mon 8/27/18 Mon 8/13/18 Mon 8/27/180 days 3.1Design OutlineMonWedMonWed0 days
8PROJECT REPORT 8/13/188/15/188/13/188/15/18 3.2Design ReviewThu 8/16/18 Fri 8/17/18 Thu 8/16/18 Fri 8/17/180 days 3.3Complete Design DevelopmentMon 8/20/18 Thu 8/23/18 Mon 8/20/18 Thu 8/23/180 days 3.4Design SimulationFri 8/24/18 Mon 8/27/18 Fri 8/24/18 Mon 8/27/180 days 4DevelopTue 8/28/18 Wed 9/19/18 Tue 8/28/18 Tue 10/9/180 days 4.1IT infrastructure developmentTue 8/28/18 Fri 8/31/18 Tue 8/28/18 Fri 8/31/180 days 4.2Server Development and Network Device Installation Mon 9/3/18 Fri 9/7/18 Mon 9/3/18 Fri 9/7/180 days 4.3Switches and Routers are installedMon 9/10/18 Wed 9/12/18 Mon 9/10/18 Wed 9/12/180 days 4.4Software Development for ULS and PLSMon 9/3/18 Mon 9/10/18 Tue 10/2/18 Tue 10/9/1821 days 4.5Testing Procedure DevelopmentThu 9/13/18 Tue 9/18/18 Thu 9/13/18 Tue 9/18/180 days 4.6Database System is developedThu 9/13/18 Wed 9/19/18 Wed 10/3/18 Tue 10/9/1814 days 5ReleaseWed 9/19/18 Mon 10/1/18 Wed 9/19/18 Tue 10/2/180 days 5.1Registration system is developedWed 9/19/18 Fri 9/21/18 Wed 9/19/18 Fri 9/21/180 days 5.2Tracking system is formedMon 9/24/18 Thu 9/27/18 Mon 9/24/18 Thu 9/27/180 days 5.3Bug and Error is reviewedMon 9/24/18 Tue 9/25/18 Tue 9/25/18 Wed 9/26/181 day 5.4Final system developmentWed 9/26/18 Mon 10/1/18 Thu 9/27/18 Tue 10/2/181 day 6Track and MonitorFriTueFriTue0 days
9PROJECT REPORT 9/28/1810/9/189/28/1810/9/18 6.1Monitoring system is developedFri 9/28/18 Tue 10/2/18 Fri 9/28/18 Tue 10/2/180 days 6.2Review of processesWed 10/3/18 Fri 10/5/18 Wed 10/3/18 Fri 10/5/180 days 6.3Tracking function developmentMon 10/8/18 Tue 10/9/18 Mon 10/8/18 Tue 10/9/180 days
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10PROJECT REPORT The following is the pert chart for the project, Figure 3: Pert Chart
11PROJECT REPORT Entities and their attributes The ER diagram for the project would include the following entities and their attributes, ER diagram The ER diagram for the project of āImplementation of Teaching and Learning System in High Quality Instituteā is shown below, Figure 4: ER diagram
12PROJECT REPORT NPV, Payback Period, and ROI Calculation The NPV, Payback Period, and ROI for the project of āImplementation of Teaching and Learning System in High Quality Instituteā is shown below, Cost benefit analysis Year 0Year 1Year 2Year 3Year 4Year 5 Value of benefits$0$7,000$7,000$7,000$7,000$7,000 Development cost($20,000)$750$800$770$750$730 Annual Expenses$0($2,000)($2,000)($2,000)($2,000)($2,000) Net benefit/costs$10,000$0$0$0$0$0 Net cash flow($10,000)$5,750$5,800$5,770$5,750$5,730 Discount factors Discount rate6% Year Index012345 Discount factor10.940.890.840.790.75 Discounted flows Cost($20,000)($1,887)($1,780)($1,679)($1,584)($1,495) Benefit$10,000$6,604$6,230$5,877$5,545$5,231 Net($10,000)$4,717$4,450$4,198$3,960$3,736 Cumulative($10,000)($5,283)($833)$3,365$7,326$11,062 Net present value$11,062 ROI33% Payback Analysis Years Months 114 Payback Period in Years2.30
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
13PROJECT REPORT Conclusion The following assignment had considered the project of āImplementation of Teaching and Learning System in High Quality Instituteā and the report had been providing the details of systemdevelopmentlifecycle,workbreakdownstructure,PertChart,Entitiesandtheir attributes, ER diagram, NPV, Payback Period, and ROI Calculation.
14PROJECT REPORT References EdwardsJr,T.V.(2017).APPLICATIONOFAGILEMETHODOLOGYTO ELECTROMECHANICALDESIGN:ACASESTUDY.InProceedingsofthe InternationalAnnualConferenceoftheAmericanSocietyforEngineering Management.(pp. 1-5). American Society for Engineering Management (ASEM). Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management. Project Management Institute. Kerzner, H. (2018).Project management best practices: Achieving global excellence. John Wiley & Sons. Leach, L. P. (2014).Critical chain project management. Artech House. Lock, D. (2017).The essentials of project management. Routledge. Mahadevan, L., Kettinger, W. J., & Meservy, T. O. (2015). Running on Hybrid: Control Changes whenIntroducinganAgileMethodologyinaTraditional"Waterfall"System Development Environment.CAIS,36, 5. Meredith, J. R., Mantel, S. J., Shafer, S. M., & Sutton, M. M. (2014).Project management in practice. Wiley. Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking project management performance and project success.International journal of project management,32(2), 202-217.
15PROJECT REPORT Nicholas, J. M., & Steyn, H. (2017).Project management forengineering, business and technology. Routledge. Steinke, G. H., Al-Deen, M. S., & LaBrie, R. C. (2017). NNOVATING INFORMATION SYSTEMDEVELOPMENTMETHODOLOGIESWITHDESIGNTHINKING. InProceedings of the 5th International Conference on Applied Innovations in IT(pp. 51- 55). Turner,J.R.(2014).Handbookofproject-basedmanagement(Vol.92).NewYork,NY: McGraw-hill. Verzuh, E. (2015).The fast forward MBA in project management. John Wiley & Sons.