Trusted by 2+ million users, 1000+ happy students everyday
Showing pages 1 to 3 of 9 pages
MANAGEMENT ACCOUNTING
(a) All the cost that is involved in the production process is known as manufacturing overhead. The manufacturing overhead is a wide term which comprises of various other factory cost also. However, the cost incurred with respect to direct material and direct labour is excluded from the manufacturing overhead. As there is no direct cost and it is a kind of overhead it is also known as indirect cost. Apart from the manufacturing cost there are also certain cost in relation to selling and distribution and various other general and administrative expenses that are not added to the product cost. These cost are shown in the income statement of the company as and when they are incurred. Such cost may include inspection cost, maintenance and repair of any asset, depreciation of an equipment, etc. Based on the general accounting principle, it is necessary to value the inventories and the cost of goods sold on the basis of direct cost and manufacturing overheads(Berman, Knight and Case, n.d.). It is a common practise that the overhead has to be allocated and assigned to all the particular units if the company produces more than a single product. Manufacturing overhead is also distributed in this manner. For example, depreciation of the machine is calculated taking into consideration the value of the machinery, electricity is based on the units consumed and so on (Shim and Siegel, 2008). There are a large number of ways by which the company can assign and allocate overhead. These methods are chosen by the companies depending on the market forces and the nature of operations the company carries out. These can be divided into two broad groups- conventional approach and activity based method (modern). Let us now understand the concept of conventional approach first, in this method the manufacturing overhead was simply allocated on the basis of machine hours or the labour hours or any changes in the degree of the prime cost(Bruner, Eades and Schill, 2017). It is observed that the manufacturing overhead is increased with the decrease in the labour hours or machine hours. When the accountant of the company does not use different cost drivers but uses a single cost driver for all the overheads, then the rate calculated is said it be single blanket rate(Saltelli, Chan and Scott, 2008). In the question, we are asked to calculate the cost per unit using the single blanket rate. The formula for calculating the single overhead rate is budgeted cost divided by the number of hours required for production. On calculating on the basis of labour hours we have found out that the manufacturing rate is 48/product unit. This means that for Fred it costs $96 (48*2) as he took two hours to complete one unit whereas for Martha it costs $144 (48*3) as it took three hours for him to complete one unit. CACLCULATION OF COST PER UNIT USING CONVENTIONAL APPROACH : (In $) PARTICULARS FRE DMARTHA
Production units10005000 Direct materials4060 Direct labours3045 Manufacturing overheads96144 Total Cost Per Unit166249 Notes : Total Manufacturing Costs$8,16,000 Total Hours Required17000 hours (1000 units of Fred *2 + 5000 units of Martha*3 hours) Manufacturing Overhead Per Hour = TotalManufacturing Costs Total Hours Manufacturing Overhead Per Hour =816000 17000 =$48/hour (b) In this question, we have been asked to calculate the cost involved in the cost activity based on different cost drivers. The word “cost activity” is a technical term used in cost accounting which can be explained as different types of activities that are involved in the manufacturing process. The cost activities together form a cost pool. Although these cost are not directly attributable to the product still they form a part of the cost. The other word used “cost driver” is a factor on which the cost of a activity is dependent(Taylor, 2008). Following is the table that shows the rate of each activity as per the cost driver. For example, the expenses related to machine are $450000 which is divided by the budgeted cost driver of 9000 hours resulting in the rate of absorption $50/ machine hour. In the given table the rate of absorption has been calculated based on their respective cost drivers. CACLCULATION OF COST PER ACTIVITY : ACTIVITYCOST($ )COST DRIVERBudgeted LevelRATE ($) MachineRelated Costs450000Machine hours9000 hours50/hour Setup & Inspection180000Numberofproduction runs40 runs4500/run Engineering90000Engineeringchange100change900/
Found this document preview useful?
You are reading a preview Upload your documents to download or Become a Desklib member to get accesss