Project Management Plan for Request Tracker

   

Added on  2020-02-18

8 Pages1852 Words71 Views
 | 
 | 
 | 
Running head: BSC PROJECT MANAGEMENTBSC Project ManagementName of the StudentName of the UniversityAuthor’s noteExecutive Summary
Project Management Plan for Request Tracker_1

1BSC PROJECT MANAGEMENTRon Bashley, an OIT employee along with Harry Bonnett, the Director of InformationSystems Department work on Request Tracker project to fix ticketing system issues. Theprevious initiative Remedy failed in some instances very badly with utter disappointmentsbesides for Remedy requires $20,000 per year for the licensing so Ron's supervisor Backencalled a meeting and there all the members of the meeting decided to move to open-sourceand hence initiated the project Request Tracker. Request Tracker will work similar toRemedy and will cut down the heavy budget and expenses. The project should be doneaccording to a project management plan to get the desired result. This report also showcasedthat Ron should be more responsible for his job. The report highlighted all the risksassociated with the Request Tracker project and also the procedures to mitigate those risks.Table of Contents
Project Management Plan for Request Tracker_2

2BSC PROJECT MANAGEMENT1. Introduction............................................................................................................................22. Background of the case study................................................................................................23. Risk management Plan...........................................................................................................24. Identify risks associated with this project..............................................................................35. Risk analysis for identified risks............................................................................................46. Risk responses plan for identified risks.................................................................................47. Plan for monitoring and controlling identified risks..............................................................48. Justification of your proposed risk management Plan...........................................................59. Conclusion..............................................................................................................................510. References............................................................................................................................61. IntroductionRon Bashley, an OIT employee along with Harry Bonnett, the Director of InformationSystems Department work on Request Tracker project to fix ticketing system issues. The
Project Management Plan for Request Tracker_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents