Executive Summary
While building contracts aids as a means of evaluating construction, they also structure the
distribution of risk to the number of parties tangled. The building field is a very widespread and
exceptional in every single project. In this world most of the projects are achieved by contracts.
And as a norm to accomplish the project efficiently we ought to manage the contracts first. The
proprietor has the exclusive power to choose the type of contract & execution method to be
adopted for a particular facility to be built and to set onward the standings in a contractual
agreement. Selecting the appropriate technique to deliver the venture will simplify the project
implementation and give flexibility in the course of construction by means of saving money and
time for a firm and consequently the same to the proprietor. This paper focuses on the
Traditional contract construction method, its advantages and disadvantages. It also focuses on the
alternative and more recent delivery method systems that can be used.
Introduction
In this world most of the projects are achieved by contracts. And as a norm to accomplish
the project efficiently we ought to manage the contracts first. The proprietor has the exclusive
power to choose the type of contract & execution method to be adopted for a particular facility to
be built and to set onward the standings in a contractual agreement. Selecting the appropriate
technique to deliver the venture will simplify the project implementation and give flexibility in
the course of construction by means of saving money and time for a firm and consequently the
same to the proprietor.
The traditional Construction method of delivery occasionally denoted to as design bid build
remains the most generally used technique of acquiring building works. In the traditional
construction method, the client every so often hires a consultant (an architectural/engineering
Traditional Contract Construction Method in the Constructed Environment_2

The Constructed Environment 3
firm) which makes the detailed drawings and stipulations for the builder (a general contractor).
The consultant also performs in place of the client to supervise the development execution in the
course of building Arain, (2016). The general builder is accountable for the construction itself
although the labor in reality may be carried out by several specialty subcontractors.
The client generally bargains the cost for work with the consultancy (A/E) firm. Besides to
the accountabilities of modelling the structure, the consultancy firm also undertakes to some
level administration of the building as postulated by the client. Traditionally, the A/E firm honors
itself as design experts in lieu of the client who is prohibited from connecting with probable
builders to circumvent conspiracy or conflict of interest. Field overseers working for a
consultancy firm generally track through the execution of a venture after the design is finalized
and rarely have widespread contribution in the design itself. Because of the legal action climate
in the last two decades, most consultancy firms only offer eyewitnesses instead of supervisors in
the field. Even the workshop drawings of production or building schemes given by the builders
for authorization are appraised with a renunciation of responsibility by the Consultancy firms
Arain, (2016).
The client may choose a builder either by reasonable bidding or by concession. Public
organizations are obligatory to use the reasonable bidding approach, while cloistered groups may
select whichever method of action. By means of reasonable bidding, the client is enforced to use
the consultant-builder order since detailed drawings and stipulations ought to be all set prior to
inviting bidders to give in to their bids. If the client selects to use a discussed contract, it is
allowed to use phased building if it so longings.
The builder may opt to execute whole or a section of the building work, or perform only as
a director by delegating all the building works to subcontractors. The builder may also choose
Traditional Contract Construction Method in the Constructed Environment_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Strategic Construction Procurement: Methods
|17
|4299
|43

Construction Business and Law: Group Report
|16
|2411
|96

Contractual Procedures and Procurement 5 CONTRACTUAL PROCEDUDURES AND PROCUREMENT FOR CONSTRUCTION AND THE BUILT ENVIRONMENT Name Course Professor University City/state
|30
|12023
|152

Professional Practice in Construction Research Paper 2022
|19
|3202
|30

Construction Procurement Method Selection
|14
|3329
|156

Strategic Construction Procurement: Evaluation and Selection of Alternatives
|6
|956
|452