This report deals with the case of UNICEF Child Care (UCG) which provides support, supervision and care to children between the ages of six weeks to 13 years. The report will develop an accurate system which will reduce their cost of operation.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: INFORMATION SYSTEMS ANALYSIS AND DESIGN COIT 20248: Information Systems Analysis and Design Term 3, 2017 Assessment 1 - Systems Development Lecturer: Lecturer Name Tutor: Tutor Name Prepared by: Student Name Student Number
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1INFORMATION SYSTEMS ANALYSIS AND DESIGN Table of Contents Introduction......................................................................................................................................2 Project Scope Statement..............................................................................................................2 Project Objectives........................................................................................................................2 Deliverables.................................................................................................................................3 Milestones....................................................................................................................................3 Approach to System Development..................................................................................................4 Systems Requirements.....................................................................................................................5 Project Cost Benefit Analysis..........................................................................................................6 Project Schedule..............................................................................................................................8 System Information Requirement Investigation Techniques........................................................13 Reflections and Conclusions..........................................................................................................13 References......................................................................................................................................14
2INFORMATION SYSTEMS ANALYSIS AND DESIGN Introduction This report deals with the case of UNICEF Child Care (UCG) which provides support, supervision and care to children between the ages of six weeks to 13 years. The children care has been facing issues due to the current manual process of donations and ordering of supplies. These processes are inefficient and the report will develop an accurate system which will reduce their cost of operation. Project Scope Statement According toKerzner and Kerzner, (2017), the essential requirements of the project are included in the project statement. This will be developed based on the requirements of the organization and goals of the stakeholders. In this current project, an online deposit system will be designed and developed so that the donors can conveniently transfer funds with ease. It will also comprise of development of an ordering system for managing inventory efficiently to reduce the wastage of resources. Project Objectives Harrison and Lock, (2017) states, the project objective constitute the objectives and the desired outcomes based on the goals of the stakeholders. The objectives of the current project are as follows: ï‚·To conduct research to identify the specifications of the new system ï‚·To discuss with the project members about the specification of the new system ï‚·To develop the new online deposit and ordering system ï‚·To integrate the system into the current organizational model ï‚·To test the new system to identify required customization
3INFORMATION SYSTEMS ANALYSIS AND DESIGN ï‚·To implement the changes and revamp the system. Deliverables As opined by Jaber, et al., (2018), the inputs processes in achieving the goals of the project are in accordance with the stakeholder objective is known as deliverables. The different components of projects are information plan, money, hardware, process documents and software. The deliverables in the current project are as follows: Task NameDurationStartFinish 1.0 Initiation phase26 daysWed 4/4/18Wed 5/9/18 2.0 Planning phase11 daysThu 5/10/18Thu 5/24/18 3.0 Implementation phase77 daysFri 5/25/18Mon 9/10/18 4.0 Closure phase3 daysTue 9/11/18Thu 9/13/18 Milestones As stated byMontoya and Persson, (2017), there are tasks on the project schedule that have a timeframe of zero days, which do not have any impact on the overall timeframe of the work are known as project milestones. These phases are known as milestones which signify the completion of different phases in the project. The progress of the project can be identified using the milestone. The completion of each milestone represents the completion of each of the phases. The milestones in this project are as follows: Task NameDurationStartFinish
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4INFORMATION SYSTEMS ANALYSIS AND DESIGN Milestone 1: Initial phase completed0 daysWed 5/9/18Wed 5/9/18 Milestone 2: Planning phase completed0 daysThu 5/24/18Thu 5/24/18 Milestone 3: Implementation phase completed0 daysMon 9/10/18Mon 9/10/18 Milestone 4: Closure phase completed0 daysThu 9/13/18Thu 9/13/18 Approach to System Development UNICEF Child Care has identified the different issues faced by the organization. The system will be developed by the problems such as; supply wastage, inability of getting a proper statement at the year end and staff’s inability to answer calls and emails from the parents most of the times. In this current study, waterfall/gated approach have been used as the project has been defined in a well defined manner. Moreover, the risk involved in this process and the feedback cycles used all through the life cycle are minimal (Valacich, George & Hoffer, 2014). This approach will require a sign off after completion of each of the phases consisting of designing, development, analysis, requirements, implementation, testing and maintenance.This approach uses the Big Bang deployment which means that the whole project gets live at once.
5INFORMATION SYSTEMS ANALYSIS AND DESIGN Systems Requirements As put forward by Fleming and Koppelman, (2016), requirements are the essentials in the project required for successfully executing the project. The system requirements are as follow: Primary functional requirements ï‚·Online deposit system for parents which will send an automated generated mail to them after their transactions. ï‚·The clients will be provided with login ID where the data of each of their transaction will be stored. ï‚·The system of ordering supplies will have to be automated which will be able to manage stocks in a better way. Non functional requirements ï‚·Usability of the frequently used functions will have to be tested multiple times. The critical and the complex functions will also have to be analyzed. ï‚·Reliability of the new system has to be high by keeping the mean time between failures as long as possible.The system should also consist of requirements which will ease the monitoring of the system. ï‚·Performance of the system have to be kept high so system response times and peak times have to be identified to identify the load on the system during the periods of stress. ï‚·Supportability of the system has to be checked so that the new system is cost effective.
6INFORMATION SYSTEMS ANALYSIS AND DESIGN
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7INFORMATION SYSTEMS ANALYSIS AND DESIGN Project Cost Benefit Analysis The cost benefit analysis is used to understand the benefit of the project in terms of cost in future prospective. In this current study, the given discount rate is and appraisal period has been taken as 8years which shows that with each passing year the system will provide considerable profit to the organization. The benefit cost ratio highlights that the benefit achieved in the coming 8 years will be much more than the overall cost of the system in the next 8 years. Cost Benefit AnalysisDevelopment of online deposit and ordering systemOption 1: Wednesday, April 04, 2018 Key Assumptions: Discount Rate6.00% Appraisal period (years)8years Summary of the Results of the Analysis: Capital Costs-$28,480 Whole of Life Costs$925,520 Present Value of Benefits$1,833,823 Present Value of Costs$713,814 Benefit Cost Ratio2.57 Net Present Value$1,120,010 012345678 Year Discount factor (mid-year)0.971290.916310.864440.815510.769350.725800.684720.645960.60940 Discount factor (start of year)1.000000.943400.890000.839620.792090.747260.704960.665060.62741 Benefit 1 - Reduction in staff cost$54,000$64,000$70,000$75,000$100,000$200,000$300,000$400,000$500,000 Benefit 2 -reduction of food wastage$60,000$65,000$75,000$85,000$110,000$110,000$100,000$100,000$100,000 Total Benefits (mid-year)$114,000$129,000$145,000$160,000$210,000$310,000$400,000$500,000$600,000 Present Value of Benefits (mid-yr)$110,727$118,204$125,344$130,482$161,563$224,998$273,887$322,980$365,638 Present Value of Benefits$1,833,823 Cost 1 - Maintenance cost-$6,000-$6,000-$6,000-$6,000-$6,000-$6,000-$6,000-$6,000-$6,000 Cost 2 - Wages-$100,000-$100,000-$100,000-$100,000-$100,000-$100,000-$100,000-$100,000-$100,000
8INFORMATION SYSTEMS ANALYSIS AND DESIGN Total Costs (mid-year)-$106,000-$106,000-$106,000-$106,000-$106,000-$106,000-$106,000-$106,000-$106,000 Capital Costs (at start of year)$28,480$0$0$0$0$0$0$0$0 Total Costs-$77,520-$106,000-$106,000-$106,000-$106,000-$106,000-$106,000-$106,000-$106,000 Total Capital Costs$28,480 Total Whole of Life Costs-$925,520 Present Value of Costs (mid-year)-$102,956-$97,129-$91,631-$86,444-$81,551-$76,935-$72,580-$68,472-$64,596 Present Value of Costs (start year)$28,480$0$0$0$0$0$0$0$0 Present Value of Costs (by year)-$74,476-$97,129-$91,631-$86,444-$81,551-$76,935-$72,580-$68,472-$64,596 Present Value of Costs-$713,814 Net Cash Flows$36,480$23,000$39,000$54,000$104,000$204,000$294,000$394,000$494,000 Net Present Value (by year)$36,250$21,075$33,713$44,038$80,012$148,063$201,307$254,508$301,042 Cumulative NPV$36,250$57,325$91,039$135,076$215,088$363,152$564,459$818,968$1,120,010 Table 1: Cost Benefit Analysis 123456789 -$2 $0 $2Cost Benefit Analysis: Option 1 Present Value of Benefits ($million) Present Value of Costs ($million) Cumulative Net Present Value ($million) Year Todays Dollars ($ millions) Graph 1: Cost Benefit Analysis
INFORMATION SYSTEMS ANALYSIS AND DESIGN9 Project Schedule Task NameDurationStartFinishCost Development of online deposit and ordering system 117 daysWed 4/4/18Thu 9/13/18$28,480.00 1.0 Initiation phase26 daysWed 4/4/18Wed 5/9/18$7,928.00 1.1 Identifying the specification for the new system 7 daysWed 4/4/18Thu 4/12/18$2,856.00 1.2 Map all the necessary functional requirement 10 daysFri 4/13/18Thu 4/26/18$1,520.00 1.3 Map all the necessary user requirement 3 daysFri 4/13/18Tue 4/17/18$480.00 1.4 Prepare first draft of project charter 5 daysFri 4/27/18Thu 5/3/18$800.00 1.5 Discuss with the team members and authorities 2 daysFri 5/4/18Mon 5/7/18$1,952.00 1.6 Prepare final draft of project charter 1 dayTue 5/8/18Tue 5/8/18$160.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
13INFORMATION SYSTEMS ANALYSIS AND DESIGN Figure 1: Gantt chart
14INFORMATION SYSTEMS ANALYSIS AND DESIGN Work Breakdown Structure Development of online deposit and ordering system 1.0 Initiation phase 1.1 Identfying the specifcation for the new system 1.2 Map all the necessary functional requirement 1.3 Map all the necessary user requirement 1.4 Prepare first draft of project charter 1.5 Discuss with the team members and authorities 1.6 Prepare final draft of project charter 1.7 Deploy the final draft of project charter Milestone 1: Initial phase completed2.0 Planning phase 2.1 I Identify the hardware required 2.2dentify the software required 2.3 Identifying the requirement for network development 2.4 Determine the required Databased management Milestone 2: Planning phase completed3.0 Implementation phase 3.1 Upgrading the existing software and hardware 3.2 Develop suitable database 3.3 Integrating the new system 3.4 Conduct Testing 3.5 Identify the modifications required 3.6 Making required changes 3.7 Launching the new system Milestone 3: Implementation phase completed 4.0 Closure phase 4.1 Project and Process review 4.2 Project Document 4.3 Project Member Sign off Milestone 4: Closure phase completed Figure 2: Work Breakdown Structure
15INFORMATION SYSTEMS ANALYSIS AND DESIGN System Information Requirement Investigation Techniques The system information requirement investigation techniques used in the project are surveysandinterviews,reviewingexistingsimilarsystems,developingprototypesand conducting sessions for joint application design (Laudon & Laudon, 2016). These processes will be used to investigate the requirements and the different ways it can be mitigated. Reflections and Conclusions This report has been able to develop a successful project plan with a costs benefit analysis which shows that the project will be highly beneficial for the organization. The project schedule shows most of the tasks are critical tasks and changes can only brought to the non critical tasks.Thus, it can be concluded that if the project requirements are followed as per the plan, the organization will benefit from installing the new system.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
16INFORMATION SYSTEMS ANALYSIS AND DESIGN References Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management. Project Management Institute. Harrison, F., &Lock,D.(2017).Advancedprojectmanagement:astructuredapproach. Routledge. Jaber, H., Marle, F., Vidal, L. A., & Didiez, L. (2018). Criticality and propagation analysis of impacts between project deliverables.Research in Engineering Design,29(1), 87-106. Kerzner, H., & Kerzner, H. R. (2017).Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Laudon, K. C., & Laudon, J. P. (2016).Management information system. Pearson Education India. Montoya, J. H., & Persson, K. A. (2017, April). The Materials Project: Milestones, Challenges, and Opportunities in High-Throughput Computational Materials Science. InMeeting Abstracts(No. 35, pp. 1666-1666). The Electrochemical Society. Valacich, J., George, J., & Hoffer, J. (2014).Essentials of systems analysis and design. Prentice Hall Press.