logo

Assessing Relevance of Systems Engineering to Project Cases

   

Added on  2023-01-11

2 Pages544 Words90 Views
 | 
 | 
 | 
VARUN THATIKONDA / 12068175 - PPMP20012 Unit Portfolio for Week 3
Week 3 Topic: Assess the relevance of systems engineering to project cases
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Mandatory
Readings
Part 2:
Foundations of
Systems
Engineering
-'Knowledge Area:
Representing
Systems with
Models';
–Part 6: Related
Disciplines
-'Knowledge Area:
Systems
Engineering and
Industrial
Engineering';
–Part 6: Related
Disciplines
-'Knowledge Area:
Systems
Engineering and
Specialty
Engineering';
Optional
Readings
Kerzner (2013)
1. Assess the
relevance of
systems
engineering to
project cases
From the study and learning materials discussed in week 3 I
have came to know about the system classifications and
engineered system classifications. The systems are classified
into structures, humans, control and social and families on the
other hand, the engineered systems are driven by stakeholders,
created, used, sustained for achieving mission, vision, goals and
purpose of the project. From the week 3 study unit I came to
know about the difference between system sciences and system
thinking. The concept of system thinking cannot be executed
without system concept and system patterns and principles. In
main cases the system approaches are applied to engineered
systems. The Ideas of system thinking are represented through
model based system engineering. I have learned that, models
are much complete, semantically rich as well as complete. In
order to execute any project different types of systems are used.
The system are created and used to deliver services and
products in various working environment to give commercial
benefits to both the stakeholders and users as well.
Apart from that, system life cycle processes are also illustrated
in the week 3 study materials. The different system life cycle
processes approaches by the project executives are agreement
process, technical management process and technical process.
The degrees of risks are calculated based on time and
functionalities. It is applicable in research and development
department, manufacturing department and marketing
department. In order to identify and resolve risks I came to
know about importance of risk control, risk intensity, risk
tolerance also.
PPMP 20012
Program & Portfolio
Information Systems
Lecture 3 for Week
3
1 of 2
Assessing Relevance of Systems Engineering to Project Cases_1

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Advantages and Disadvantages of Manual and Electronic PPPM Application Systems
|2
|552
|20

Identify Different Systems Thinking Tools and Techniques for Project Managers
|2
|544
|41

How Systems Engineering Concepts and Methodologies Help Project Managers Organize Projects
|2
|531
|26

Relevance of Systems Thinking to PM
|4
|1337
|68

Contemporary Developments in the Use of PM Application Systems
|2
|525
|30

Propose appropriate PM application systems for successful project execution in infrastructure and resource industries
|2
|564
|39