Running head: PROJECT MANAGEMENT
Post Implementation Review Plan
Name of the Student:
Name of the University:

PROJECT MANAGEMENT1
Table of Contents
Consistency of project results with business case......................................................................2
Identify project goals attained....................................................................................................2
Analyze stakeholder satisfaction................................................................................................2
Analyze project cost and benefits..............................................................................................3
Future development needs..........................................................................................................3
Document lessons learned..........................................................................................................3
References..................................................................................................................................5

PROJECT MANAGEMENT2
Consistency of project results with business case
In order to determine if the project results are consistent with the business case, at first
it is required to determine whether the project is kept on its original project timeline. The
project manager should determine project progress by updating the project schedule on
regular basis. A weekly evaluation is done at end of project stage to update the schedule to all
the project stakeholders (Kerzner, 2019). Quality review is also done to check quality of the
project management practices by checking if the project deliverables are delivered as it is
planned.
Identify project goals attained
Marchewka (2016) mentioned that measuring the project goals to be attained or not, it
should require to determine if the project objectives are achieved in provided framework. If
the project is completed on scheduled time as well as estimated budget, then the project
manager can meet with its project objectives to achieve project goals.
Analyze stakeholder satisfaction
The satisfaction level of stakeholder is analyzed by measuring the perception of the
stakeholders of the new website development project. It is also measured by asking the
project stakeholders to rate the satisfaction on numerical scale.
Online survey is conducted to know as well as measure the satisfaction rate of the
stakeholders with project progress. The project manager generates list of the questions for the
stakeholders to collect input (Heldman 2018).
Brainstorming session is also conducted to get input from the stakeholders involved in
scheduling meetings as well as facilitating discussion about progress of project team.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Initiating and Planning Project Assignment 2022
|10
|1666
|13

Lessons Learnt Presentation for PPMP20008 - 2018 Term1
|15
|1149
|352

PROJECT MANAGEMENT.
|4
|392
|68

Develop a project scoping document | Assessment
|20
|4675
|12

Website Development Project for Native Bush Spices Australia | Report
|14
|1858
|84

Project Management
|6
|1072
|48