This project management plan includes research aim and objectives, quality, deliverables, risk, communication resources along with the research methods for a successful business project on workplace transformation in retail industry.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Unit 6 Managing a Successful Business Project (To identify the need of workplace transformation in the digital age to improve workforce satisfaction and organisational performance within retail industry)
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents INTRODUCTION...........................................................................................................................1 MAIN BODY...................................................................................................................................1 PART 1............................................................................................................................................1 P1 Determining the different stages of Project Lifecycle along with its significance for the success of project........................................................................................................................1 P2 Identifying the factors which is required for complaining a project management plan.........2 P3Analysing a extent of research strategies and methods as well as their significance in project management.....................................................................................................................3 P4 Making a project management plan that includes research aim and objectives, quality, deliverables, risk, communication resources along with the research methods..........................5 P5 Developing a work breakdown structure along with a schedule for providing stages and time-frames to complete the project successfully........................................................................7 LOGBOOK......................................................................................................................................9 PART 2..........................................................................................................................................13 P6 Conducting a business project as stated within the PMP and communicating findings.......13 Frequency Distribution Table....................................................................................................13 Data Interpretation.....................................................................................................................14 P7 Presenting the data to draw a valid and meaningful conclusions and recommendation from data analysis...............................................................................................................................19 P8 Reflect on the value of undertaking the business project to meet stated objectives and own learning and performance..........................................................................................................19 REFERENCES..............................................................................................................................21 APPENDIX....................................................................................................................................23 Questionnaire.............................................................................................................................23
INTRODUCTION Execution of the project in successful manner is essential for every project manager for producing the effective outcome from it. It is important for project manager to design, arrange and oversees the operation in better manner for accomplishing the desired objectives and increasing the growth of the business(LONG, 2022). The current research is conducted to find theneedofworkplacetransformationinthedigitalageforimprovingtheirworkforce satisfaction as well as organisational performance. Selected organisation of the following research is Next Plc, a multinational retail organisation of United Kingdom. The company is focus on enhancing the experience as well as satisfaction level of their customers through their effective products and service. MAIN BODY PART 1 P1 Determining the different stages of Project Lifecycle along with its significance for the success of project The project management lifecycle is used to describes thehigh level processes in order to deliver a successful project. Effective project management help companies to get prevent from the waste of money as well as resources because most of the unsuccessful projects fails due to breakdown in communication (Galli, 2018). In the stage of the project management lifecycle, the project manager come up with the idea for a project, defining its goals, conduct planning for its execution as well as provide guidance for its completion. There mainly four stages within project management lifecycle that are defined as initiation, planning, execution as well as closure. In relation to current research project, these stages are described below: Initiation-It refers to the first stage that project manager to identify the problem, need or opportunity as well as insight ways that help team to meet this need, seize this opportunity or solve this problem (Beagley, 2022). In this step, project manager need to identify the objective of the project, determine its feasibility as well as deliverables for the project. The initiation stage is considered as the important stage for the success of the project. The project proposal, RACI chart and project charter are some tools which is used in this stage. Planning-In this stage of project management life cycle, the project manager need to break down the whole project into smaller tasks, develop an effective as well as prepare a 1
schedule for the completion of assignments(Kim, Lee and Kim, 2020). By creating smaller goals for the larger projects, project manager need to ensure that each goals should achieve within the time-frame. Gantt chart and risk register are some tools that are used in this stage that helps in making project successful. Execution-This stage of project management lifecycle help project manager to convert its project plan into action. In the stage, the project manager need to focus on that the all the tasks are on track, team members are organised properly, timelines are managed as well as ensure that the all the tasks are completed in accordance with original plan(Lin and Cheung, 2020). Change requests and Burn-down chart are some tools which may used by the project manager in order to accomplish the whole project in better manner. Closure- It refers to the final stage of project management lifecycle when all the tasks of the project are completed then project enter in its closure stage. In the closure stage, the project manager need to provide final deliverables, release project resources as well as determining the success of the project(Klünder, Dörseln and Steven, 2019). The project manager also need to evaluate what is going to be good and what wrong in the project in order to improved them for the success of next project. In this stage, the Impact report and Project close out report are tools which is used by the project manager in order to evaluate the project performance. P2 Identifying the factors which is required for complaining a project management plan Project management plan is a kind of approved and formal document that helps project managers in order to define the monitor, execution as well as controlling of project(Rahman, 2020). While compiling the project management plan the project manager need to consider certain factors that helps in making the project successful. It involves goals, scope, budget, timelines and deliverables of a project. In relation to the current conducted research, factors that are need to be considered for making it successful are described below: Deliverables- It is used to describes how the large projects will be break down into different measurable deliverables. It helps in clarifying the different project objectives along with the activities which is required to complete the whole project(Roy, 2021). It is a most important factors for project management plan as it allows project managers, clients and other stakeholders to know about the progress make by the team. Quality-It describe the factors that helps project manager to determine the ability of their plan that provide success of the project. The project manager need to identify that what kind of 2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
information is to gather for making the quality of project(Munyaneza, 2020). In case of current research, the researcher identify that quantitative data and information is required to collect for making it high quality. Risk-It refers to the those factors that help project manager in order identify, address and control issues that may occur while conducting the project. It is also important for completing the project on time as well as making it successful(Tolla, 2020). In case of present research project, there are many risk factors that create problem for the researcher in order to complete it in proper many. It involves low cost, less time, insufficient resources as well as security risk. Communication- It refers to a process through which project manager interact with the stakeholders for the completion of the project(Ravelomanalina, 2020). There are many methods through which project managers can communicate with their stakeholdersin proper manner such as survey, interview, emails and many more. In respect of current research project, survey strategy and emails are used by the researcher to complete the whole research properly. Resources-It refers to a thing which is to conduct the whole project in better manner. There are many resources which can be used by the researcher to collect the information for the following research such as books, journals and questionnaire(Ndayambaje,2021). These resources helps in attaining the aim and objectives of the research project in better manner. P3 Analysing a extent of research strategies and methods as well as their significance in project management Research methodologies is describe the way that explain how a researcher intends to conduct the research project in better manner. It can also be considered as systematic plan that help in resolving the research problem in better manner(Hechter, 2019). The research onion is aneffectiveframeworkthatclassifytheresearchmethodologyindifferentmethodsand techniques in order to make easier for the researcher to complete the whole research in better manner. In context of current research project, the methods and strategies are used to complete it successfully are described below: Research Approach-Inductive and deductive positivism research philosophyare two types of research approach that helps in collecting and analysing the data for the research. The researcher selected deductive research approach in the current research project as it helps in gathering and examining the quantitative data related to research topic(Humble, 2020). The 3
primary motive for the selection of this research topic is it allows researcher to use their logic to justify work related decision in the research. Research philosophy-It is classified in two parts that are defined as interpretivism and positivism. In context of present research project, positivism research philosophy is used as it helps researcher to take large scale surveys for getting an overview about the whole society as well as uncover the social trends(Zhang, 2019). The primary reason for the selection of this research philosophy is to obtain accurate and reliable information related to the research topic. Research Strategy- Different kinds of research strategies are available in research methodology like case study, action research, survey, interview, observation and many more. Survey research strategy has been selected by the researcher in order to collect large amount of information from the large population(Conway, 2019). This main motive for the selection of this research strategy is it is an convenient method in order to collect data for the research. Research choice- Qualitative and quantitative are two major form of research choice that helps in collecting and analysing the specific kind of information. Quantitative research choice is used by the researcher for collecting and analysing the numerical information related to the research topic (Patel, Shah and Shah, 2020). The primary reason for the selection of this research choice to attain greater knowledge and understanding related to the social world for conducting the research in well manner. Time horizon- It is classified in two parts that are defined as longitudinal and cross- sectional time horizon. In case of current research project, cross-sectional time horizon is selected in order to conduct the whole research in less time(Facchin, Buggio and Saita,2020). The main motive for the selection of this research topic is it helps in comparing the many different variables in similar time. Data collection-It is classified in two categories that are primary and secondary data collection method. Both the data collection methodsused in current research project as it helps in collecting information directly from the participants along with the several sources(Liang, Leung and Ahmed, 2021). The primary reason for the selection of these data collection method is it is a cost and time effective method that helps researcher to gain reliable information related to the research topic. Dataanalysis-Differentkindofdataanalysismethodsareavailableinresearch methodology such as thematic, frequency distribution , etc. The researcher selected frequency 4
distribution data analysis techniques in order to calculate and evaluate numerical information related to the research topic(Hou and Wen, 2020). The basic reason for the selection of this research is it helps in summarizing and organising the raw data in tabular format. Sampling- Probability and non-probability are two kinds of sampling methods that helps in selecting samples from the large population. In context of current conducted research, probability sampling used for collecting the information from the equal number of respondents. In the following research researcher selects 30 respondents through random sampling(Ahmed, and Ali, 2022). P4 Making a project management plan that includes research aim and objectives, quality, deliverables, risk, communication resources along with the research methods Research Aim: To identify the need of workplace transformation in the digital age to improve workforce satisfaction and organisational performance. “A study on Next Plc” Research Objectives: To develop understanding and need of workplace transformation within retail industry To investigate the advanced technologies of workplace transformation used by Next Plc for employees to carry out their roles and collaborate To examine the impact of workplace transformation on workforce satisfaction and organisational performance within Next Plc Research Questions: Explain the concept and need of workplace transformation within retail industry? What are the advanced technologies of workplace transformation used by Next Plc for employees to carry out their roles and collaborate? Whatistheimpactofworkplacetransformationonworkforcesatisfactionand organisational performance within Next Plc? Deliverables: 5
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
The deliverables allows researcher in order to classify the whole project into several tasks along with the various measurable variables. In case of current research project, the whole research projects is divide in different tasks and each tasks is allotted in different measurable deliverable within 28 weeks(Rasoarimalalanarivo, 2020). The different tasks of the whole researchprojectsinvolvesintroduction,aimsandobjectives,literaturereview,research methodology, data collection, data analysis, conclusion and recommendation, reflection as well as submission of the final report. Quality: In case of current conducted research, the quality of the research is very high as the researcher collects data and information through quantitative research methods as it helps in making the whole research more reliable and valuable(Kibangula, 2020). It helps in making the whole research project successful. The researcher collected information by directly asking questionsfromtherespondentsthathelpsresearchertocollectaccurateandup-to-date information for the research. It also helps in making the quality of the research project high to make it successful. Risk: The researcher need to identify the risk along with the method to mitigate it in order to make the whole project successful. In context of current research, there are many risk factors that create problem for the researcher in order to complete the whole research in successful manner. Low cost is one of the risk in the current research project and the respondents used questionnaire in order to collects information in less cost(de Oliveira, 2021). Time is another risk where the researcher used Gantt Chart to mitigate limited time risk. Limited resources are also a risk for the researcher where theresearcher collected information the different sources such as books, journals and scholarly articles. Security risk is another risk that create problem for the researcher to complete the research properly. By protecting privacy and confidentiality of the respondents the researcher mitigate security risk. Resources: The researcher uses different resources to collect valuable information and data for the current research project(El Kabbag, 2019). It involves questionnaire, books, journal, scholarly 6
articles and many more. These resources arehelpful in making whole research project successful. Research methods It refers to the method or techniques which is used to complete the whole research project in better manner. In context of present research project, the researcher uses quantitative research methods as it allows them to collect numerical information about the facts and figures of research topic in effective manner(Mohamoud, 2019). P5 Developing a work breakdown structure along with a schedule for providing stages and time- frames to complete the project successfully Work breakdown structureis described the project management tool that involves step- by-step approach in order to complete the large projects through several moving pieces. In context of current research project, Gantt chart is used in order to breakdown and schedule the whole research project for providing different stages and time-frames. Gantt chart is mainly described the project management tool that help project manager to analyse the schedule planning of different project tasks(Joshi and Goyal, 2019). It is display in the form of bar chart that helps in illustrating the schedule of the research project. It provides graphical illustration of project schedules that help project managers in order to make a plan, analyse as well as coordinate the task in better manner. Gantt chart makes the things easier and simpler that help researcher in orders to complete the research project successfully. 7
8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Project Log Book Project Logbook For MSBP Learning Week No:(Project Week no. ) Date: No.Planned ActivitiesAction Plan 1Update your last week’s workData Collection and Data Analysis 2Problem encountered and how did you handle the problem? Points to consider: What barriers did you face? Time management How did you overcome them? By using Gantt chart 3Task for this weekWhathaveIlearntaboutmyselfthis week? Points to consider: How did you feel when you had to deal with tasks/problems? Did you find it useful to complete the tasks? I am get frustrated in order to deal with the tasks or problems. Yes I found that it is useful to complete the tasks. How well have you perform? What did you contribute? What can you improve on next week? According to my opinion I perform very well.Ihavecollectedin-depth information about the research topic. I can improve time management on next week. 10
How might this learning apply in the future? By completing given tasks on time, I will apply my this learning in the future. 4Risk issues identified.Points to consider: Did you identify risks/issues with a lack of skillsrequiredforundertaking research/tasks? Yes, I found risks with a lack of skilled is thatIfacedproblemofincomplete research. wasthereanyprojectissuewhichwere highlightedinfrontof youwhileyou're performing the project management plan? No 5Plan your tasks for next weekPoints to consider: Which tasks are priorities? Data Collection and interpretation Have you set aside adequate time for pass completion? Yes 6Project plan status till date (on/ahead / behind) If behind, why? Till now, I have completed my all tasks on time.AndIalreadyconductmydata analyses and findings. 7Remarks by the lecturer if any Student Full Name, Registration No. 11
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Student Signature and Date Lecturer’s Name, Signature, and Date 12
PART 2 P6Conducting a business project as stated within the PMP and communicating findings Frequency Distribution Table Q1) Do you think workplace transformation is necessary in this digital world? Frequency a) Yes25 b) No5 Q2) As per your opinion, what is the requirement of workplace transformation within retail industry? Frequency a) To make workforce work independently4 b) To reskill and build the apt talent pool6 c) To build new business model expertise8 d) To increase social interaction and collaboration5 e) To integrate several business dimensions systematically7 Q3) According to your knowledge, which advanced technology is the best adopted by Next Plc for employees to carry out their roles and collaborate? Frequency a) Chatbots6 b) Virtual assistants8 c) IoT5 d) Sentiment analysis7 e) Data analytics4 Q4) As per your knowledge, what is the impact of workplace transformation on workforce satisfaction within Next PLc? Frequency a) Positive impact21 13
b) Negative impact5 c) Neutral impact4 Q5) What is the major benefit experienced by Next Plc through workplace transformation on organisational performance? Frequency a) Empowered and encouraged employees5 b) Better communication and collaboration7 c) Recruitment of top candidates9 d) Increased flexibility4 e) Decreased operational costs5 Data Interpretation Table1: Workplace transformation is necessary in this digital world Q1) Do you think workplace transformation is necessary in this digital world? Frequency a) Yes25 b) No5 14
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
a) Yesb) No 0 5 10 15 20 25 25 5 Figure1: Workplace transformation is necessary in this digital world Interpretation:As per the above assembled information, it is carried out that 25 respondents have given response yes that workplace transformation is necessary in this digital world because it helps in transforming the whole organisation in such a way that employees get satisfied and operations could be improved. The rest 5 respondents have answered no thatworkplace transformation is not necessary in this digital world because there are many other elements which hold more importance in the organisation. Table2: Requirement of workplace transformation within retail industry Q2) As per your opinion, what is the requirement of workplace transformation within retail industry? Frequency a) To make workforce work independently4 b) To reskill and build the apt talent pool6 c) To build new business model expertise8 d) To increase social interaction and collaboration5 e) To integrate several business dimensions systematically7 15
0 2 4 6 8 4 6 8 5 7 Figure2: Requirement of workplace transformation within retail industry Interpretation:According to the given data, it is observed that 8 participants have answered that building new business model expertise is the major requirement of workplace transformation within retail industry because it assists in operating with the model that can yield more profit and revenue. Another 7 participants have answered that integrating several business dimensions systematically is the other need of workplace transformation because it makes each department to work in the same direction. Another 6 participants have said that reskilling and building the apt talent pool is another need to adopt strategies of workplace transformation. Table3: Advanced technology is the best adopted by Next Plc for employees to carry out their roles and collaborate Q3) According to your knowledge, which advanced technology is the best adopted by Next Plc for employees to carry out their roles and collaborate? Frequency a) Chatbots6 b) Virtual assistants8 c) IoT5 16
d) Sentiment analysis7 e) Data analytics4 a) Chatbots b) Virtual assistants c) IoT d) Sentiment analysis e) Data analytics 0 1 2 3 4 5 6 7 8 6 8 5 7 4 Figure3: Advanced technology is the best adopted by Next Plc for employees to carry out their roles and collaborate Interpretation:With the above gathered data, it is evaluated that virtual assistants is the advanced technology which is mainly adopted by Next Plc for employees to carry out their roles and collaborate. Virtual assistants provide great help to the employees so that they easily perform their roles and collaborate with other employees of the organisation. Table4: Impact of workplace transformation on workforce satisfaction Q4) As per your knowledge, what is the impact of workplace transformation on workforce satisfaction within Next PLc? Frequency a) Positive impact21 b) Negative impact5 17
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
c) Neutral impact4 a) Positive impactb) Negative impactc) Neutral impact 0 5 10 15 20 25 21 54 Figure4: Impact of workplace transformation on workforce satisfaction Interpretation:As per the above assembled information, it is analysed that 21 respondents have answered that there is positive impact of workplace transformation on workforce satisfaction within Next Plc. There is positive impact because it allows employees to work with greater efficiency with the help of advanced technology. The other 5 respondents have said that there is negative impact of workplace transformation on the satisfaction of workforce because some employee resist the process of transforming the workplace. The rest 4 participants have said that there is neutral impact of workplace transformation because it has not created any additional benefits. Table5: Benefit experienced by Next Plc through workplace transformation on organisational performance Q5) What is the major benefit experienced by Next Plc through workplace transformation on organisational performance? Frequency a) Empowered and encouraged employees5 b) Better communication and collaboration7 18
c) Recruitment of top candidates9 d) Increased flexibility4 e) Decreased operational costs5 0 2 4 6 8 5 7 9 45 Figure5:BenefitexperiencedbyNextPlcthroughworkplacetransformationon organisational performance Interpretation:As per the above collected information, it is determined that 9 respondents have answered that recruiting top candidates is the major benefit experienced by the company through workplace transformation on organisational performance. It is understood that with this they get employees who are talented and skilled. P7 Presenting the data to draw a valid and meaningful conclusions and recommendation from data analysis Conclusion From the above discussion, it has been analysed that workplace transformation in the digital age plays a very important for improving the workforce satisfaction as wellas 19
organisational performance in order to achieve the organisational goals and objectives in effective manner. There are many factors that shows that workplace transformation within an organisation is necessary. It involve making workforce work independently, building new business model expertise, reskilling and building the apt talent pool, integrating several business dimensions systematically as well as increasing social interaction and collaboration. It is important for the company to adopt advanced technology that helps their employees to carry out their roles and collaborate in better manner. Chatbots, IoT, Data analytics, virtual assistants, as well as sentiment analysis are some advanced technologies that help company to transforms their workplace. The research analysed that workplace transformation provide positive impact on workforce satisfaction.There are many benefits that an organisation gain through workplace transformation such as better communication and collaboration, empowered and encouraged employees, increased flexibility, recruitment of top candidates as well as decreased operational costs. Recommendation From the above analysis, it has been analysed that workplace transformation is necessary for improving the organisation performance and workforce satisfaction. It is recommended to Next Plc to focus on providing proper learning and training sessions for their employees that help in improving their skills and knowledge that helps them to give their best efforts in their performance. It helps company to achieve their organisational goals and objectives in effective manner. The learning and training programs helps in providing the opportunity to employees in order to learn something new as well as create within the workplace. P8 Reflect on the value of undertaking the business project to meet stated objectives and own learning and performance. I am thankful that I got learning opportunity through conducting an investigation. With the help of conducting current investigation I have learnt that workplace transformation is one of the concepts that assist an organisation to make changes in the atmosphere of the company as per the changes taking place in the external environment. I have understood that it is necessary to have patience while doing any work because it helps in facing any challenge without any difficulty or frustration. I have also learnt that an organisation uses several types of advanced technology to transform the workplace such as using online communication channels for interacting and communicating with the higher authorities as well as other employees. I have 20
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
taken assistance of several research methods to record and analyse information. I have taken help of quantitative research methods because they helped in the accumulation of numerical and statistical piece of information. With the assistance of numerical information I have got the results which can be easily compared and measured. With the current study, I have determined my certain strengths and weaknesses. The major strength which is identified by me is that I am great in communication skill and I was able to assemble great piece of information from the respondents due to my great interaction skills. The other important strength carried out by me is that I am great at solving problems. I learn about the in-depth of problem and all the possible alternatives to solve the issue. The weakness identified by me in the current study is that I am not great at working as per the defined time duration. 21
REFERENCES Books and Journals: Galli, B.J., 2018. Can project management help improve lean six sigma?.IEEE Engineering Management Review,46(2), pp.55-64. Beagley, B., 2022. A Lifecycle Approach to Operation and Maintenance on the Toowoomba Second Range Crossing Project. Kim, K., Lee, G. and Kim, S., 2020. A study on the application of blockchain technology in the construction industry.KSCE journal of civil engineering,24(9), pp.2561-2571. Lin, Y.C. and Cheung, W.F., 2020. Developing WSN/BIM-based environmental monitoring management system for parking garages in smart cities.Journal of Management in Engineering,36(3), p.04020012. Klünder, T., Dörseln, J.N. and Steven, M., 2019. Managing Uncertainties in the Project 4.0 Lifecycle. InAgile Approaches for Successfully Managing and Executing Projects in the Fourth Industrial Revolution(pp. 119-140). IGI Global. LONG, B., 2022. FIRE SAFETY MANAGEMENT PLAN FOR SOUTH TEXAS PROJECT TURBINE GENERATOR BUILDING. Rahman, M., 2020. Bangladesh-SOUTH ASIA-P128276-Coastal Embankment Improvement Project-Phase I (CEIP-I)-Procurement Plan. Roy,G.,2021.Bangladesh-SOUTHASIA-P161996-SustainableForestsandLivelihoods (SUFAL) Project-Procurement Plan. Munyaneza, G., 2020. Rwanda-AFRICA EAST-P150844-Rwanda Urban Development Project- Procurement Plan. Tolla, L., 2020. Ethiopia-AFRICA EAST-P157716-Promoting young women? s livelihoods and nutrition project-Procurement Plan. Ravelomanalina, R.M., 2020. Madagascar-AFRICA-P159756-Integrated Urban Development and Resilience Project for Greater Antananarivo-Procurement Plan. Ndayambaje,A.,2021.Burundi-AFRICAEAST-P169315-BurundiIntegratedCommunity Development Project-Procurement Plan. Rasoarimalalanarivo, S., 2020. Madagascar-AFRICA-P159756-Integrated Urban Development and Resilience Project for Greater Antananarivo-Procurement Plan. Kibangula, A.A., 2020. Eastern Africa-AFRICA EAST-P143307-AFR RI-Regional Great Lakes Integrated Agriculture Development Project-Procurement Plan. de Oliveira, F.C.C., 2021. Brazil-LATIN AMERICA AND CARIBBEAN-P147157-BRAZIL BAHIA SUSTAINABLE RURAL DEVELOPMENT PROJECT-Procurement Plan. El Kabbag, N.N.R., 2019. Egypt, Arab Republic of-MIDDLE EAST AND NORTH AFRICA- P145699-Strengthening Social Safety Net Project-Procurement Plan. Mohamoud,F.A.,2019.Somalia-AFRICA-P154875-SomaliaRecurrentCostandReform Financing Project-Phase 2-Procurement Plan. Ahmed, A. and Ali, S., 2022. Lessons learned from adapting a quantitative to an emergent mixed methodsresearchdesigninPakistanduringCOVID-19.InternationalJournalof Research & Method in Education, pp.1-17. Liang, Q., Leung, M.Y. and Ahmed, K., 2021. How adoption of coping behaviors determines constructionworkers’safety:Aquantitativeandqualitativeinvestigation.Safety Science,133, p.105035. 22
Facchin, F., Buggio, L. and Saita, E., 2020. Partners' perspective in endometriosis research and treatment: A systematic review of qualitative and quantitative evidence.Journal of Psychosomatic Research,137, p.110213. Patel, D., Shah, D. and Shah, M., 2020. The intertwine of brain and body: a quantitative analysis on how big data influences the system of sports.Annals of Data Science,7(1), pp.1-16. Conway, E., 2019. Quantitative impacts of mandatory integrated reporting.Journal of Financial Reporting and Accounting. Zhang, M., 2019. Towards a quantitative model of understanding the dynamics of collaboration in collaborative writing.Journal of second language writing,45, pp.16-30. Humble, S., 2020.Quantitative analysis of questionnaires: Techniques to explore structures and relationships. Routledge. Hechter, M., 2019. The future of rational choice theory and its relationships to quantitative macro-sociologicalresearch.InRationalChoiceTheoryandLarge-ScaleData Analysis(pp. 281-290). Routledge. Hou, K. and Wen, J., 2020. Quantitative analysis of the relationship between land use and urbanization development in typical arid areas.Environmental Science and Pollution Research,27(31), pp.38758-38768. Joshi, A. and Goyal, S.B., 2019, November. Comparison of Various Round Robin Scheduling Algorithms. In2019 8th International Conference System Modeling and Advancement in Research Trends (SMART)(pp. 18-21). IEEE. 23
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
APPENDIX Questionnaire Q1) Do you think workplace transformation is necessary in this digital world? a) Yes b) No Q2) As per your opinion, what is the requirement of workplace transformation within retail industry? a) To make workforce work independently b) To reskill and build the apt talent pool c) To build new business model expertise d) To increase social interaction and collaboration e) To integrate several business dimensions systematically Q3) According to your knowledge, which advanced technology is the best adopted by Next Plc for employees to carry out their roles and collaborate? a) Chatbots b) Virtual assistants c) IoT d) Sentiment analysis e) Data analytics Q4) As per your knowledge, what is the impact of workplace transformation on workforce satisfaction within Next PLc? a) Positive impact b) Negative impact c) Neutral impact Q5) What is the major benefit experienced by Next Plc through workplace transformation on organisational performance? a) Empowered and encouraged employees b) Better communication and collaboration c) Recruitment of top candidates d) Increased flexibility 24