ISY3002 Project Management Plan and Website Re-construction Report

Verified

Added on  2023/01/16

|16
|3879
|45
Report
AI Summary
This report details a website re-construction project, focusing on the development of a project management plan (PMP) and software requirements specification (SRS) for the website. The project involves redesigning the website http://www.instituteofknowledge.com.au/about to enhance user experience and customer attraction. The report includes an abstract, introduction, aim, and a comprehensive overview of the website's functional and non-functional requirements. It also features a detailed project management plan, including a project charter, work breakdown structure (WBS), project schedule, and risk management plan. Furthermore, the report outlines system and security requirements, use case diagrams and concludes with references. The project aims to improve website performance, user interface, and overall design to achieve better engagement and revenue generation.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
qwertyuiopasdfghjklzxcvbnmqw
ertyuiopasdfghjklzxcvbnmqwert
yuiopasdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwertyuiop
asdfghjklzxcvbnmqwertyuiopasd
fghjklzxcvbnmqwertyuiopasdfgh
jklzxcvbnmqwertyuiopasdfghjkl
zxcvbnmqwertyuiopasdfghjklzxc
vbnmqwertyuiopasdfghjklzxcvb
nmqwertyuiopasdfghjklzxcvbnm
qwertyuiopasdfghjklzxcvbnmqw
ertyuiopasdfghjklzxcvbnmqwert
yuiopasdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwertyuiop
asdfghjklzxcvbnmqwertyuiopasd
fghjklzxcvbnmqwertyuiopasdfgh
jklzxcvbnmrtyuiopasdfghjklzxcv
Website Re-construction Project
Project Management Plan
5/9/2019
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Website Re-construction Project
Table of Contents
Abstract.................................................................................................................................................2
Introduction/Organization.....................................................................................................................3
Aim........................................................................................................................................................3
Requirements of the website................................................................................................................3
Functional requirements...................................................................................................................3
System requirements........................................................................................................................5
Domain & Security requirements..................................................................................................5
Other requirements.......................................................................................................................6
Non-Functional requirements...........................................................................................................6
Project Management Plan (PMP)..........................................................................................................8
Project Charter...................................................................................................................................8
Work Breakdown Structure (WBS).................................................................................................10
Project Schedule..............................................................................................................................11
Risk Management Plan....................................................................................................................11
Use case diagram.................................................................................................................................14
Conclusion...........................................................................................................................................14
References...........................................................................................................................................15
Document Page
Website Re-construction Project
Abstract
The re-designing of the website with the link of the website as
http://www.instituteofknowledge.com.au/about shall be done. The document includes website
redesigning requirements as well as the charter and project management plan for the project.
Document Page
Website Re-construction Project
Introduction/Organization
The project is the re-construction of the website
http://www.instituteofknowledge.com.au/about and the sponsor of the website is Dr Syed
Ahmed. The changes in the website include the modification of the website logo along with
the changes in the home page of the site. The re-construction of the website will be done in
order to gain enhanced customer attraction and user experience levels. This will result in the
enhancement of the revenues and profits earned by the website.
Aim
The aim of the project is to re-construct the website to gain enhanced level of user and
customer experience.
Requirements of the website
Broadly, the website re-design project has category of requirements. The first one being
functional requirement and the second one being non-functional requirement. Functional
requirements cater to those requirements that the website or the application is expected to
perform and the non-functional requirement covers those aspects of the design that includes
how the application is expected to perform. First, the functional requirements would be
covered. These are elaborated below.
Functional requirements
ï‚· Clicking the logo on any page on the website will navigate back to the homepage.
ï‚· The logo will appear on top of the page on the left side on all possible renders of the
website.
ï‚· Any link to any object such as Word, PDF, PowerPoint will open in a new window on
all web-browsers.
ï‚· Footer will display relevant information such as
o Copyright information
o Link to the contact information
o Link to social accounts
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Website Re-construction Project
o Link to policies and terms and conditions.
o The footer will also include a sitemap of the entire site and will link to all
static pages of the website.
ï‚· The logo, content and images presented on the website will be in a format that allows
for a smooth resizing as and when the web-page is being resized.
ï‚· The website should allow users to create account based on their preferences. At the
same time, a registered user should be able to login into the account, change its
password and email as per their needs.
ï‚· A registered and logged in user should also be able to logout from the website.
ï‚· The Homepage should link to Tier-1 pages of the website.
ï‚· The tier 1 pages should link to Tier-2 pages of the website and so on.
ï‚· The website should have an optimized coding such that it consumes minimal
computational requirements of the client. These includes reduction in the usage of
bandwidth, the processor, the video ram as well as the ram of the client.
ï‚· The website should also be optimized to put minimal load on the server side as well
so that the server is not overloaded during unusual and spikes in traffic.
ï‚· The website should have an error-check mechanism built in and should be put to use
wherever possible. These includes areas such as form-input wherein any invalid entry
should be highlighted and a message should be shown to the user to the correct in the
invalid entry.
ï‚· The website should display a loading message or a waiting sign so as to let the user
know that they are supposed to wait when the contents of the page are being loaded.
ï‚· The website should also be capable of recovering from any voluntary or involuntary
errors and display messages and alerts accordingly.
ï‚· The website should be rendered appropriately on all modern web browsers and there
should not be any rendering or visual glitch in any of the modern web browsers
available on both desktop or mobile based devices.
Document Page
Website Re-construction Project
System requirements
ï‚· The website should be redesigned using the latest available technologies on website
development and design. These includes the usage of HTML5 technology, the latest
MySQL technology for database, PHP7 for coding the logic of the website as well as
CSS3 for designing and styling of the website.
ï‚· The minimum system requirements for the website is as follows Ubuntu 19 as the
Linux server or any comparable modern Linux server, an SSD hosting with minimum
320 GB storage, a minimum of 4GB of Ram as well as gigabit-based bandwidth.
ï‚· The website must have caching enabled and that it should make use of CDN or
Content Delivery Network for performance optimization. This will allow the website
to speed up while reducing the load on the original servers as the content are cached
and distributed across a variety of servers in the world.
Domain & Security requirements
ï‚· The website needs to be hosted on the existing domain or a new domain or multiple
domains in the near future for localization purposes. If the domain does not already
follow the following conventions and norms, it should follow them and they include:
ï‚· The website should include a security certificate that not only declares the rightful
ownership of the company but also ensures that the website is encrypted. This means
that the end-to-end communication going through and forth from the user to the
website are encrypted.
ï‚· The website with ICANN domain registrar and that the domain should be legally
owned by the company.
ï‚· The website should also ensure that the Sarbanes-Oxley Act for security guidelines
for securing the website have been followed.
ï‚· The proposed new website should also follow the ISO 17799 as well as 27001
security standards for the website.
ï‚· The website should be protected against DDoS or Distributed Denial of Service based
attacks so that the uptime of website can be maximized and that the website should
not feature any unnecessary downtimes.
Document Page
Website Re-construction Project
ï‚· The website should protect confidentiality and integrity of its users and their sensitive
details.
ï‚· The website should have security mechanisms built in such that a hacker cannot
breach the database of the website or exploit any loopholes and vulnerabilities on the
website such as XSS and Cross-site vulnerabilities.
Other requirements
 The website will feature a real-time ‘search as you type’ feature that will search for all
contents on the page. The search functionality should also be present for partially
matched results and results should also be displayed for content matching using fuzzy
logic.
ï‚· Any user account should be password protected and password reminders and reset
should be handled by the website itself. This excludes administrative accounts.
ï‚· Non-registered and logged-in users have read-only access to the website. Even after
logging-in the access to edit the website is limited to only those regions which are
exclusively permitted by the administrators of the account.
Non-Functional requirements
ï‚· The backward and forward buttons of the website will be compatible with all modern
web-browsers.
ï‚· The web-page should be able to load under 7 seconds completely.
ï‚· The web-pages from tier-2 onwards should display a bread-crumb and that it should
allow people to know on what level they are on the website.
ï‚· The website should have consistent color scheme with respect to the brand of the
company.
ï‚· Font style, family and typeset should be consistent throughout the website.
ï‚· Headings, sub-headings, hyperlinks to external and internal pages should be clearly
demarcated.
ï‚· The images, graphics and any other non-textual content used on the pages would be
optimized wherever possible. This allows for reduction of the size of the page and
thus speeds up the loading time of the website.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Website Re-construction Project
ï‚· A common masthead would be present on all of the pages. This will help in
streamlining and structuring of the content also assist in keeping the consistency of
the design.
ï‚· The website layout would be consistent across all the pages on the site. This ensures
that the user has minimum memory load and does not feel non-standard irrespective
of how deep the user is in the website.
ï‚· The website redesign should ensure the website make use of acceptable font family on
the webpages and does not make use of non-standard or uncommon fonts which is not
only unfamiliar but also has rendering issues on the devices.
ï‚· The website should be able to be rendered appropriately on all devices irrespective of
their screen size and resolution. At the same time, the website should adapt itself to
the orientation the user is visiting the website.
ï‚· The website should have good contrast between elements as well as make use of
information hierarchy and good typography principles. This ensures that important
information are appropriately highlighted and that user does not have to go into too
much trouble to understand the contents.
ï‚· The website should make use of empty space as much as possible to keep the contents
organized and clutter free. At the same time, similar items should be grouped under
headings, sub-categories or respective blocks on the website. This further ensures that
there is appropriate content organization and simplicity throughout the website.
ï‚· Dynamic and fast moving or changing contents should be minimal on the website so
as to ensure people with certain visual deformity or disability will not be affected by
visiting the website.
ï‚· Furthermore, the website should also accommodate for people with visual disabilities
by ensuring the website can be navigated using keyboard, that the fonts are legible
and image captions and alt-text has been provided.
 The website should accommodate Nielsen’s design principles for enhanced usability
of the website and these includes minimal load on user memory, consistency, match
between system and real world, allowing users to recover from errors and so on.
Document Page
Website Re-construction Project
ï‚· The user interface of the website should be responsive and adaptive such that it
changes as per the device of the customer. A customer accessing the website from a
touch-based handheld device should be easily able to use the website. This means that
the website should also be optimized for touch-based inputs.
Project Management Plan (PMP)
Project Charter
Project Name: Website Re-construction
Project
Project Manager: Name of the Project
Manager
Background/Rationale: The project is the re-construction of the website
http://www.instituteofknowledge.com.au/about and the sponsor of the website is Dr Syed
Ahmed. The changes in the website include the modification of the website logo along
with the changes in the home page of the site. The re-construction of the website will be
done in order to gain enhanced customer attraction and user experience levels.
Objectives:
ï‚· To make sure that the re-
construction of the website is done
as per the responsive web design
methodology.
ï‚· To develop the code of the website
such that the website is flexible and
scalable in nature.
ï‚· To make sure that the project
complies with the ethical, legal, and
quality compliance standards at all
times.
ï‚· To ensure that there are no gaps in
actual and estimated cost and
schedule levels.
Success Criteria:
ï‚· Defect Rate: The defect rate on the
website shall be low and at the time
of website deployment, there shall
be no defects in the open state
(Hairul Nizam Md Nasir et al.,
2015).
ï‚· Schedule & Cost Variance: These
values must be zero/positive.
ï‚· ROI: The returns gained by the
organization shall increase with the
re-construction and re-development
of the site.
ï‚· Site visits: The number of website
visits shall increase after the re-
design and re-development of the
website.
ï‚· Customer satisfaction score: The
score shall be 9 or more on a scale of
Document Page
Website Re-construction Project
10.
Deliverables:
ï‚· PMP: The document shall have the
plan on management of the website
(Muneratto, 2017).
ï‚· Website UI aspects: The UI aspects
of the website shall be shared with
the client so that the understanding
on the website design features is
obtained.
ï‚· Software Requirements
Specification: The document shall
include the detailed description of
all the categories of website
requirements.
ï‚· Source code: The code shall be
submitted to the sponsors.
ï‚· UAT test results: The UAT will be
conducted by the end-users and its
results shall be submitted to the
sponsors.
ï‚· Closure Report: The final report
shall be submitted to the
stakeholders.
Exclusions:
ï‚· Marketing and advertising activities
on the re-construction of the website
ï‚· Negotiations with the vendor groups
(Nturibi and Wainaina, 2014)
Benefits Expected:
ï‚· Customer Satisfaction Score: 9 or
above on a scale of 10
ï‚· Return on Investment: Up by 30%
ï‚· Site Visits: Increase by up to 35%
than the current number
Inter Dependencies/Interfaces
ï‚· User Interface: The front-end of the
website shall be developed using
PHP language and it will be the
interface that the users will use to
interact with the site.
ï‚· Security Interface: It will be the
security controls and tools that will
be integrated so that the website
information remains protected from
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Website Re-construction Project
all sorts of security risks and attacks.
Assumptions:
ï‚· The website funds will be provided
by the sponsor.
ï‚· The resource availability will not be
an issue and the effort estimated will
be achieved in the project (Price,
2011).
Constraints:
ï‚· The members of the project team
will not have the access to the
production data. The dummy data
will be used to determine the test
results.
ï‚· Project schedule and costs
Timeframe:
180 days
Cost Estimates:
$50,000
Dated Approval/Sign-Off: Comments and
sign-off status as approved or rejected or
approved with comments
Project Manager Sign-Off/Date: Name &
Signature of the Project Manager, Date
Work Breakdown Structure (WBS)
Project Schedule
The project schedule that is determined is 180 days with start date of the project as 9th May
2019 and the end date being 15th January 2020.
Website Re-
construction
Project
Project Initiation
& Analysis
Meeting with
Project Client
Series of
Interviews
Review Current
Website
Observe Business
Operations
Analyze the data
collected through
observations and
interviews
Identify the gaps
Prepare a Report
Milestone 1:
Initial
Investigation
Report
Project Planning
Project Scope,
Schedule, Costs,
Resources
Project Quality &
Risks
Project
Communication
Milestone 2:
Project
Management
Plan
Design &
Development
Designing of the
website
Project Viva
Database Set-up
Development of
the website
Unit Testing
Milestone 3:
Source Code
Implementation
& Testing
Information
System Testing
User Acceptance
Testing (UAT)
Reviews and
Audits
Change
Management
Milestone 4:
Implementation
Report
Closure
Performance
Management
System
Documentation
Milestone 5:
Closure Report
Document Page
Website Re-construction Project
The total project activities will be carried out in a series of five phases. The first phase will be
the initiation and analysis of the project tasks and activities. It will run for 22 days and the
first activity will be the meeting with the project client. An initial investigation report will be
submitted at the end of this phase of the project. The second phase will be the planning phase
of the project which will be carried out for 16 days and all of the project plans will be
prepared in this phase with the submission of a project management plan at the end of this
phase. The third phase in the project will be the design and development phase which will run
for 86 days and provide the source code of the re-constructed website at the end of this phase.
The implementation and testing phase will be conducted next which will run for 39 days and
it will provide implementation report as an outcome. The closure report will be submitted as
the final deliverable and the closure phase will continue for 17 days.
Risk Management Plan
Project Manager
Name: Name of the Project Manager
Project
Description: The task is the re-construction of the website http://www.instituteofknowledge.com.au/about and the sponsor of the website is Dr Syed Ahmed. The
adjustments in the website incorporate the alteration of the website logo alongside the adjustments in the home page of the webpage. The re-construction of
the website will be done so as to increase upgraded client fascination and user experience levels. This will result in the upgrade of the revenues and profits
earned by the website.
ID
Curre
nt
Status
Risk
Category
Risk
Description
Risk
Impact
Probability of
Occurrence
Risk
Rating
Risk
Response
Strategy
Response
Strategy Assigned To
1 Open Technical There may be a few
technical defects that may
come up in the project in
terms of the technical
faults and failures with the
networking tools or
development tools, and
likewise
Moderate Moderate Moderate Transfer The technical
tools will be
provided by
the different
vendor groups
and they will
be assigned
with the task
of fixing the
issue or
providing the
alternate
tools.
The
assignment
of the risk is
done to the
Technical
Head of the
project to
make sure
that there are
no technical
risks and
errors.
2 Open Security There may be different
forms of information
security risks and attacks
High Moderate High Mitigation
and
Avoidance
There shall be
use of
technical
The
assignment
of the risk is
Document Page
Website Re-construction Project
that may occur on the
website during the re-
construction process in
terms of the malware
attacks or data breaches
(Thamhain, 2013).
security
controls, such
as access
control, multi-
fold
authentication
, and anti-
malware tools
done to avoid
and mitigate
the risks.
done to the
Security
Analyst of
the project to
make sure
that there are
no security
risks and
attacks.
3 Open Ethics The project resources may
not comply with the ethical
and professional codes of
conduct giving rise to the
issues of ethical non-
compliance.
High Low High Avoidance The resources
of the project
team shall be
provided with
the ethical
trainings and
there shall be
execution of
reviews done
by the Project
Manager to
avoid the
risks.
The
assignment
of the risk is
done to the
Project
Manager of
the project to
make sure
that there are
no ethical
risks and
issues.
4 Open Quality The project resources may
not comply with the quality
standards and codes giving
rise to the issues of quality
non-compliance
(Kalkbrenner, 2010).
High Low High Avoidance The resources
of the project
team shall be
provided with
the trainings
and there shall
be execution
of reviews
done by the
Quality
Manager to
avoid the
risks.
The
assignment
of the risk is
done to the
Quality
Manager of
the project to
make sure
that there are
no quality
risks and
issues.
5 Open Legal The project resources may
not comply with the legal
codes and policies giving
rise to the issues of ethical
non-compliance.
High Low High Avoidance The resources
of the project
team shall be
provided with
the legal
trainings and
there shall be
execution of
reviews done
by the Project
Manager to
The
assignment
of the risk is
done to the
Project
Manager of
the project to
make sure
that there are
no legal risks
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Website Re-construction Project
avoid the
risks.
and issues.
6 Open Project There may be issues of
schedule and cost overrun
that may occur (Tennant,
2010)
High Moderate High Avoidance The
verification
and analysis
of the values
of cost
variance and
schedule
variance shall
be done
regularly. The
use of Earned
Value
Analysis
technique
shall be done.
The
assignment
of the risk is
done to the
Project
Manager of
the project to
make sure
that there are
no project
risks and
issues.
Use case diagram
Document Page
Website Re-construction Project
Conclusion
The project includes the re-construction of the website and there will be numerous steps and
activities involved in the project. There must be adequate planning and analysis involved in
the project to make sure that the project goals and aims are achieved. It shall also be ensured
that a project management plan is developed in the initial project phases to execute the
project as per the defined guidelines.
Document Page
Website Re-construction Project
References
Hairul Nizam Md Nasir, M., Sahibuddin, S., Ahmad, R. and Sanim Mohd Fauzi, S. (2015).
How the PMBOK Addresses Critical Success Factors for Software Projects: A Multi-round
Delphi Study. Journal of Software, 10(11), pp.1283-1300.
Kalkbrenner, A. (2010). Long-Term Liability Issues for CCS-CDM Projects in the Post-
Crediting Period. Journal of Energy & Natural Resources Law, 28(4), pp.535-559.
Muneratto, G. (2017). Projects of organised communication. Journal of Communication
Management, 11(1), pp.84-89.
Nturibi, D. and Wainaina, M. (2014). Planning and Management of Community Projects: A
Manual on Programme Development, Leadership Training and Management of Group
Projects. Studies in Family Planning, 15(6), p.303.
Price, A. (2011). Access arrangements for resources projects: anticipating the issues. The
APPEA Journal, 51(2), p.690.
Tennant, D. (2010). The communication of risks and the risks of communication. Risk
Decision and Policy, 2(2), pp.147-153.
Thamhain, H. (2013). Managing Risks in Complex Projects. Project Management Journal,
44(2), pp.20-35.
chevron_up_icon