This assignment focuses on identifying and addressing the main obstacles encountered during the completion phase of the Sydney Seafood Bar project. These obstacles include technical changes, last-minute scheduling adjustments, and various sources of uncertainty. The project, estimated at around a million dollars, involves a complete kitchen removal, floor plan reconfiguration, and new kitchen construction with structural and operational improvements. The project manager's responsibilities encompass estimating surveyor quantities, managing equipment storage and packing, and evaluating consulting costs, architect's design, and management fees. Capital budget modeling and financial project modeling are essential for implementing amenity maintenance, disabled access, kitchen equipment upgrades, and kitchen regulatory changes. The project schedule should be prepared considering different technical changes and public expectations to ensure successful execution within the estimated timeline and budget. Desklib offers a range of study tools and solved assignments to aid students in understanding project management principles and practices.
Document Page
Running head: PROJECT MANAGEMENT
Project Management: Sydney Seafood Bar
Name of the student:
Name of the University:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT MANAGEMENT
Question 1)
Main obstacles which is clustered around Sydney seafood bar project completion phase includes:
a) Technical changes b) Last-minute scheduling
c) Some source of uncertainty d) All of the Above
Answer: d) All of the Above
After analyzing the detail requirements and scope of Sydney Seafood restaurant kitchen
renovation project it has been determined that, cluster of obstacles are there which may interrupt
the success and pathway. It is responsibility of the project manager to identify these obstacles
and resolve each of these respectively. The foremost factor that influences the changes was based
on public demand and their expectations. The net cost estimated for this specific project is
around Million dollars. For complete removal of the kitchen, floor plan configuration, new
kitchen construction structural and operational improvement is very crucial. Technical changes,
last minute scheduling, uncertainty of some of the sources are referred to as the main obstacles.
Initially, the surveyor’s quantity requires to be estimated while constructing the project.
Apart from this, equipment storing and packing are the other activities required to be
conducted by the project manager. Consulting cost, architect’s design and management fees are
required to be estimated by the project managers to evaluate and execute the kitchen renovation
project within estimated timeline and budget. Capital budget modeling and financial project
modeling are the different modeling approaches must be used for implementing amenity
Document Page
2PROJECT MANAGEMENT
maintenance, disabled access, kitchen equipment expectations and kitchen regulatory changes.
At the project initiation phase, project schedule should be prepared considering different
technical changes.
Document Page
3PROJECT MANAGEMENT
References
Binder, J., 2016. Global project management: communication, collaboration and management
across borders. Routledge.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.