Facility Risk management
Name:
Course
Professor’s name
University name
City, State
Date of submission
Facility Risk management PDF_1
2
Part 1: Case History
Brief case history of your chosen hospitality venue
The chosen hospitality venue is the Yard hotel concert venue for performances and line events.
The venue condition analysis will look at the 10000 seat capacity hall build for concerts by the
Yard hotel. Its located in Melbourne town but at the outskirts of the central business district
therefore there is free flow of people in and out of the hall. The size of the venue is nearly 2 ha,
with a hall sitter capacity of 200 people which is the full capacity. The hall or stadium purpose is
to hold large delegations, hold concerts that require a minimum attendance, hold social events
such as fundraisers and weddings and many more (Akgün, İ., Gümüşbuğa, F. and Tansel, B.,
2015).
The site was built in the year 2005, after the hotel realized that there is enough market for
performances and live concerts that will also attract the people to the hotel business. The
refurbishments have been done in successive years to improve on the quality space and the safety
condition of the venue especially during emergency evacuation in entry and exit of the people.
The current operating and maintenance schedule is done in the day to day operations of the
venue. After an event has been conducted, the event condition is also assessed for operational
efficiency. The hall has all the hospitality facilities such as a bar, kitchen, equipment and other
structures inside the concert hall. A restaurant is also in the works to being opened.
Part 2: Venue Condition Assessment form, using the Microsoft Excel spreadsheet
provided.
Facility Risk management PDF_2
3
For the hospitality venue condition assessment form, the items include the service bar, the
kitchen, the equipment, and the structure of the venue includes; conditioning index, life
expectancy and age.
In general, the quality of each erected building and structure is laid during design, it is ensured in
the manufacture of building materials and in the process of construction and installation works,
and is implemented in the course of their operation.
It is known that, first of all, the quality level of contracting projects is set at the design stage.
Usually, under the quality of the project, the progressiveness of the design decisions and the
construction materials laid during the design, which meet the modern design requirements and
the required technical characteristics of the designed units of the designed buildings and
structures, are made. The attributes that determine the quality of the project are divided into
functional, constructive, economic and aesthetic.
Venue design
Functional features provide for ensuring the flow of the process, excluding any environmental
pollution. Design features include the reliability of work, as individual nodes, and the object as a
whole. Reliability is understood to mean the invariance of the bearing capacity, the stability of
the appearance structures, the trouble-free operation of individual components and equipment
during their planned service life.
Economic signs provide high-quality products with the lowest material costs. Aesthetic features
are determined by the socio - economic level of society, its ideological and cultural needs. These
Facility Risk management PDF_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Assignment on Facility and Risk Management for Hospitality
|7
|515
|34

Venue Condition Assessment for St Vincent’s Hospital in Sydney Australia
|7
|1509
|163

(Doc) Conference and banqueting management : Assignment
|10
|3012
|93

Conference Event Management
|14
|903
|44

Statutory Safety Requirements in Structural Designs: Regulatory Safety Requirements for Buildings
|44
|3271
|329

Importance of Event in Sickkids Hospital Fundraise
|9
|1876
|258