(PDF) Assessment of the Ability of HND

   

Added on  2021-04-21

23 Pages11672 Words31 Views
 | 
 | 
 | 
Running head: HND ASSIGNMENTUnit 17: Project Management for Construction and the Built EnvironmentStudent Name:University Name:Lecturer: Fandy Cheung / Dr. Peter Kwan
(PDF) Assessment of the Ability of HND_1

HND ASSIGNMENT1Table of ContentsTask 1....................................................................................................................................................2Task 1.1 – Project management practices.............................................................................................2Task 1.2 – Role of project managers....................................................................................................4Task 2....................................................................................................................................................5Task 2.1 - Key characteristics and qualities of the effective project managers....................................5Task 2.2 – Types of education, training and occupational standards...................................................6Task 3....................................................................................................................................................7Task 3.1 – Duties and responsibilities of project managers.................................................................8Task 3.2 – Contractual implications of using external consultants or internal teams..........................9Task 3.3 – Relationship between project managers with design and construction teams..................10Task 4..................................................................................................................................................11Task 4.1 – Role of client in the construction process.........................................................................11Task 4.2 – Advantages to clients of using project management.........................................................13Task 4.3 – Evaluating improvement of quality and standards............................................................14Task 5..................................................................................................................................................15Task 5.1 – Evaluating changes to priorities and list of priorities.......................................................15Task 5.2 – Explanation on the use of best practices in project management.....................................16Task 5.3 – Explanation on how project managers can add value to the construction process...........17References...........................................................................................................................................19
(PDF) Assessment of the Ability of HND_2

HND ASSIGNMENT2Task 1Task 1.1 – Project management practicesThis project depicts commercial development of a construction project in Hong Kong, 11-29Davis Street. The site location and bored piles are also proposed accordingly. Certain projectmanagement practices are to be considered in the construction and build environment, in reaction totime, cost, quality and many others. Moreover, it can be said that with the help of projectmanagement best practices the project manager can successfully meet the construction requirementswithin estimated time, budget and quality. This particular section highlights the key elements and allassociate best practices those are necessary for managing multiple construction projects. Theconstruction project’s best practices for both the preliminary and implementation stages areelaborated in this section. The leading constriction project practices are as follows:Development of project charter: This is the initial phase that must be followed by the projectmanager as it identifies the requirement of the project. Additionally, the construction project chartershould also provide the following project information:Assigning project manager and also their authority levelCreation of standard construction level guidelines, work instruction, evaluationcriteria of the proposal and also the performance measurement criteriaIdentification of project selection method (Kerzner and Kerzner 2017) Identification of project management methodologiesDefining project scope Procedures for record retention Communication plan with the stakeholders Risk control planIdentification or procedures for issuing and approving the work authorization Development of preliminary project scope statement: This process or phase defines theproject in a more elaborated way and also helps to identify those requirements that have to beaccomplished. The characteristics and boundaries of the construction project are also defines fromthe project scope statement (Walker 2015). In addition to this, it also gives the acceptance methodsof the work and scope control. It also contains the following:Objectives of the construction projectService requirement and deliverable of the projectInitially defined risks (Kerzner 2018)The order of the magnitude cost estimateRequirements of approval Implementation of project management plan: This is the process which defines the waythrough which the construction project will be successfully executed, controlled, monitored andclosed. This process contains the following: The process of project management that has been selected by the construction projectmanagement teamIn order to accomplish the project objective how the blueprint will be executedThe methods through which the changes can be controlled and monitoredThe communication technique to be followed among the project stakeholders
(PDF) Assessment of the Ability of HND_3

HND ASSIGNMENT3For addressing the open issues and pending decisions key management review of forthe content, extent (Castillo, Alarcon and Pellicer 2018)Detail elaboration of risk register to identify and monitor risksBest practices detailing the contracts for the construction services, it clearly definesthe standard of performance and all measurable outcomesIdentification of vendor practices Identification of the responsibility of the project staffsDirecting and managing project execution: The construction project manager is responsibleto play multiple roles to accomplish the activities defined in objectives and project cope statement.The best practices of this process are as follows:Staff training and managing project teamObtaining quotes, bids and project proposalManaging the usage of project resources (Sears et al. 2015)Development of risk management plan in terms of risk responsive activitiesAdoption of all approved changes into the project scope and planConduct the procurement and negotiate contractsProvision for ensuring the rented equipmentMonitoring and controlling project works: In this process the best construction practicesthose are followed, mentioned below:Comparison between actual project performances with the project planFor identifying corrective and preventative actions, performance should be accessed Maintaining proper and timely information and documentation (Golini,Kalchschmidt and Landoni 2015)Retain the document supporting charges against the construction project contractAfter completion of contact the performance of the contractors are evaluated by theagencies considering, preliminarily established standard criteriaIntegrated change control: In order to accommodate crucial changes to the project, theintegrated change control process should be performed. The necessary changes that are to beincorporated are as follows:Managing factors that, avoid the integrated changes order to ensure only approvedchanges are implementing in the construction projectReview and approval of all requested changesReview and approve all corrective recommended action (Kaiser, El Arbi andAhlemann 2015) Control and update scope, budget and schedule of the project Documentation of the impact on the requested changes Project closure: This is the final process and the leading practices of this process are asfollows:Finalizing that all activities are completed successfullyProcedure to verify and document the project deliverable Final investigation and documentation Stakeholder signoff
(PDF) Assessment of the Ability of HND_4

HND ASSIGNMENT4Final contract closure Task 1.2 – Role of project managersThe effective ability of finding, analysis and delimit the appropriate structure and attributesof the subsystems, physical systems and components posed on various levels and also in diversehierarchy are crucial for the project managers. In order to accomplish the project it is necessary forthe project manager and the members of the project team to keep themselves engage to their Jobroles. The recent demands on higher level of living and superior technological development havemeant that, the large construction projects are eventually increasing in both their complexity andsize. This section evaluated the role of a project manager of a construction project. The roles of theconstruction project manager re as follows: The main role of a construction project manager is to work closely along with thefinance department, engineers, architect, and surveyors to make sure that the project iscompleted in a safe manner and also meeting the client’s requirement as well asexpectation. The construction manager shall administer the entire contract (Hand et al. 2015)The project managers are also responsible to bid on the contract and based upon thebidding result the contractors will be selected for the construction project The construction manager should prepare the work forms that can be used for thecorresponding application like payment, application to inspect the work etc. Even thecontractor should also use this kind of form in his association with the constructionproject managerThe construction manager should never withdraw, alter, enlarge or release thecontractors or subcontractors of any of the project requirement of the contract documentsor even never accept any unperformed works. Construction managers have the power to reject works that are not conforming to thecontract document however; they are not allowed to work under the contract provision.They are responsible to make proper constriction decision and also about theresponsibility of each of the project team members such as suppliers, employees,contractors, subcontractors etc (Alias et al. 2014). Another role of the construction project manager is to receive detail blueprint of theconstruction, all data about the products, raw materials and samples. They are alsoresponsible to coordinate those data with the details information collected from thecontractors and finally they will transmit those to the consultant to get the reviewresultant. After getting the review result from the consultant the documents are again delivered tothe project manager to make sure that the detail design is accepted.The construction project manager is responsible to review and certify the paymentdetails before making any payment to the contractors, sub-contractors or any other. The engineering consultancy agreements signed between the consultant and owners arealso approved by the project managers after successful engineering supervision. They arealso responsible to ensure that, the construction is running within the estimated budgetand time as well.In addition to this the performance of all the project staffs are also required to beanalyzed and measured by the construction project manager. The entire contractdocument should be prepared considering the client’s and supplier’s perspectives.
(PDF) Assessment of the Ability of HND_5

HND ASSIGNMENT5This is the responsibility of the construction project manager to consider the safetyprecaution and other protection measures. The managers are also responsible to makefinancial forecast, monitoring and controlling project cost and cost reporting. Differentelements are needed to be controlled to ensure that the project is running under theestimated cost and time, those are also analyzed by the construction project managers.During the project ongoing phase if any changes are implemented then, the projectmanagers have to prepare the change order as a written instrument (Serpell et al. 2015).Within the context of the contract the managers start their agreement through introducingthe changes. Besides this, they should monitor site safety by ensuring the requirementsof various occupational health and safety act. The construction change directives are prepared by the construction project managers.This kind of changes took place in the works or activities. Before making any suchchanges the proposed blueprint should be analyzed once again. If in the contact price, ay changes are needed then that is analyzed by the constructionproject managers. In order to make this happen, they should study the effects based uponthe change nature, insurance time and critical path of the activities. Apart from all these the project manager are also responsible to control and monitor theconstruction project progress details appropriately by preparing and expedite the projectdeficiency lists. They also ensure that the required municipal inspections are performedaccurately. In addition to this, the project managers should prepare summary of themonthly forecast of the cost details.Task 2Task 2.1 - Key characteristics and qualities of the effective project managersConstruction projects consist assortment of individual and organizations those are allcollected to reach the specific task within a specific time phase. Thus, leadership is referred to asimportant nature of the construction manager for managing the construction projects. This particularskill can eventually improve the productivity of the construction projects, where the outcome of theproject includes effectiveness, satisfaction and all extra efforts. This section defines thecharacteristics and quality of the project managers (Parmenter 2015). The ability of the projectmanagers leads a construction project towards success. The characteristics of the constructionproject managers are as follows:Great communication skill: Communication skill is referred to as one of the important skillsthat any project manager is required to possess to make any construction project successful. Theproject manager should follow open communication approach while communicating with theconstruction stakeholders. Development project managers ought to comprehend and apply powerfulcorrespondence all through the task running stage. Without legitimate correspondence, proficientspecialists will be not able serve best of their capacity for the development. Because ofinappropriate correspondence approach, the whole advance consequence of the project willwrecked. A professional and experienced project manager must be able to transcribe intricateproject details in small activities to reduce the total workload from the project team members(Spundak 2014). In order to complete all the project activities clear communication approach is verymuch important to be applied. Project managers need to delegate tasks: A construction project cannot be successfullycompleted as a single person event. Not only this but also, if a single person contributes cent percent
(PDF) Assessment of the Ability of HND_6

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Report on Project Cycle Management
|22
|4871
|44

Audit Report: Construction Project
|10
|3015
|417

(Solution) Project Management - PDF
|26
|4630
|361

Project management for business INTRODUCTION 1 TASK 11 1.1. Project management for business
|16
|4628
|56

Project Charter: Business Case
|18
|2457
|75

Project Planning for Teesside PLC Company
|42
|4712
|48