MODERN CONSTRUCTION PROJECTS
By Name
Course
Instructor
Institution
Location
Date
MODERN CONSTRUCTION PROJECTS DISCUSSION 2022_1
2
ANNOTATED BIBLIOGRAPHY: HIGH LINE BUILDING
Introduction
An enclosed relative construction established on a land. It’s used for wide various activities such
as entertaining, commercial purposes and for living. Manufacturing.
High Line is a building that is situated or located about two kilometers along the linear park of
the greenway across the former New York railroad in Manhattan. The building was constructed
on a disserted overpass section in New York Central Railroad line.
The design of the building was brought about by the cooperation between the following
architects: James Corner Field Operations, Diller Scofidio + Renfro, and Oudolf. The designers
and the architects of the high line focused their inspirations in the reuse and recycling of
resources by building the high line on a disserted section of land and as well enhancing creation
something a new out of nothing.
The high line building enhances environmental sustainability through the resource efficiency and
reuse throughout the building life cycle from the sitting design to maintenance and operational
affectivity.
High line building ensures cost affectivity while enhancing productivity. This is facilitated by the
reuse of resources from design planning, construction of the building to operational
maintenances.
Achieving smarter, better and cheaper
For a building to be smarter, better and cheaper they should use modern information technology
during their operations to connect different systems, which generally operates independently, the
connection ensures that the systems can share information to optimize the overall building
MODERN CONSTRUCTION PROJECTS DISCUSSION 2022_2
3
performance. The High Line Building had the following features to ensure that it was smarter,
cheaper and better;
Robust wireless infrastructure
Assessing smart building device for retrofit
Choosing future-proof device and technology investments
Pre-construction effectiveness
All the initial stages involved in the building project before the real construction works starts are
referred to as pre-construction activities.
During the primary stages of planning on High Line project, the client closely worked with the
design team and the general contractor. Detailed drawings were developed, schedules were
drawn and manpower and budgets projections were carried out before the construction work
began. At these stages, regular communication took place between the main team and other
consultants.
The team outlined the project, formulated budget estimates that met the real budget, classified
possible construction issues and solutions and finally determined the most effective way to use
money and other resources in the project.
All of the above actions and stages describe pre-construction effectiveness in a building project.
On-site construction effectiveness
On-site construction refers to the activities that are supposed to be finalized on the project. They
include maintenances and management of property. Onsite construction process is a chain of
MODERN CONSTRUCTION PROJECTS DISCUSSION 2022_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Modern Methods of Construction PDF
|7
|1714
|165

Stages of House Construction and Stakeholder Engagement: A Case Study of Taylor Wimpey
|12
|997
|281

NEW BUILDING CONSTRUCTION IN NORTHERN VIRGINIA
|6
|1169
|13

Introduction to Green Technology - Report
|8
|1230
|96

Civil Engineering Technology
|15
|4482
|49

Experienced Project Engineer with Expertise in Construction Management and EPCM
|6
|734
|495