This assessment guide provides information on BSBPMG513 Manage Project Quality, including the purpose of assessment, competencies being assessed, assessment tasks, adjustment and support, assessment submission, assessment results and feedback, and technical tools for completing the assessment.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Copyright 2020 No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise without the prior written permission of Australian College of Business Intelligence. Disclaimer: The Australian College of Business Intelligence does not invite reliance upon, nor accept responsibility for, the information it provides. The Australian College of Business Intelligence makes every effort to provide a high-quality service. However, neither the Australian College of Business Intelligence, nor the providers of data, gives any guarantees, undertakings or warranties concerning the accuracy, completeness or up-to-date nature of the information provided. Users should confirm information from another source if it is of sufficient importance for them to do so.
Contents 1. Assessment Information......................................................................................................5 A. Purpose of assessment........................................................................................................................5 B. Competencies being assessed.............................................................................................................5 C. What you are required to do...............................................................................................................6 Assessment Task 1 ‒ Questioning..........................................................................................................................6 Assessment Task 2 ‒ Simulated workplace scenario.............................................................................................6 Assessment Task 3 ‒ Project..................................................................................................................................7 D. Adjustment and Support.....................................................................................................................8 E. Assessment submission.......................................................................................................................8 F. Assessment results and feedback........................................................................................................9 G. Technical tools for completing this assessment................................................................................10 2. Assessment Coversheet.....................................................................................................11 3. Assessment Requirements.................................................................................................12 A. Task 1 – Questioning i. Instructions for students.....................................................................................................................12 ii. Questions...........................................................................................................................................12 B. Task 2 – Simulated Workplace Scenario i. Instructions for students.....................................................................................................................16 ii. Scenario.............................................................................................................................................16 iii. Questions..........................................................................................................................................19 C. Task 3 – Project i. Instructions for students.....................................................................................................................22 ii. Questions ...............................................................................................................................................................22 ..............................................................................................................................................................22
1. Assessment Information A. Purpose of assessment This assessment will develop your skills and knowledge skills and knowledge required to anage quality within projects. It involves determining quality requirements, implementing quality control and assurance processes, and using review and evaluation to make quality improvements in current and future projects. The assessment is designed to help you gather evidence of your competence against the requirements of the unit of competency, as outlined below. Your evidence may take a variety of forms and must be: Authentic – your own work Valid – related to the competency Sufficient – appropriate quantity and quality Current – recent proof of your skills and knowledge B. Competencies being assessed Elements To achieve competency in this unit students must demonstrate their ability to: 1.Determine quality requirements 2.Implement quality processes 3.Implement project quality improvements Performance Evidence Evidence of the ability to: Work with others to decide a project's quality requirements Document a quality-management plan Implement quality control and assurance processes for a defined project using a range of tools and methodologies Review outcomes and recommend process improvements Knowledge Evidence To complete the unit requirements safely and effectively, you must:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Explain quality management theory Explain relevant standards that apply in the organisation Describe quality assurance and control techniques, key tools and methodologies Describe roles and responsibilities of quality management personnel Explain methods for managing continuous improvement For further information on the competencies of this unit, please refer to: https://training.gov.au/Training/Details/BSBPMG513 C. What you are required to do This assessment requires you toanswer all questions within each Assessment Task and be assessed as “Satisfactory” in each to gain competency inBSBPMG513 Manage Project Quality. Assessment Task 1 ‒ Questioning You are required to respond to a series of short-answer questions to demonstrate your knowledge across key concepts and variables involved in managing project quality. Assessment Task 2 ‒ Simulated workplace scenario You are required to develop a Quality Management Plan in response to a scenario, using the templates provided. This assessment task requires you to construct and complete a Quality Management Plan for a simulated workplace project. Assessment Task 3 ‒ Project You are required to review the activities you have planned and would conduct to effectively manage project quality. In this Assessment Task you will be required to update key quality management documents and write a Lessons Learned Report. For further details, please refer to the “Assessment Requirements” section of this document. Assessment resources To enable you to complete this assessment, the following documents have been provided in the unit course page on Moodle:BSBPMG513 Manage Project Quality Learner Guide BSBPMG513 Manage Project Quality PowerPoint Slides PMBOK 5thedition, chapter 8 “Project Quality Management”, pages 227 - 254
Sample quality management plan A note on plagiarism and referencing Plagiarism is a form of theft where the work, ideas, inventions etc. of other people are presented as your own. When quoting or paraphrasing from a source such as the Internet, the source must be recognised. If you are quoting a source, make sure to acknowledge this by including “quotation marks” around the relevant words/sentences or ideas. Note the source at the point at which it is included within your assessment, such as by using a citation. Then list the full details of the source in a ‘references’ section at the end of your assessment. All sources used for your assessment should be detailed in the ‘references’ section. It is advisable to never copy another person’s work. D. Adjustment and Support i. Reasonable adjustment ACBI supports individual differences in the learning environment and provides ‘reasonable adjustment’ in training and assessment activities to support every learner. If you have any special needs that make it difficult for you to complete your learning or assessments, you should discuss this with your assessor. ACBI will endeavour to provide you with reasonable alternatives to assist you to complete the required tasks such as completing tests verbally or using an interpreter. NOTE: If you have any special needs, you should discuss this with your assessor before starting your assessment. ii. Support While ACBI may not be able to assist you with language training or specific Language, Literacy and Numeracy (LLN) training, our assessors will work with you to ensure that you are supported throughout your qualification. If you require individual tutoring this may attract an additional fee (please refer to the ACBI Student Handbook available from https://www.acbi.edu.au). Support may be offered by your assessor, or for more specialist support you may need to contact the RTO administration. E. Assessment submission Always submit assessments on time by the due date. You can find the due date in the unit course page on Moodle. i. Assessment Coversheet Once you have completed all the tasks of the assessment, you must complete the Assessment Cover Sheet, including signing the declaration. ii. File naming conventions
When submitting assessments electronically follow the following standard for naming document files and subject line. You must insert the following information: Unit of Competency code (ie. BSBPMG513) ‘A’ for word assessment then followed by the assessment number and a dash Your first name and initial of last name. Capitalise only the first letter of names. Then insert a hashtag, followed by submission attempt. Hence as an example of incorporating the four points above your file name or subject line should appear this way:BSBPMG513A1 – JessieA #1 iii. Submission via Moodle Please refer to the “Instructions for Submitting Your Assessment” on the unit course page in Moodle. NOTE: Please take care to follow all instructions listed. Assessments uploaded with a draft status on Moodle may not be graded. F. Assessment results and feedback i. Assessment results Once you have submitted this assessment online via Moodle, your assessor will grade it and provide you with feedback. For each task of the assessment, you will receive a grade of ‘Satisfactory’ or ‘Not Satisfactory’. You will also receive a grade for the entire assessment of ‘Competent’ or ‘Not Competent’. Each task of the assessment must be ‘Satisfactory’ in order to receive a grade of ‘Competent’. ii. Resubmission If your assessment is graded ‘Not Competent’, you receive instructions via the feedback form on components to be amended. Your assessor is committed to providing you with detailed feedback on the outcomes of the assessment and will provide guidance on areas for improvement. In most instances, you should need only complete the sections of the assessment that were deemed ‘Not Satisfactory’. However, it is important to remember that depending on the task, it may be necessary to repeat the whole task (for example presentations or the delivery of a training session). If resubmission is required, you will need to amend or update your assessment as a different version by the required term cut-off date, as detailed on Moodle. NOTE: For further information on late assessment, please refer to the ‘Assessment Policy’ available on Moodle. iii. What happens if you do not agree with the assessment result If you do not think the assessment process is valid, or disagree with the decision once it is made, or believe that you have been treated unfairly, you can appeal.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
The first step is to discuss the matter with your trainer. If you still do not agree with the assessment, you are able to request a re-assessment. It is possible to have your evidence assessed by a different trainer. If you remain dissatisfied after the re-assessment, you should contact the Director of Studies. Full details of the Appeals process are contained in your Student Handbook. G. Technical tools for completing this assessment To complete this assessment, you need access to: A computer with internet Word processing and other relevant programs to develop appropriate documentation and reports as required
2.AssessmentCoversheet Student Name: Student ID: Contact Number: Email: Trainer / Assessor Name: Qualification: BSB51415 Diploma of Project Management Unit of Competency: BSMPMG513 Manage project quality Assessment Tasks: ☐Task 1. Questioning ☐Task 2. Simulated workplace scenario ☐Task 3. Project Due Date:Date Submitted: Declaration:I have read and understood the following information at the beginning of this assessment guide (please tick): ☐Assessment information ☐Submitting assessments ☐Plagiarism and referencing
I declare this assessment is my own work and where the work is of others, I have fully referenced that material. Name (please print): Student signature: (Print) Date: 3. Assessment Requirements A. Task 1 – Questioning i. Instructions for students Task 1 of this assessment requires you to analyse different models and tools utilised in managing a project’s cost and gain an understanding of the various components needed in developing and implementing a project. Answer the questions below using the space provided: Answer all parts of each question Use your own words and give examples wherever possible The quality of your answer is more important than how long it is Enter your answers in this document You may use various sources of information to inform your answers, including your resources provided by ACBI, books, and online sources. You must acknowledge and cite your sources. ii. Questions 1A. Explain the term ‘quality management’. Answer in 180-200 words. Quality management is considered as an important act that used in overseeing each and every
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
activity that includes in the project. It helps in maintaining a desirable level of excellence within quality management framework. Mainly, it includes various activities like quality policy, implementing quality planning and assurance, proper quality improvement and many more. In addition to this, quality management is highly focus over the long term goals with the help of implementing short term initiatives. As, it also required that all the stakeholder within the project perform their activities together with the aim of improving the processes, services, products and overall culture of business organisation. The overall process of quality management includes collection of guidelines that basically used by team to evaluate. It also ensures that the service quality of produced products is including right standards. With the help of this, company can easily attain their set targets and at the same time also accomplish larger profitability level by providing quality services to its customers as per their requirements. Apart from this, the main focus of quality management is to meet customers’ requirements and also strive to exceed the customers’ expectations that contributes in improving overall level of success related to business organisation. 1B. Describe what quality standards are. Then describe quality standards’ place in the project lifecycle. Answer in 80-120 words. Quality standard is playing a significant role of project management as it is referring to the document that provide overall requirements, guidelines, characteristics and specification that further used by the project manager to ensure that all the necessary materials, processes and services are fit in the process of attaining organisational objectives. One of the main purpose of quality standard is to provide better understanding, shared vision, procedures that contributes in meeting all the relevant expectations of project stakeholders. Proper implementation of quality standards in project further assist in satisfying requirements of customers towards providence of quality services. In addition to this, the project life-cycle includes different phases such as initiation, planning, execution and closure of the project activities. There are some quality standards such as ISO 9000- Quality management, SA 8000, OHSAS 18000 that help to perform work more appropriately. All these are contributing in making overall project more effective. Yang, Y., and et.al, 2019. Factors affecting structural steelwork adoption from a project lifecycle perspective: The case of Hong Kong.Journal of Cleaner Production,230, pp.634- 646. 1C.Explain the difference between quality assurance and quality control.
Then briefly explain tools, techniques, or methods associated with quality assurance and quality control. Answer in 200-400 words. Quality AssuranceQuality control Qualityassuranceisreferringtothesetof activities that used for ensuring quality within theprocesswhichultimatelycontributesin development of quality product. Quality control is referring to the set of activities that help in managing quality of the products. It also determines the defects within the actual products. The main aim of quality assurance is to prevent defects in order to make the products more effective.Alongwiththis,itisaproactive process of quality management. Qualitycontrolishavingaimrelatedto determiningdefectswithinthefinished products. Mainly, it is reactive process that used to manage the product quality. Quality assurance is process oriented.Quality control is product oriented. The main goal of quality assurance is to develop as well as test the process so that company can easily eliminate the possibility of arising any kind ofdefectswithintheactivityofproducts development. Other side, the goal of quality control is to identifythedefectsafteritsproduction.It ultimately aid in improving the quality of final product. Quality assurance has focus on establishing a goodqualitymanagementsystem.Italso includesperiodicconformanceauditsofthe entire operations system. Qualitycontrolhelpinfindingaswellas eliminating sources of quality problems by using toolsandequipment’s.Itcontributesin providingcustomerssatisfactionbymeeting their requirements. Themainexampleofqualityassuranceis verification. Verification and software testing is an effective example of quality control. There are different tools, techniques and methods of quality assurance and quality control: Tools of quality control:There are some tools for quality control such as Cause-and-effect diagrams, flowcharting, check sheets, Pareto diagrams, control charts, histograms and scatter diagrams, Benchmarking, Design of Experiments and statistical sampling. All these are effective for controlling the qualityof the developed products by evaluating existing level of defects. Tools and techniques of the quality assurance:Affinity Diagrams, Process Decision Program Chart (PDPC), Interrelationship Diagraphs, Tree Diagram, Prioritisation Matrices, Activity Network Diagrams, Matrix Diagrams, Quality audit, Process analysis and many more are the tools and techniques of the quality assurance.These are effective in managing the quality of products and further eliminates the possibility of arising errors. This will directly contribute in meeting customer’s expectation on continuous basis. The main purpose of using these quality tool is to monitor or manage quality initiatives. This
will support in determining the actual improvement and defects at the time of product development. By this, firm can easily serve their quality products to its customers in order to meet their needs and wants. Beger, R.D., 2019. Interest is high in improving quality control for clinical metabolomics: Settingthepathforwardforcommunityharmonizationofqualitycontrol standards.Metabolomics,15(1), p.1. 1D.Explain three (3) methods that could be used to manage continuous improvement activities. Answer in 250-300 words. It is important for business organisation to manage continuous improvement within their product activities as it help in maintaining the quality of products. This can be beneficial for company in meeting customers’ requirements and make them loyal towards the company along with their offerings. In this context, some effective methods that can be used to manage continuous improvement within different determinants includes; DMAIC and PDSA: Under the project activities, DMAIC is refer as define, measures, analysis, improve and control. Along with this, PDSA is refer to Plan, do, study and adjust. These are the important variations which focus on continuous improvement activities. In this, each variation is developed or designed for ensuring the structure and effective change management. This will contribute in improving product quality. With the help of this, company can easily measure the overallimpact of improvement within the business organisation. Rapid Improvement (or Kaizen) events:It is also considering as an important method that will be used by business organisations in continuous improvement activities because it helps to improve daily nature functions. The main focus of this method is to manage all the challenges that arise at the time of producing products. Along with this, at the time of rapid improvement within the company, a small team is created in order to improve the targets processes. Mainly, this type of team includes executive sponsor, a facilitator, subject matter experts and other employees who are connected at the time of executing the task activities within the business organisation. Kanban: For continuous improvement, it is one of the important method that will be used by improvement team in order to visualise all the work flows and at the same time this also help in correcting necessary interruptions before it grows too big. This will assist in resolving the issues that arise at the time of continuous improvement exercise. Kerzner, H., 2019.Using the project management maturity model: strategic planning for project management. John Wiley & Sons.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1E. Outlinethe roles and responsibilities of quality management personnel for all phases of project lifecycle. Answer in 120-180 words. PersonnelResponsibility Project managerThe main role of project manager is to manage the production of required deliverables. It also includes proper planning and monitoring of project activities. Designing and applying appropriate project management standards. Managing project risks and developing a contingency plan. Authorising agent/ agency Authority agent allow project manager to exchange and disclose information with people and also deals with them. They have rights to change the policies within the project activities. Project sponsor Project sponsor is the one who do not manage day to day operational activities of the project. As they ensure that all the resources are in right place, promote the project, and also hold the overall responsibilities for attaining success in the project. Project team member/s Individual who perform day to day activities for completing entire task is including in the project team. They also contribute in exercise of attaining overall project activities in an effective manner. StakeholdersStakeholders are the one who can positively and negatively influence the project. They include customers, team members, external sellers, manager and business organisation. All these stakeholders play crucial role because they provide an appropriate framework to take right decision within the project activities. Meredith, J.R.,and et.al, 2020.Project management in practice. John Wiley & Sons.
B. Task 2 – Simulated Workplace Scenario i. Instructions for students Task 2 of this assessment requires you to analyse different models and tools that were utilised in managing a project’s cost to gain an understanding of the various components which needed to develop and implement project Read the scenario provided below. Then answer the following questions using the space provided: Answer all parts of each question Use your own words and give examples wherever possible The quality of your answer is more important than how long it is Enter your answers in this document You may use various sources of information to inform your answers, including your resources provided by ACBI, books, and online sources. You must acknowledge and cite your sources. ii. Scenario Scenario: E-Health System Your part of a project team working to implement an E-Health System (EHS) for a national hospital that would securely record details of health consultations, treatments, referrals and findings, support dispensing of medications and report on individual and corporate health information requirements. The project would require: Upgrades to the IT systems Installation of new hardware in medical/health offices The training of medical staff in the new system and its reporting requirements. The following is a list of the main stakeholders and their titles from the Stakeholder Register:
The following is a WBS of the project developed by Project Manager: Sr.NameTitleContact 1.Steve SmithDirector Operations0415 254 301 2.Laura JohnsGeneral Manager0415 254 302 3.Maria GilmourJoint-Director Infrastructure0415 254 303 4.Michael PatersonAssistant Director – IT0415 254 304 5.Danielle RichardProject Manager0415 254 306
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
iii. Questions 2A. In preparation for preparing a Quality Management Plan, you are to discuss requirements with relevant stakeholders. Set up a meeting with: Yourself, role playing being the Project Manager Steve Smith and Michael Paterson, as role played by your Trainer & Assessor. NOTE: Your Trainer & Assessor will observe your meeting and complete the Observation Checklist provided in the “BSBPMG513 Marking Guide” document on Moodle. Use the meeting to discuss: Quality objectives and standards Quality requirements Before the meeting, prepare a list of three or more questions you will ask the stakeholders during the meeting. Document these in the space provided below. After the meeting, record notes of what was discussed, including the feedback received. Questions prepared prior to the meeting: Q1)What is your definition about the quality? Q2) What is your expectation from the project? Q3) What are the area that required for more focus in managing project management? Babar, Y., Oracle International Corp, 2019.Methods and system for integrating social media analysis into an enterprise project management system. U.S. Patent 10,223,659. Meeting notes: At the time of undertaking meeting the there are some important key aspect that being discussed within the meeting for better management of the project. Quality standards Quality objectives
role of project manager Time line of the project. Javed, S.A. and Liu, S., 2019. Bidirectional absolute GRA/GIA model for uncertain systems:applicationinprojectmanagement.IEEEAccess,7,pp.60885-60896. 2B. You now need to create your Quality Management Plan. Ensure your plan includes: Quality objectives and standards Measurable quality metrics for both project and products Quality assurance tool, techniques, or methods Quality control tools, techniques, or methods Quality checklist for project deliverables Use the template provided on Moodle called “Quality Management Plan Template” to create your plan. Save your plan as “Quality Management Plan – Your Name”, with “Your Name” replaced with your first and last names. Ensure you submit your plan as part of your assessment. Answer in 150-300 words. It is important for business organisation to develop an effective quality management plan that help in eliminating the possibilities of arising any kind of issues and defects in product development exercise. Objective of project: The main objective of project is to produce quality products to satisfy customers’ needs and wants.
For this project, manager can use various quality assurance tools like PDCA, RapidImprovement (or Kaizen) events. These are effective in managing the quality and also ensure about the defects that can be arise at the time of product development. Measurable quality metrics includes deliverables of the products that directly translate the overall customers’ needs into acceptable performance measures in relation to products and process. In this, project manager is able to effectively access the efficiency level, performance of the projects and overall progress of the project that assist in establishing the set goals and objectives in an effective manner. 3. Quality Responsibilities and Roles Team MemberPersonnelResponsibility Danielle RichardProject managerPrimary role of project manager is to develop an effective approach for software quality assurance in order to ensure that E-Health System meet the established standards and at the same time also analysis the issues i.e. disconnection of system. Steve SmithProject sponsorProject sponsor is responsible for improving project's success by providing proper direction to its team members. As, project sponsor clearly communicate the value initiatives to the project members and company as well. Michael PatersonProject team member/sProject team members focusing on different area such as agreement management, communication, proper training, information technology management, data migration and many more . Maria Gilmour, Laura Johns StakeholdersProject stakeholder are spending resources and also communicate with others. The main focus of stakeholder is to manage project activities consistently and at the same time also exploit the benefit of a project.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4. Quality Metrics (Project and Product) Quality Metrics - Project Project Management ProductQuality Metrics E-Health SystemIncreasing the efficiency implicates that not only reduce cost but at the identical time it improve the quality services. E-health system assist in improving the quality of health care as it focus in quality assurance of the products. Quality Metrics – Products/Deliverables Project DeliverablesQuality Metrics E-Health SystemIntervention of EHS must be evidence base as its value and competence may not be presumed but at the same time also laborious scientific assessment. 5. Quality Assurance Tools, Techniques and Methods ToolDescription Cost benefit analysisIn EHS it help in determining whether cost to improve a procedure is effective for the benefit or not. In this the main focus of project manager is to manage the issue of disconnection of system. Control chartsThis type of quality assurance tool help in analysing the improvement opportunities in order to determine the negative and unexpected trends in the project. InspectionIt is used is analysis or inspect a process in order to evaluate whether it is functioning effectively or not. Tree diagramsIt is used by project manager to decompose the relationship between different variables. For EHS, WBS is an effective example of this quality
assurance tool.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
6. Quality Control Tools, Techniques and Methods ToolDescription Flow charting It is one of the effective quality control tool that used to analysis the risk present in the project activities. As it also determine the potential problem in the process. Scatter Diagrams This type of quality control tool show the correlation among two variables. In EHS, project manager show the relation among different parameters that define the possibilities of project outcomes. Run chart It is refers to series of recorded data over time and also represent graphically. By this, EHS project manager can easily understand the progress of their activities and also determine whether there is any kind of issue of not.
7. Quality Checklist Instructions: Select one sub-deliverable from WBS, then complete the table below. Project DeliverableQuality ExpectationsQuality Criteria CommunicationRegular communication is required for managing the project activities more effective and successful. For meeting the project objectives direct communication important aspect that may assist reducing the possibilities of arising any kind of issues and obstacles. For maintaining quality project Interpretative communication is required. Project manager needs to use interpretative communication to convey all the necessary information to team members for attain positive outcomes. Clear and Concise is important in project activities of EHS Communication should be clear and concise so that team members can easily met their project goals.
C. Task 3 – Project i. Instructions for students Task 3 of this assessment requires you to review the activities you have planned and would conduct to effectively manage project quality. In this assessment Task you will be required to update key quality management documents and write a Lessons Learned Report. Read the scenario provided below. Then answer the following questions using the space provided: Answer all parts of each question Use your own words and give examples wherever possible The quality of your answer is more important than how long it is Enter your answers in this document You may use various sources of information to inform your answers, including your resources provided by ACBI, books, and online sources. You must acknowledge and cite your sources. ii. Questions 3A. Plan a quality assurance audit to ensure quality standards were met during project for both project processes and project products. Create a checklist of steps you would take and draw a flow chart of audit process. Answer in 40-80 words. ItemsProject planningRelevance 1.1Does the project have a formal project plan?Yes 1.2Key elements of a project plan present? 1.Project definition and scope? 2.Project objectives? 3.Cost analysis? 4.Staffing requirement? 5.Time line? 6.Risk analysis? 7.Critical success Criteria goals? Project objectives, Definition, risk analysis are the major key elements of the project plan.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1.3Have all stakeholders been identified?Yes, 1.4Have project accountabilities and responsibilities been clearly defined? Yes, all the responsibilities of project been clearly determined. Yang, Y., 2020, June. Research on the Network Information Construction of the Whole ProcessTrackingAuditofUniversityConstructionProject.InJournalofPhysics: Conference Series(Vol. 1574, No. 1, p. 012087). IOP Publishing. 3B.Assess a finished product against quality standard and update quality register. Use the template provided on Moodle called “Quality Register Template” to create your register. Save your register as “Quality Register – Your Name”, with “Your Name” replaced with your first and last names. Ensure you submit your register as part of your assessment. Answer in 80-160 words. Bugarin, G., Rothschild, L., Bain, R. and Ricklefs, A., 2019. Beyond the Audit: Making EfficiencyEasyandEnticingbyAddressingProjectProcurement.JournalofCivil Engineering and Architecture,13, pp.283-292. Qual ity ID Product Name Quality Criteria Quali ty Meth od Prod ucer Reviewe r/ Approve r Prod uce Date Review Date Resu lt Quality Record Storage/Link
1E-Health System (EHS) Pr Pr Revie w Dani elle Rich ard Steve Smith 12/0 4/20 10/05/20E- Heal th pro mise s to impr ove the quali ty of healt hcar e, redu ce costs and help to foste r inde pend ent livin g. 3C. Provide an example where you found variance in defined quality and identify a corrective action. You must present your investigation using a cause and effect diagram and explain what remedial action you would take. Answer in 40-80 words. At the time of producing quality products, manager evaluate that the quality of material is less effective as it creates negative impact over the final production of the products. Therefore, it is significant for project manager to analyse the issues i.e. disconnection of system that arouse in production activities. This can be beneficial in managing defects within the products that further provide opportunity to customers in respect of fulfilling their expectations. Along with this, manager also includes quality assurance tool like PDCA in which they focus on continuous improvement within the process and product as well. Along with this, it also support in managing issues and make proper connection in system to improve the overall performance of project activities. Chen, Q., Jiang, X. and Zhang, Y., 2019. The effects of audit quality disclosure on audit effort and investment efficiency.The Accounting Review,94(4), pp.189-214.wer here
3D. Produce a Lesson Learned Report of quality management issues that could be passed on to the other projects. Issues could be related to quality definition and planning, quality assurance throughout the project, and quality control processes applied to products of the project. Document your report using the table below. Answer in 80-160 words. At the time managing quality there are various issues that faced by project manager. As the main issue that company is face is disconnection in systems as it create various challenges in-front of people in managing the information about the clients. In this, they focus on developing an effective planning which includes all the necessary activities execute to completing the project in an effective manner. Along with this, it is also crucial for project team to evaluate all the operational activities as per continuous basis sin order to eliminate the issues in deliverables. Rowe, S.F., 2020.Project management for small projects. Berrett-Koehler Publishers. Project Code and Name: Lesson Category / Sub- Category: Lesson of past projects
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
worked in this project Proper sources include like staff members, user management and project manager. Positive lesson learned for future projects The material quality was good that assist in managing customer’s expectation. Need to improve communication between team members Negative lesson learned for future projectsPoor leadership and line management 3E. Review your original Quality Management Plan and update according to any issues you have encountered. Save your revised plan as “Quality Management Plan Revised – Your Name”, with “Your Name” replaced with your first and last names. Ensure you submit your revised plan as part of your assessment. Lock, D., 2020.Project management. Routledge.