logo

Assignment on Career Profile

   

Added on  2020-05-11

7 Pages1334 Words92 Views
NAMEMobile: E-mail: Address:CAREER PROFESSIONALA professional Industrial Engineer with more than 13 years of progressive experience inPlanning and Project Control of various EPC projects as the consultant and client. Strongworking knowledge of project management methodologies, tools, and techniques (PMBOK)Familiar with contract concepts, engineering documents, and drawings. Highly motivated andcomprehensive mind, high ability of team working and good communication skills.EDUCATIONAL QUALIFICATIONBachelor of Science in Industrial EngineeringShahid Bahonar Kerman University[2001]WORK EXPERIENCEMAPNA Group , MAPNA MD1Project Planner / SchedulerMay, 2016 to CurrentKey Responsibilities:Prepare EPC Level 3 Schedule in the Combined cycle power plant IndustriesPrepare Proposal scheduleAnalysis of modifications to the to the project scheduleMonitor and document monthly progress for assigned projects including critical pathanalysis, and schedule narratives

Update and close schedules to support month end close and periodic reporting.Prepare weekly and monthly project schedule status reports for project managersPrepare, baseline, status, maintain and report project scheduleDeploy standard work breakdown structure, coding, analysis and reports for projectschedules maintainedAnalyze detailed plans, development of recovery plans by engaging subcontractors inputs formaterials, resources and toolsPlanning, scheduling, status and reporting progress of all site activities from contract awardto contract closeout through engineering, procurement, construction, commissioning.Afagh Energy Pars Company, Kahnooj combined cycle Power plant, IranPlanning and project control supervisorMarch, 2013 to May, 2016Key Responsibilities:Provided/developed resource/cost loaded project time schedule (Oracle Primavera ProjectManagement Software) including Basic & Detail Design, Tendering, Supply/Manuf.,Transportation, Construction (Civil/Structural, Mechanical, E&I) & Commissioningactivities and milestones both independently and team environmentsProvided/developed project WBS and codingPrepared project scheduling and progress measurement proceduresPrepared, analyzed and monitored project progress reports based on critical path method(CPM) including critical activities and milestones to determine the effect of changes in theschedule and make recommendations for corrective actions and recovery plan, S-Curve(Plan, Actual & Look ahead Forecast), updated time schedule, performance report, and

schedule narratives from contract award to contract closeout through (Monthly, Weekly,Daily)Attended progress review meetings with main stakeholders such as client, senior managers,project team, and subcontractors to present, analyze and propose modifications to the projectschedule, critical path, materials, resources and toolsReviewed and analyzed of contractor’s delays based on Time Impact Analysis (TIA).Tosee Siloha Company, Tehran Cement Factory, IranPlanning and Project SupervisorDecember, 2011 to December, 2012Key Responsibilities:Preparing Master and Detailed Schedule in form of MSP software for Tehran Cement Plantproject.Preparing daily, weekly and monthly reports for the client.Applying Earned Value Technique (EVT) as a tool for controlling and predicting cost andtime of project and appropriate future estimation in the project.Cooperating with workshop financial assistance for unification of accounting and projectcontrol systems via project WBS. Cooperating with workshop technical and financial officein cost estimating and also sending quarter reports of income and cost to the headquarters.Determining performance indexes (past performance indexes and future performanceindexes) for the project.Presenting Cash Flow chart to project management.Preparing required documents for company’s future claims.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Continuing Professional Development | Docx
|3
|392
|59

(Solved ) Competency Demonstration Report
|8
|1627
|74

PROJECT AND QUALITY MANAGEMENT.
|19
|3490
|181