COMPETENCYDEMONSTRATION REPORTCareer Episode 3NAME

CE 3.1 Project InformationName of the project: PARAND power plant developmentLocation of the project: Tehran, IranProject Duration: [PLEASE FILL]Organization: MAPNA GroupRole and Designation during the time: Planning and Project Control EngineerCE 3.2 Project BackgroundCE 3.2.1 Background of the organisationParand Power Plant is a 942 MW power plant. The plant comprises of six V94.2 versiongas turbine units. The gas turbines has been developed by Ansaldo Energia Company of Italy.The company has been set up on an area of 100 hectares in the south western region of Tehran.The power plant has many associate clients: Iran Power Development Company (IPDC) andGhods Niroo Consulting Engineers Company as the client consultant. The main contractor of thepower plant is MAPNA Power Plant Construction and Development Company (MD-1). Thepower station had a capacity of 230 kV. All engineering, procurement and construction (EPC)works for the power plant is handled by MD1. The power plant makes use of oil and oil gas forthe production of power.

CE 3.2.2 Objectives developed for the projectFor the completion of this project in accordance to the requirements of the clients, I hadset out the following list of objectives to be followed:To prepare a proposal for the schedule of the work.To make use of standard mode of coding, work break down structure and analysis forthe development of the project progress report. To work on the planning scheduling and reporting of the status of the work that isbeing done from the initiation to the completion of each of the task. To produce a plan for the mitigation of any kind of risk that might occur during theprogress of the project.To find out proper strategies and solution for the overcoming of road blocks anddelays. CE 3.2.3 My area of workI was asked to help the power plant with my planning and project control skills as acontrol engineer for the project. With the help of experience in the field of large projects I wasable to easily manage the work that was provided to me. I was able to complete the projectwithin the requested deadline and also within the budget of the client. My main objective was toprepare engineering, procurement and construction level 3 schedule. This was to be implementedin to the combined cycle power plant industries. Apart from this I had used my writing skills towork on the preparation of the project progress plan for the project. The progress report was thenshared with the management and the supervisors of the project.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project on Control at Damavand Combined Cycle Power Plant
|8
|1626
|62

Competency Demonstration Report- PDF
|8
|1635
|152

Assignment on Career Profile
|7
|1334
|92

Continuing Professional Development | Docx
|3
|392
|59

Construction of Umm Al Houl Power Plant IWWP - Project Overview
|7
|1752
|275

Competency Demonstration Report
|11
|1960
|158