logo

Construction claims and Road Project Case study 2022

Week 1 BS4S14 – Research Methods Research Topic Proposal Form

5 Pages810 Words9 Views
   

Added on  2022-08-13

Construction claims and Road Project Case study 2022

Week 1 BS4S14 – Research Methods Research Topic Proposal Form

   Added on 2022-08-13

ShareRelated Documents
Running head: CONSTRUCTION CLAIMS AND ROAD PROJECTS IN UGANDA
CONSTRUCTION CLAIMS: TYPES, CAUSES AND IMPACT ON ROAD
PROJECTS IN UGANDA
Name of the Student:
Name of the University:
Author’s Note:
Construction claims and Road Project Case study 2022_1
1CONSTRUCTION CLAIMS AND ROAD PROJECTS IN UGANDA
Aslam, Baffoe-Twum and Saleem (2019) in the article Design
Changes in Construction Projects–Causes and Impact on the Cost
have tried to undertake an analysis of the primary causes of design changes
within the different construction projects and also the manner in which they
have affected the completion of the different construction projects,
especially road projects. The researchers formulated two research questions
for addressing the research topic, that is, “What are the impacts of design
changes on the overall project cost?” and “How design changes can impact
the overall project performance?”. The researchers took the help of the
secondary collection method and qualitative data analysis method. For
instance, the researchers collected 40 peer-reviewed articles from the three
online databases, Science Direct, Taylor and Francis and Elseveir, and the
method of systematic review was used for the analysis of these 40 articles
(Aslam, Baffoe-Twum and Saleem 2019).
The result obtained by the researchers indicate that design changes
are an important cause of construction claims and “may upshot into cost
overrun between 5 and 40% of the project” which in turn can adversely
affect project performance (Aslam, Baffoe-Twum and Saleem 2019). The
strength point of this is article is the fact that the researchers collected
different articles related to design changes, construction claims and project
performance which had been published in the last 30 years and used the
information offered by the same for the completion of this article. However,
the weakness of this article is that the authors have relied solely on the past
Construction claims and Road Project Case study 2022_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
The Impact of Construction Claims on Construction Projects: A Case Study of Road Projects in Uganda
|36
|7545
|23

Construction claims and road project in Uganda Case study 2022
|6
|904
|21

Critical Review Report Assessment 2022
|4
|1416
|25

Identifying the Problems of Payment Delays in Governmental Projects in Australia
|12
|2651
|151

Engineering Management - Case Study Of HDR Company
|21
|5042
|46

Self-healing concrete
|1
|430
|409