CPCCBC4003A Select and Prepare A Construction Contract
VerifiedAdded on  2023/06/03
|14
|1588
|244
AI Summary
This paper aims at evaluated and giving the in-depth understanding of all the overall steps which one need to undertake while preparing the low rise construction contract. This document therefore, outlines all the necessary steps and criteria used in the building and contraction.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
CPCCBC4003A Select and Prepare A Construction Contract 1
CPCCBC4003A Select and Prepare A Construction Contract:
by Student’s Name
Code + Course Name
Professor’s Name
University Name
City, State
Date
CPCCBC4003A Select and Prepare A Construction Contract:
by Student’s Name
Code + Course Name
Professor’s Name
University Name
City, State
Date
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
CPCCBC4003A Select and Prepare A Construction Contract 2
Residential Building and Specification Contract
Executive Summary
This paper aims at evaluated and giving the in-depth understanding of all the overall steps which
one need to undertake while preparing the low rise construction contract. This document
therefore, outlines all the necessary steps and criteria used in the building and contraction.
Residential Building and Specification Contract
Executive Summary
This paper aims at evaluated and giving the in-depth understanding of all the overall steps which
one need to undertake while preparing the low rise construction contract. This document
therefore, outlines all the necessary steps and criteria used in the building and contraction.
CPCCBC4003A Select and Prepare A Construction Contract 3
Table of Contents
Executive Summary.........................................................................................................................2
Preliminaries....................................................................................................................................3
Date..............................................................................................................................................3
Payments of Works......................................................................................................................4
Scopes of Works..............................................................................................................................4
Technical Drawings and Specifications.......................................................................................4
Australian Standards & Regulations............................................................................................5
Schedule...........................................................................................................................................6
Contract Conditions.........................................................................................................................7
Construction and Design..............................................................................................................8
Other Property and Works...........................................................................................................8
Defect Liability............................................................................................................................9
Ending of the Contract...............................................................................................................10
Dispute Resolution.....................................................................................................................11
Conclusion.....................................................................................................................................12
References......................................................................................................................................13
Table of Contents
Executive Summary.........................................................................................................................2
Preliminaries....................................................................................................................................3
Date..............................................................................................................................................3
Payments of Works......................................................................................................................4
Scopes of Works..............................................................................................................................4
Technical Drawings and Specifications.......................................................................................4
Australian Standards & Regulations............................................................................................5
Schedule...........................................................................................................................................6
Contract Conditions.........................................................................................................................7
Construction and Design..............................................................................................................8
Other Property and Works...........................................................................................................8
Defect Liability............................................................................................................................9
Ending of the Contract...............................................................................................................10
Dispute Resolution.....................................................................................................................11
Conclusion.....................................................................................................................................12
References......................................................................................................................................13
CPCCBC4003A Select and Prepare A Construction Contract 4
Preliminaries
The overall preliminaries included in the tender document mainly discussed and appraised as
follows
Work scopes
All the works as well as the overall specification scopes mainly appraised and examined in the
tender document. The works will be performed as per the closure
Contact Persons
The tenderer mainly required not give any information or receive any information as well as
communication from other persons expects the ones whose contracts have been listed in this
document. The information and the communication should be channeled to these persons only at
all cost. The contacts of the concerned persons primarily illustrated as follows
Preliminaries
The overall preliminaries included in the tender document mainly discussed and appraised as
follows
Work scopes
All the works as well as the overall specification scopes mainly appraised and examined in the
tender document. The works will be performed as per the closure
Contact Persons
The tenderer mainly required not give any information or receive any information as well as
communication from other persons expects the ones whose contracts have been listed in this
document. The information and the communication should be channeled to these persons only at
all cost. The contacts of the concerned persons primarily illustrated as follows
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
CPCCBC4003A Select and Prepare A Construction Contract 5
Date
This tender is expected to last for duration of three years. The contract mainly scheduled to begin
from 23rd November, 2018 and end on the 23rd November, 2021.
Payments of Works
The terms of the overall payments as far as the tender is concerned are not only important but
also essential in the meantime. The payments mainly conducted in various sections in line with
the works completed and approved by the engineer. The sheet used in the overall computation of
the payment mainly illustrated and incorporated in the works as the illustrated below
Figure on payment progress (Wong, Wang and Do 2014)
Date
This tender is expected to last for duration of three years. The contract mainly scheduled to begin
from 23rd November, 2018 and end on the 23rd November, 2021.
Payments of Works
The terms of the overall payments as far as the tender is concerned are not only important but
also essential in the meantime. The payments mainly conducted in various sections in line with
the works completed and approved by the engineer. The sheet used in the overall computation of
the payment mainly illustrated and incorporated in the works as the illustrated below
Figure on payment progress (Wong, Wang and Do 2014)
CPCCBC4003A Select and Prepare A Construction Contract 6
Scopes of Works
Technical Drawings and Specifications
All the anticipated works must be performed and conducted as per the analogy as well as the
overall description and specifications detailed in the design drawings. The contractor must all
costs adhere to the overall specifications as well as the engineering designs as outlined in the
technical drawings. Some of the key technical drawings as well as the overall evaluation and
consideration for the particular works mainly outlined as indicated in the detailed drawings
below
Figure Demarcating the Drawings for the Proposed Residential Building
Australian Standards & Regulations
It is important to note all the installations as well as the purchasing of the materials for the
purposes of the construction must at all cost conform to the set criteria as well as rules and
regulations regarding the overall practices. The norms regarding the overall evaluations and the
Scopes of Works
Technical Drawings and Specifications
All the anticipated works must be performed and conducted as per the analogy as well as the
overall description and specifications detailed in the design drawings. The contractor must all
costs adhere to the overall specifications as well as the engineering designs as outlined in the
technical drawings. Some of the key technical drawings as well as the overall evaluation and
consideration for the particular works mainly outlined as indicated in the detailed drawings
below
Figure Demarcating the Drawings for the Proposed Residential Building
Australian Standards & Regulations
It is important to note all the installations as well as the purchasing of the materials for the
purposes of the construction must at all cost conform to the set criteria as well as rules and
regulations regarding the overall practices. The norms regarding the overall evaluations and the
CPCCBC4003A Select and Prepare A Construction Contract 7
laws pertaining the understanding of the practices in this case mainly demarcated as indicated in
the analysis below
Schedule
The schedules regarding the contract documents are not only important but also important at all
the costs. The scheduling mainly performed and conducted as per the last of the building codes
as well as the overall laws governing the contract in Australia. The analysis for the scheduling in
line with this tender document mainly examined and evaluated as follows
DESIGN
1 Design and Construct – Consultants Fees :
· Architect, Engineers, Quantity
Surveyor & Building Surveyor
$ $
2 Survey (site / location) $ $
3
Services (water, power, gas) connections /
headworks
· Western Power $ $
· Water Authority $ $
· Alinta Gas $ $
SUBTOTAL $ $
laws pertaining the understanding of the practices in this case mainly demarcated as indicated in
the analysis below
Schedule
The schedules regarding the contract documents are not only important but also important at all
the costs. The scheduling mainly performed and conducted as per the last of the building codes
as well as the overall laws governing the contract in Australia. The analysis for the scheduling in
line with this tender document mainly examined and evaluated as follows
DESIGN
1 Design and Construct – Consultants Fees :
· Architect, Engineers, Quantity
Surveyor & Building Surveyor
$ $
2 Survey (site / location) $ $
3
Services (water, power, gas) connections /
headworks
· Western Power $ $
· Water Authority $ $
· Alinta Gas $ $
SUBTOTAL $ $
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
CPCCBC4003A Select and Prepare A Construction Contract 8
CONSTRUCTION
1 Preliminaries $ $
2 Earthworks $ $
3 Site works $ $
4 Concrete Work $ $
5 Structural Steelwork $ $
6 Metalwork $ $
7 Brickwork & Blockwork $ $
8 Carpentry $ $
9 Second Fix Carpenter $ $
10 Roof Carpenter $ $
11 Joinery and Cabinetwork $ $
12 Hardware $ $
13 Roofer and Roof Plumber $ $
14 Drainage and Plumbing $ $
15 Electrical Services $ $
16 Mechanical Services $ $
17 Plasterwork & Suspended Ceilings $ $
18 Wall and Floor Tiling $ $
19 Resilient Finishes $ $
20 Glazier $ $
21 Paintwork $ $
22 Fencing $ $
23 Clean Up $ $
CONSTRUCTION
1 Preliminaries $ $
2 Earthworks $ $
3 Site works $ $
4 Concrete Work $ $
5 Structural Steelwork $ $
6 Metalwork $ $
7 Brickwork & Blockwork $ $
8 Carpentry $ $
9 Second Fix Carpenter $ $
10 Roof Carpenter $ $
11 Joinery and Cabinetwork $ $
12 Hardware $ $
13 Roofer and Roof Plumber $ $
14 Drainage and Plumbing $ $
15 Electrical Services $ $
16 Mechanical Services $ $
17 Plasterwork & Suspended Ceilings $ $
18 Wall and Floor Tiling $ $
19 Resilient Finishes $ $
20 Glazier $ $
21 Paintwork $ $
22 Fencing $ $
23 Clean Up $ $
CPCCBC4003A Select and Prepare A Construction Contract 9
24 Stormwater Drainage $ $
Contract Conditions
The conditions governing this contract mainly discussed in the various subsections as outlined in
the sections below
Construction and Design
It is mandated for the contractor to conduct all the said works as per the instructions outlined in
this document and not to bridge or omit any of the works. The governing norms regarding the
overall analysis mainly discussed as well as appraised as indicated in the illustration below as per
the Australia standards for the building and the related codes.
24 Stormwater Drainage $ $
Contract Conditions
The conditions governing this contract mainly discussed in the various subsections as outlined in
the sections below
Construction and Design
It is mandated for the contractor to conduct all the said works as per the instructions outlined in
this document and not to bridge or omit any of the works. The governing norms regarding the
overall analysis mainly discussed as well as appraised as indicated in the illustration below as per
the Australia standards for the building and the related codes.
CPCCBC4003A Select and Prepare A Construction Contract 10
Figure Illustrating the Conditions Governing and Directing the Contractor
Other Property and Works
It mandatory for the contractor to ensure that all the works he or she performs as per the required
set rules without bridging or destroying the existing properties in the long run. in essence, the
contractor remains the sole liable person to all the destructions as well as the damages which he
or she might cause to the existing property. The conditions governing the existing properties
mainly demarcated and summarized as indicated below (Sanchez, Lehtiranta and Hampson 2015
p.1924).
Figures illustrating the Conditions governing the existing works (White 2018 July p.151).
Defect Liability
The contractor is required to provide and claim for all the payments regarding the additional
costs incurred due to the works which do not conform to the ones precious described in the
contract document. Furthermore, the contractor is required to replace as well as rework on all
the un-conforming works without requesting for additional payment. The law forms the basis
and ensures that quality works is often delivered as per the requirement at all costs. The
Figure Illustrating the Conditions Governing and Directing the Contractor
Other Property and Works
It mandatory for the contractor to ensure that all the works he or she performs as per the required
set rules without bridging or destroying the existing properties in the long run. in essence, the
contractor remains the sole liable person to all the destructions as well as the damages which he
or she might cause to the existing property. The conditions governing the existing properties
mainly demarcated and summarized as indicated below (Sanchez, Lehtiranta and Hampson 2015
p.1924).
Figures illustrating the Conditions governing the existing works (White 2018 July p.151).
Defect Liability
The contractor is required to provide and claim for all the payments regarding the additional
costs incurred due to the works which do not conform to the ones precious described in the
contract document. Furthermore, the contractor is required to replace as well as rework on all
the un-conforming works without requesting for additional payment. The law forms the basis
and ensures that quality works is often delivered as per the requirement at all costs. The
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
CPCCBC4003A Select and Prepare A Construction Contract 11
illustrations in line with the norm mainly illustrated as per the diagram below (Oladotun and
Edosa 2017).
Ending of the Contract
The norms regarding the termination of the contract as far as this tender is concerned are not
only essential but equally important at all the costs. The close regarding the tender termination as
far as the Australian rules and regulation is concerned mainly illustrated as indicated in the
analysis below (Gurmu and Aibinu 2018 p.717).
illustrations in line with the norm mainly illustrated as per the diagram below (Oladotun and
Edosa 2017).
Ending of the Contract
The norms regarding the termination of the contract as far as this tender is concerned are not
only essential but equally important at all the costs. The close regarding the tender termination as
far as the Australian rules and regulation is concerned mainly illustrated as indicated in the
analysis below (Gurmu and Aibinu 2018 p.717).
CPCCBC4003A Select and Prepare A Construction Contract 12
Illustration on Ending Contract
Dispute Resolution
The dispute resolutions aspects in line with the tender documents as well as the overall analogy
mainly appraised and discussed as per the analysis below. The resolution techniques mainly
governed by the overall building and constructions laws in Australia State.
Illustrations on the Disputes and the Related Emerging Conflicts (Klee 2018)
Illustration on Ending Contract
Dispute Resolution
The dispute resolutions aspects in line with the tender documents as well as the overall analogy
mainly appraised and discussed as per the analysis below. The resolution techniques mainly
governed by the overall building and constructions laws in Australia State.
Illustrations on the Disputes and the Related Emerging Conflicts (Klee 2018)
CPCCBC4003A Select and Prepare A Construction Contract 13
Conclusion
In summary, this paper examined and explored all the aspects which one have to consider and
incorporate in the contract document. Furthermore, the paper elobrated on the scopes of the
works, the mode of payments for the works completed as well as the avenue for resolving the
emerging disputes.
Conclusion
In summary, this paper examined and explored all the aspects which one have to consider and
incorporate in the contract document. Furthermore, the paper elobrated on the scopes of the
works, the mode of payments for the works completed as well as the avenue for resolving the
emerging disputes.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
CPCCBC4003A Select and Prepare A Construction Contract 14
References
Klee, L., 2018. International construction contract law. John Wiley & Sons.
White, G., 2018, July. Design and Construct Contracts for Airport Asphalt Resurfacing. In Civil
Infrastructures Confronting Severe Weathers and Climate Changes Conference (pp. 142-151).
Springer, Cham.
Gurmu, A.T. and Aibinu, A.A., 2018. Survey of management practices enhancing labor
productivity in multi-storey building construction projects. International Journal of Productivity
and Performance Management, 67(4), pp.717-735.
Oladotun, A.J. and Edosa, O.M., 2017. The Need for Professionalism and Competencies in the
Construction Industry. International Journal of Built Environment and Sustainability, 4(1).
Wong, P.S., Wang, Z.H. and Do, D., 2014. Use of the security of payment act in resolving
disputes in Victoria, Australia. Journal of Legal Affairs and Dispute Resolution in Engineering
and Construction, 7(1), p.A4514001.
Sanchez, A.X., Lehtiranta, L.M. and Hampson, K.D., 2015. Use of contract models to improve
environmental outcomes in transport infrastructure construction. Journal of Environmental
Planning and Management, 58(11), pp.1923-1943.
References
Klee, L., 2018. International construction contract law. John Wiley & Sons.
White, G., 2018, July. Design and Construct Contracts for Airport Asphalt Resurfacing. In Civil
Infrastructures Confronting Severe Weathers and Climate Changes Conference (pp. 142-151).
Springer, Cham.
Gurmu, A.T. and Aibinu, A.A., 2018. Survey of management practices enhancing labor
productivity in multi-storey building construction projects. International Journal of Productivity
and Performance Management, 67(4), pp.717-735.
Oladotun, A.J. and Edosa, O.M., 2017. The Need for Professionalism and Competencies in the
Construction Industry. International Journal of Built Environment and Sustainability, 4(1).
Wong, P.S., Wang, Z.H. and Do, D., 2014. Use of the security of payment act in resolving
disputes in Victoria, Australia. Journal of Legal Affairs and Dispute Resolution in Engineering
and Construction, 7(1), p.A4514001.
Sanchez, A.X., Lehtiranta, L.M. and Hampson, K.D., 2015. Use of contract models to improve
environmental outcomes in transport infrastructure construction. Journal of Environmental
Planning and Management, 58(11), pp.1923-1943.
1 out of 14
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024  |  Zucol Services PVT LTD  |  All rights reserved.