COMPETENCY DEMONSTRATION REPORT
Career Episode 1
MOHSIN BAJWA

CE 1.1 Project Information
Name of the project: Control System Revamp Project
Location of the project: Yanbu, Saudi Arabia
Project Duration: Jan13, to Aug, 13
Organization: Yokogawa Services Saudi Arabia Company
Role and Designation during the time: Project Engineer
CE 1.2 Project Background
CE 1.2.1 Characteristics of the project
The Arabian Industrial Fibers Company, a subsidiary of SABIC (Saudi Basic
Industries Corporation), has selected Yokogawa as their Process Control System (PCS) vendor
for their Control System Revamp project. The project scope was to Design, Procure, Install, and
Commission the Yokogawa Control System which includes Distributed Control System (DCS),
Emergency Shutdown System (ESD) and Fire and Gas Control System (FGS).
CE 1.2.2 Objectives developed for the project
As a project engineer, I set the following objectives and goals for the successful delivery
of the project:
To provide quality hardware, software, engineering services, Installation services
and commissioning services
To manage and deliver the entire project within the budget and agreed schedule

To deliver the highest standard of the products and services
To manage the operational activities in an efficient and effective manner
CE 1.2.3 My area of work
I was assigned as the project engineer, and hence, it was my job to ensure that the project
does not lack in any sector and all the expected outcomes are being delivered. I had to manage
the site and assure that every individual is delivering and accomplishing their sector of jobs. I
developed the schedule of the project and relative activities of the project and executed LDs
(Liquid Damages) on vendors in case of failure to meet the project deadlines. I prepared the
documentation of the regular progress and growth of the project in manner to collect and store
the on-going growth of the project. I was very much aware of the given timelines for the
completion of project as per management instructions, budget allocations, and fulfilling the
customer satisfaction by complying with the standards for Yokogawa product. I started my work
by preparing detailed “Responsibility Assignment Matrix” which clearly defined the
participation and responsibilities of internal departments, vendors and sub contractors in
completing tasks for a project in a given time span. I also made “Project Execution Plan”
demonstrating each and every step, clearly showing the objectives of the project and how they
will be accomplished as per site conditions.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Wireless Temperature Monitoring of Substation Buildings in Main Control Room - Career Episode 3
|8
|1463
|213

Experienced Project Engineer in Oil & Gas Field - Mohsin Javaid Bajwa
|4
|696
|416

Saudi Elastomers Project - PDF
|7
|1674
|121

Electronics Engineer Job Profile
|5
|902
|154

Career Episode 2: Field Survey Project for Modernization of Petro-Rabigh Old Refinery
|11
|1866
|196

Project on Refinery off Gas Cracker Commissioning
|9
|1903
|118