CE 3.1 Project Information
Name of the project: Wireless Temperature Monitoring of Substation Buildings in Main
Control Room
Location of the project: Al-Jubail, Saudi Arabia
Project Duration: Nov15, to March, 16
Organization: Yokogawa Services Saudi Arabia Company
Role and Designation during the time: Project Engineer
CE 3.2 Project Background
CE 3.2.1 Characteristics of the project
The National Chemical Fertilizer Company, a subsidiary of SABIC (Saudi Basic
Industries Corporation), has selected Yokogawa as their Wireless Control System (WCS) vendor
for implementing wireless monitoring technology. I was assigned as the project engineer for the
implementation of the necessary amendments those were necessary for the delivery of the
project. I had team whom I needed to motivate for the accomplishment of the entire operational
activities that could lead the project to meet the objectives and goals of the project. Project scope
was to Design, Procure, install, and Commission the Yokogawa Wireless Instruments and
Wireless system.
CE 3.2.2 Objectives developed for the project
Yokogawa project’s objective was to provide quality hardware, software, engineering
services, Installation services and commissioning services within the budget and agreed schedule
Wireless Temperature Monitoring of Substation Buildings in Main Control Room - Career Episode 3_2
in supplying a Wireless system that will monitor the temperature of Substations and the data will
be transferred through Wireless communication to the Distributed Control System in Main
Control Room.
CE 3.2.3 My area of work
CE 3.2.4 Project Group
CE 3.2.5 My responsibilities throughout the project
I was given the responsibility to lead the project due to the successful completion of earlier
projects by me. I started this project as a ‘Project Engineer’ in November 2015 and completed
successfully in March 2016. My responsibilities were as listed below:
a) Reporting to the Yokogawa Project Manager.
b) Responsible for the detailed engineering, design, assembly and testing of the system.
Wireless Temperature Monitoring of Substation Buildings in Main Control Room - Career Episode 3_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Competency Demonstration Report for Control System Revamp Project
|9
|1886
|161

Saudi Elastomers Project - PDF
|7
|1674
|121

Upgrading Utility Culverts Security System Project
|8
|1967
|70

The Competency Demonstration Report
|10
|1738
|77

Competency Demonstration Report Doc
|8
|1636
|91

Experienced Project Engineer in Oil & Gas Field - Mohsin Javaid Bajwa
|4
|696
|416