Running head: GOLD-CINEMA SYSTEM ANALYSIS
GOLD-CINEMA SYSTEM ANALYSIS
Name of the Student
Name of the University
Author Note

GOLD-CINEMA SYSTEM ANALYSIS1
Table of Contents
Introduction................................................................................................................................2
Discussion..................................................................................................................................2
System Development Life Cycle (SDLC)..............................................................................2
Work Breakdown Structure (WBS).......................................................................................7
PERT Chart............................................................................................................................7
Investment Evaluation (for five-year)....................................................................................7
Use-case diagram...................................................................................................................7
Summary....................................................................................................................................8
Reference..................................................................................................................................10

GOLD-CINEMA SYSTEM ANALYSIS2
Introduction
The ticket office, Gold-Cinema is planning to evolve their ticket booking system to an
online-based booking system. It will help them to keep track of their productions, seat
availability, customers booking the seats and performance that takes place daily. On
implementing the system, necessary information like the type of production (play, movie or
concert), number of tickets sold and on which date a selective performance took place can be
stored. Similarly, these stored data can be easily searched at any point of time. The following
report will discuss about the life cycle of the Gold-Cinema system development along with its
work breakdown structure (a hierarchical layout of the work that will be implemented by the
project team in order to develop the final system) (Siami-Irdemoosa, Dindarloo and
Sharifzadeh 2015). It will also contain pert chart based on the system’s WBS (Work
Breakdown Structure), five-year investment evaluation of the online system and Use Case
diagram of the same.
Discussion
System Development Life Cycle (SDLC)
A System Development Life Cycle mainly comprises six core processes in order to
develop a system that will meet the customer requirement. To develop the Gold Cinema
project, the same development process can be used (Isaias and Issa 2015). The process are
- Planning Phase
- System Analysis Phase
- System Designing Phase
- Development and Implementation
- Testing of the Developed System
- Deployment and Maintenance of the System

GOLD-CINEMA SYSTEM ANALYSIS3
Planning Phase
The planning phase is one of the most important steps for developing a successful
system. Without a proper plan, computing the strength and weakness of a project has no
meaning to it. In this phase, one must decide what they want to develop and what features
they want to implement into the system. These can be done by:
- determining the main aim of the system, what problems the system will solve and the
resource needed to develop the system (resource can vary from monetary based to that
of the people based)
- considering different constraints and preparing different alternative solutions; in case
some problem might rise in later stages of the system development
reviewing what specific features the system will provide that will benefit both the system
admin along with the end users (Ahmed 2015).
For the current case study, the main aim is to develop a system that will keep track of
their renowned customers and give a notification of any upcoming-booked event. In case any
customer face any difficulty while registering in the system or booking a ticket through the
system, there will always be a dedicated support team of advisors who will help the
customers at any point of time.
System Analysis Phase
The end-users (like the facilities that the customers of the system will get as per their
expectation and how the system will perform regarding those expectations) are finalized and
noted in a documented layout. In other words, the system functionality is determined about
exactly which system ideation will be performed by which part of the system, resulting in

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Gold-Cinema Ticketing System Development Online | Report
|15
|2978
|17

Case Study: Online Movie Ticket Booking System for Gold-Cinema
|14
|2601
|59

System Analysis and Design for the Gold-Cinema Case Study
|10
|2315
|73

Science, Technology, and Innovation -
|17
|2638
|31

Systems Development Life Cycle Analysis 2022
|12
|1582
|24

System Analysis and Design: A Case Study of Gold Cinema
|10
|2331
|38