logo

Assignment Specification and Deliverables

Complete the associated processes and submit specified deliverables for a scenario involving the development of a new style of bicycle.

19 Pages2316 Words475 Views
   

Added on  2023-03-30

About This Document

This document provides the assignment specification and deliverables for a study material. It includes steps for logging into SAP fiori software, creating materials and routing for production planning, completing the fulfilment process for a purchase order, creating a purchase order and goods receipt, and advantages of SAP HANA.

Assignment Specification and Deliverables

Complete the associated processes and submit specified deliverables for a scenario involving the development of a new style of bicycle.

   Added on 2023-03-30

ShareRelated Documents
HOLMES INSTITUTE
FACULTY OF
HIGHER EDUCATION
UNDERGRADUATE
PROGRAM
Assignment Specification and Deliverables
Assignment Specification and Deliverables_1
tmpp1ej0rf83475694_172082419_1007597-EnterpriseSystemsv3.docx Page 2 of 19
To login to the SAP fiori software, we need to do the following steps. First, we enter the user name and password. Here we use
the student id as username and password is their own choice. The second step is to choose the language for using the SAP
software. We can choose a language as our convenience. Here we choose the language as English. The third step is to enter the
client number in the client box. Finally, we have to press the login button it will successfully log in and redirect to the next page.
If password error occurs means you have to change the password using the change password option (Board, 2017).
Prepared by: Ms Urooj R. Khan Moderated by: Dr Paul Hawking March, 2019
Assignment Specification and Deliverables_2
tmpp1ej0rf83475694_172082419_1007597-EnterpriseSystemsv3.docx Page 3 of 19
After the successful completion of login, it will redirect into the dashboard page. In the SAP software dashboard, will shows the
overview of the many services. The services are Enterprise Asset Management, Financial accounting, controlling, and Materials
Management, etc. Each service has many applications for further use. These applications reside under the service names. In the
dashboard at the right corner, it will have a search option. So we can search the individual services and applications also. The
dashboard also has a profile icon (Ganesha Putri, Witjaksono and Idawicaksakti, 2017). We can see our profile and we can also
make a change in the profile information also.
After the login process, we can see the dashboard. After that, we have to do the following six steps. They are explained below.
Prepared by: Ms Urooj R. Khan Moderated by: Dr Paul Hawking March, 2019
Assignment Specification and Deliverables_3
tmpp1ej0rf83475694_172082419_1007597-EnterpriseSystemsv3.docx Page 4 of 19
Task 1 Production Planning
The first step is we need to create a material column. So we move to the dialogue box. In the dialogue box, we open create
material option. For that, we need to search the "Create material" in the search box. Then we have to enter the material name
and other details like material number, quality, and other details. Here we have to enter the material name as "GRTR1034".
Then the material window will be open (Johan, 2013). In the material window, we have to enter the details like account details,
plant details, and payment details. Then we have to save the data for further procedures. Here the bike is similar to the
Mongoose Off Road Bike. There are some minor variations only. And they are the weight of the new bike is 9 KG. That differs
from the previous versions. Also the price of the bike is 3000 USD.
i. The production process for the Grand Tourer bike requires an additional Work Centre (Packaging WC5-###) due to its
complexity. This Work Centre has the same details as the other Work Centres created in the workshop exercises.
Now we need to create the required materials for the manufacturing of the cycle. The bike consists of 8 major components.
And they are shown in the above figure. And they are wheel assembly, Off road frame, Gear assembly, Brake kit, Pedal
Assembly, water bottle cage, packaging and Warranty document. In BOM we need to create all these materials. For that, we
need to open Create BOM and enter the appropriate plant details etc. Now it shows the materials window. Where we need
to enter all these materials. Also, we need to enter the material type, quantity, usage and description. After entering all the
details all the process are over (Khoury, Rich and Jenab, 2015). We successfully created BOM. For display the materials we
Prepared by: Ms Urooj R. Khan Moderated by: Dr Paul Hawking March, 2019
Grand Tourer Bike
(GRTR1###)
(1)
Wheel
Assembly
(ORWA1###)
(2)
Off Road
Frame
(OFFR1###)
(1)
Gear
Assembly
(DGAM1###)
(1)
Brake Kit
(BRKT1###)
Pedal
Assembly
(PEDL1###)
2
Water Bottle
Cage
( CAGE1 ###)
1
Packaging
(PCKG1###)
1
Warranty
Document
(WDOC1###)
1
Assignment Specification and Deliverables_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
BCO2000 Business Process Modelling: SAP Processes
|15
|2170
|30

University. Semester. Cloud Computing. Student ID. Stud
|33
|885
|27