Running head: PROJECT MANAGEMENT
Development of human resource management system in Globoforce
Name of the Student
Name of the University
Author’s note

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1
PROJECT MANAGEMENT
Table of Contents
1. Problem identification............................................................................................................3
1.1 Problem description.........................................................................................................3
1.2 System capabilities...........................................................................................................3
1.3 Business benefits..............................................................................................................3
2. Quantifying project approval factors.....................................................................................4
2.1 Table with breakdown of estimated time for project completion....................................4
2.2 Table with the summary of costs for the project..............................................................7
2.3 Table estimating annual operating costs........................................................................10
2.4 Cost benefit analysis......................................................................................................10
2.4.1 Anticipated benefits................................................................................................10
2.4.2 Estimated annual benefits.......................................................................................11
3. Perform risk and feasibility analysis....................................................................................11
3.1 Determining organizational risks and feasibility...........................................................11
3.2 Evaluating technological risks and feasibility................................................................12
3.3 Assessing resource risk and feasibility..........................................................................12
3.4 Identification of schedule risks and feasibility...............................................................13
4. Establishing project environment.........................................................................................13
4.1 Table outlining information...........................................................................................13
4.2 Description of the work environment............................................................................14
4.3 Processes and procedures that are used..........................................................................14
5. Scheduling of work..............................................................................................................15
5.1 Work breakdown structure.............................................................................................15
5.2 Gantt chart......................................................................................................................17
Bibliography.............................................................................................................................18
Document Page
2
PROJECT MANAGEMENT
1. Problem identification
1.1 Problem description
The paper mainly reflects on the development of human resource management system
for the organization “Globoforce” which is one of the HR consulting organization of
Australia. Currently, the organization uses manual system in order to manage the operations
of the organization but faces number of challenges and issues including inconsistency in data
entry, time consumption, lack of security as well as high chances of data duplication. In order
to resolve the problems as well as challenges, the organization wants to develop human
resource management system.
1.2 System capabilities
The system capabilities of the human resource management system are mainly
elaborated below:
The HRM system will be able to centralize the database of the employees of the
organization
The new system will be helpful in managing the problems of HR department of the
organization in an automated way
Helps in create HR reports for various departments of the organization
1.3 Business benefits
The benefits that are achieved by the organization due to the development of HRM
are generally elaborated below:
Flexibility: The new human resource management system helps in increasing the
flexibility of work with old applications.
Document Page
3
PROJECT MANAGEMENT
Automated processes: The HRM system will be helpful in automating the entire
processes of HR department in order to smoothen the entire work flow.
Easily scalable: It is found that the development of HRM system helps in matching
fast paced HR operations in a quite scalable way.
2. Quantifying factors for project approval
2.1 Table with breakdown of time estimation
It is found that the time which is generally needed for implementing the HRM within
the organization “Globoforce” is given in the table below:
WBS Task Name Duration Start Finish
0
Development of human resource
management system for Globoforce
organization, Australia
85 days
Mon 26-11-
18
Fri 22-03-19
1 Project initiation phase 12 days
Mon 26-11-
18
Tue 11-12-
18
1.1 Determining the business requirements 5 days
Mon 26-11-
18
Fri 30-11-18
1.2 Development of project plan 4 days
Mon 03-12-
18
Thu 06-12-
18
1.3 Testing project feasibility 3 days Fri 07-12-18
Tue 11-12-
18
1.4
Milestone 1: Initiation phase
completion
0 days
Tue 11-12-
18
Tue 11-12-
18
2 Project planning phase 25 days Wed 12-12- Tue 15-01-

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4
PROJECT MANAGEMENT
18 19
2.1 Project tasks scheduling 5 days
Wed 12-12-
18
Tue 18-12-
18
2.2 Estimation of project resources 3 days
Wed 19-12-
18
Fri 21-12-18
2.3 Resource allocation 6 days
Mon 24-12-
18
Mon 31-12-
18
2.4 Development of communication plan 7 days
Tue 01-01-
19
Wed 09-01-
19
2.5 Team allocation 4 days
Thu 10-01-
19
Tue 15-01-
19
2.6
Milestone 2: Completion of planning
phase
0 days
Wed 09-01-
19
Wed 09-01-
19
3 Project execution phase 48 days
Wed 16-01-
19
Fri 22-03-19
3.1 Deployment of project device 8 days
Wed 16-01-
19
Fri 25-01-19
3.2 Development of project prototype 8 days
Mon 28-01-
19
Wed 06-02-
19
3.3 Testing of accounting software 5 days
Mon 28-01-
19
Fri 01-02-19
3.4
Database development for accounts
department
7 days
Thu 07-02-
19
Fri 15-02-19
3.5 Database connection with the device 8 days Mon 04-02- Wed 13-02-
Document Page
5
PROJECT MANAGEMENT
19 19
3.6 Time testing device response 7 days
Mon 18-02-
19
Tue 26-02-
19
3.7 Testing of database system 7 days
Thu 21-02-
19
Fri 01-03-19
3.8 Real time data transfer testing 5 days
Thu 14-02-
19
Wed 20-02-
19
3.9 Adding features with HR department 7 days
Wed 27-02-
19
Thu 07-03-
19
3.10 Software testing 8 days
Wed 13-03-
19
Fri 22-03-19
3.11 Connectivity testing 7 days
Mon 04-03-
19
Tue 12-03-
19
3.12
Milestone 3: Completion of execution
phase
0 days
Thu 07-03-
19
Thu 07-03-
19
4 Closing Phase 5 days
Wed 13-03-
19
Tue 19-03-
19
4.1 Sign off from the stakeholders 3 days
Wed 13-03-
19
Fri 15-03-19
4.2 Review of entire project 2 days
Mon 18-03-
19
Tue 19-03-
19
4.3
Milestone 4: Completion of closure
phase
0 days Fri 15-03-19 Fri 15-03-19
Document Page
6
PROJECT MANAGEMENT
2.2 Table with the summary of costs for the project
The budget that is generally assumed to be required for developing the HRM for the
organization “Globoforce” is given in the table below:.
WBS Task Name Duration Resource Names Cost
0
Development of human
resource management
system for Globoforce
organization, Australia
85 days $49,960.00
1 Project initiation phase 12 days $2,760.00
1.1
Determining the business
requirements
5 days Project Manager $1,200.00
1.2
Development of project
plan
4 days Project Manager $960.00
1.3 Testing project feasibility 3 days
System Analyst, System
Designer
$600.00
1.4
Milestone 1: Initiation
phase completion
0 days $0.00
2 Project planning phase 25 days $5,720.00
2.1 Project tasks scheduling 5 days Project Scheduler $800.00
2.2
Estimation of project
resources
3 days Financial Manager $480.00
2.3 Resource allocation 6 days Team Leaders, Volunteers $1,440.00
2.4
Development of
communication plan
7 days
Project Manager, Team
Leaders
$2,520.00

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
PROJECT MANAGEMENT
2.5 Team allocation 4 days Team Leaders $480.00
2.6
Milestone 2:
Completion of planning
phase
0 days $0.00
3 Project execution phase 48 days $40,120.00
3.1
Deployment of project
device
8 days Financial Manager $1,280.00
3.2
Development of project
prototype
8 days Project Manager $1,920.00
3.3
Testing of accounting
software
5 days System Designer $400.00
3.4
Database development
for accounts department
7 days
Business Consultant,
System Analyst, Hardware
[1]
$5,400.00
3.5
Database connection with
the device
8 days
Project Manager, Software
[1]
$6,920.00
3.6
Time testing device
response
7 days
Project Manager, System
analyst, System Designer
$3,080.00
3.7
Testing of database
system
7 days
Risk Manager, System
analyst, System Designer,
Additional cost [1]
$6,520.00
3.8
Real time data transfer
testing
5 days
Risk Manager, System
analyst, System Designer,
Team Leaders
$2,400.00
Document Page
8
PROJECT MANAGEMENT
3.9
Adding features with HR
department
7 days
Project Manager, Project
Scheduler, Risk Manager,
System Analyst, System
Designer, Team Leaders
$6,160.00
3.10 Software testing 8 days
Financial Manager, Risk
Manager, System Analyst
$3,520.00
3.11 Connectivity testing 7 days
Risk Manager, System
Analyst, System Designer
$2,520.00
3.12
Milestone 3:
Completion of execution
phase
0 days $0.00
4 Closing Phase 5 days $1,360.00
4.1
Sign off from the
stakeholders
3 days Project Manager $720.00
4.2 Review of entire project 2 days
Business Consultant,
Project Manager
$640.00
4.3
Milestone 4:
Completion of closure
phase
0 days $0.00
2.3 Table estimating annual operating costs
The table that is given below reflects on the annual cost that is needed for operating
the HRM system.
Recurring expenses Amount
Document Page
9
PROJECT MANAGEMENT
Server for the HRM system $7,000
License $5,000
Domain $4,000
Training $4,000
Total Costs $20,000
2.4 Cost benefit analysis
2.4.1 Anticipated benefits
The anticipated benefits are generally categorized into tangible benefits as well as
intangible benefits which are generally elaborated below:
Tangible benefits: The tangible benefits of the project are elaborated below:
Reduced cost of labour: It is found that with the development of HRM
system, the labour cost that is required for managing the organizational
resources reduces.
Increased benefits: It is found that the time with the human resource
management system, the work of the organization is properly managed which
helps in enhancing the yearly revenue of the organization, Globoforce.
Intangible benefits: The non-tangible benefits of the project are generally illustrated
below:
Improved feedback from the clients: With the human resource management
system, the clients of the organization will get proper and timely help from the
organization.
Improved satisfaction among the staffs: The staffs of the organization will get
happy with the new system as they do not need to face any type of issues related
to their salary or any other queries due to the development of HRM system.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10
PROJECT MANAGEMENT
2.4.2 Estimated annual benefits
The table which is provided below reflects on the annual benefits that are assumed
from the development of human resource management system.
Benefit or cost saving Amount
Reduction in the labour cost $45,000
Reduction cost in management $40,000
Enhanced benefit $50,000
Total $135,000
3. Perform risk and feasibility analysis
3.1 Determining organizational risks and feasibility
The organization Globoforce manages the human resource department of the
organization with the help of the manual system. However, in order to resolve the problems
as well as issues that are associated with the manual paper-based system, the organization is
developing human resource management system. In spite of the advantages, there are some
organizational issues that the few systems will face. The organizational risks are mainly
elaborated below:
Not familiar with the new system: It is found that the as the employees of the
organization are not familiar with the new system therefore they will face issues in operating
the new HRM system which can rise number of operational issues and challenges.
Fear of losing employment: It is found that the development of HRM system
generally affects the working time of the employees and therefore feel fear in losing
employment and therefore they create issues and wants to avoid the development of the HRM
system.
Document Page
11
PROJECT MANAGEMENT
3.2 Evaluating technological risks and feasibility
The technological risks and challenges that are related with the new system are
generally elaborated below:
Improper testing: Due to improper testing, number of technological challenges as
well as issues can occur which further can impact the working of the new system.
Not compatible with the existing system: It is found that the existing server of the
organization generally runs on the Centos OS and thus the new system will not be compatible
with the new servers.
3.3 Assessing resource risk and feasibility
It is found that the resource management generally plays a great role in managing the
project successfully. It is found that if the organization does not have sufficient resources
then it will create number of risks as well as challenges in the project. Some of the challenges
are elaborated below:
Improper skills and experience: It is found that due to improper skills and
experience, it become quite difficult to develop the human resource management system
within the expected budget and time.
IT managers are not available at necessary time of the project: The IT managers
are not available all the time and whenever necessary, their unavailability can cause delay
within the entire project.
3.4 Identification of schedule risks and feasibility
The development of schedule for the development of human resource management
system can generally create number of challenges and risks. It is found that if the schedule of
the project is not managed effectively then it will be quite problematic to finish the project
activities within the assumed time and budget. In order to resolve this issue, it is quite
Document Page
12
PROJECT MANAGEMENT
important to evaluate the status of the project for evaluating the project status on a weekly
basis in order to ensure that the entire project will be completed on time.
4. Establishing project environment
4.1 Table outlining information
The provided table mainly reflects on the the step of information capture.
Information capture Electronic tools User accessibility
Schedule MS-Project Project manager
Use case diagram Visio Project manager/Developers
Database SQL database Project Manager and team
members
Layout Visio All user
Report meetings MS-Word Team members
Sample reports Microsoft word Project manager
4.2 Description of the work environment
It is very much necessary to create proper work environment for making sure that the
team members of the project will capable of working properly. The table that is provided
below generally reflects on the work environment for the project that mainly includes
hardware, software as well as office tools.
Categories Items Description
Hardware Computers and laptop Running applications as
well as programmes
Office tools Microsoft word For writing reports

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
13
PROJECT MANAGEMENT
Test tools HTML validator Running the test cases
Communication tools Slack and skype Used for communicating to
the team members
Development tools MySQL software Storing database
4.3 Processes and procedures that are used
The procedures as well as processes that are generally used in the project are
generally elaborated below:
Reporting and documentation: All the steps and processes must be documented
properly so that they can be used for tracking the project. The project status reports are very
much helpful in making sure that the project will be finished in the expected time. Moreover,
the meetings are helpful in discussing the tasks that are required to be achieved in the project.
Testing: Testing is considered as important factor in order to validate the project
requirements of the project. It is found that for reducing the risks that are associated with
testing, it is quite necessary to undertake testing on a regular basis.
Deliverables: After finishing the work that is associated with testing, it is necessary
to distribute the release version within the IT department of the organization. The team
members must support the IT department in order to maintain the work that is associated with
the project. Thus, it is necessary to provide proper facility of training to the IT team
members. The deliverables of the project mainly include:
Human resource management system
Two major types of documentation including system as well as user documentation
Document Page
14
PROJECT MANAGEMENT
5. Scheduling of work
5.1 Work breakdown structure
Work breakdown structure is considered as one of the key deliverables that helps in
organizing the work of the team into number of manageable sections. It is found that work
breakdown structure visually defines the scope of the project into number of manageable
chunks that must be understood by the project team as each level of the work breakdown
structure should provide proper information in detail. The WBS of the project is given in the
table below:
WBS Task Name
0
Development of human resource management system for Globoforce
organization, Australia
1 Project initiation phase
1.1 Determining the business requirements
1.2 Development of project plan
1.3 Testing project feasibility
1.4 Milestone 1: Initiation phase completion
2 Project planning phase
2.1 Project tasks scheduling
2.2 Estimation of project resources
2.3 Resource allocation
2.4 Development of communication plan
2.5 Team allocation
2.6 Milestone 2: Completion of planning phase
3 Project execution phase
Document Page
15
PROJECT MANAGEMENT
3.1 Deployment of project device
3.2 Development of project prototype
3.3 Testing of accounting software
3.4 Database development for accounts department
3.5 Database connection with the device
3.6 Time testing device response
3.7 Testing of database system
3.8 Real time data transfer testing
3.9 Adding features with HR department
3.10 Software testing
3.11 Connectivity testing
3.12 Milestone 3: Completion of execution phase
4 Closing Phase
4.1 Sign off from the stakeholders
4.2 Review of entire project
4.3 Milestone 4: Completion of closure phase

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
16
PROJECT MANAGEMENT
5.2 Gantt chart
A Gantt chart is one of the horizontal bar charts that helps in providing a graphical
illustration of a schedule that generally assists in planning, coordinating as well as tracking a
specific task within a project. The Gantt chart for the HRM system development is provided
in the table below:
Figure 1: Gantt chart
(Source: Created by Author)
Document Page
17
PROJECT MANAGEMENT
Bibliography
Badewi, A. (2016). The impact of project management (PM) and benefits management (BM)
practices on project success: Towards developing a project benefits governance
framework. International Journal of Project Management, 34(4), 761-778.
Conforto, E. C., Amaral, D. C., da Silva, S. L., Di Felippo, A., & Kamikawachi, D. S. L.
(2016). The agility construct on project management theory. International Journal of
Project Management, 34(4), 660-674.
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., & de Almeida, L. F. M. (2014).
Can agile project management be adopted by industries other than software
development?. Project Management Journal, 45(3), 21-34.
Costantino, F., Di Gravio, G., & Nonino, F. (2015). Project selection in project portfolio
management: An artificial neural network model based on critical success
factors. International Journal of Project Management, 33(8), 1744-1754.
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute..
Hornstein, H. A. (2015). The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2),
291-298.
Joslin, R., & Müller, R. (2015). Relationships between a project management methodology
and project success in different project governance contexts. International Journal of
Project Management, 33(6), 1377-1392.
Document Page
18
PROJECT MANAGEMENT
Kaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management
beyond project selection techniques: Understanding the role of structural
alignment. International Journal of Project Management, 33(1), 126-139.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A. M. E., & Villanueva, P. (2014).
Project risk management methodology for small firms. International journal of
project management, 32(2), 327-340.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking
project management performance and project success. International journal of project
management, 32(2), 202-217.
Sánchez, M. A. (2015). Integrating sustainability issues into project management. Journal of
Cleaner Production, 96, 319-330.
Serra, C. E. M., & Kunc, M. (2015). Benefits realisation management and its influence on
project success and on the execution of business strategies. International Journal of
Project Management, 33(1), 53-66.
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D.
(2015). Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Too, E. G., & Weaver, P. (2014). The management of project management: A conceptual
framework for project governance. International Journal of Project
Management, 32(8), 1382-1394.