Executive Summary
This essay aims to describe and recommend the methods that are used for the monitoring and
controlling of the project. A case scenario is the base to which all of the discussions are related.
Kate Greenwood, the project manager from the ATA, is appointed as the project manager to a
project in East Timor. The issues that she faced initially are described following which the
methodologies are described in detail that are to be sued for the monitoring and controlling of the
project. Later, the essay consists of the methodologies that are to be used for the reporting of the
progress of the project both to the stakeholders and the CEO of ATA.

INTERNATIONAL PROJECT MANAGEMENT2
Table of Contents
Introduction......................................................................................................................................3
Aim of the essay..............................................................................................................................3
Discussion........................................................................................................................................4
Conclusion.......................................................................................................................................9
References......................................................................................................................................10

INTERNATIONAL PROJECT MANAGEMENT3
Introduction
Project governance is one of the important aspect of an entire process of project
management (Muller 2017). From starting with the planning and the cost estimation, when the
project is finally made to work then the vital part that has to be looked after carefully is the
governance of the project that is the progress of the project. All of the resources and labour
forces that are invested on the project needs to be monitored and it has to be assured that the
project is progressing with the expected output. The project manager is responsible to keep track
of all these functions of the project (Meng and Boyd 2017). This essay will discuss about such an
instance of project governance in a Southeast Asian country that is in East Timor. The most
critical part of this project is that the project manager of The ATA, Kate Greenwood, was
initially from the field of international development, hence it was an issue for her to
communicate freely within a complete technical environment. This essay will discuss that what
are the methods that she can use in order to make an effective monitoring of the project that is in
charge of. Moreover, the discussion will contain the methods for the presentation of the
information regarding the progress of the project to the stakeholders and the CEO of The ATA.
Aim of the essay
The aim of this essay are the following:
To provide recommendations for effective monitoring of the progress of the project that
would include the recommendations regarding the tracking of the cost and the schedule.
To provide recommendations on reporting of the progress of the project to the team of the
project.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
International Project Management: Solar Project in East Timor
|13
|2938
|287

Project Governance Plan Assignment
|6
|1413
|35

Project Management Name of University Author: PM 1 1PM Project Report Structure and Format
|12
|2734
|220

Project Report | International Project Management 2022
|12
|2784
|18

Management of Housing Projects
|10
|2786
|32

INTERNATIONAL PROJECT MANAGEMENT
|12
|2874
|18