logo

Latureae Information System | Assessment

   

Added on  2022-10-06

13 Pages3353 Words15 Views
Running head: LATUREAE INFORMATION SYSTEM
LATUREAE INFORMATION SYSTEM
Name of the Student:
Name of the University:
Author Note:

LATUREAE INFORMATION SYSTEM1
Table of Contents
Introduction................................................................................................................................2
Overview of agile implementation to Latureae and the Value chain and systems....................2
Value chain Primary Activities Sub Activities..........................................................................5
Recommendations from assessment-1.......................................................................................5
Recommended technology systems to support activities...........................................................6
Justification – Benefits...............................................................................................................8
Actual systems in the market place............................................................................................8
Conclusion..................................................................................................................................9
References................................................................................................................................10

LATUREAE INFORMATION SYSTEM2
Introduction
The report particularly presents the analysis of the Agile method implementation to
the Latureae and the Value chain and systems. The relation of the activities with that of the
sub activities have been reported with respect to the Value chain system. Latureae, is
commonly referred to as the health and wellness related organization aimed at bringing the
peak of healthy lives to every individual staying within the area they are working within. The
organization carries out all of its activities within varied regions of Australia having a strong
culture of customer engagement as well as education within the field of manufacturing and
distribution. The organization has the prime objective to provide intent care with the proper
utilization of resources at hand as well as provisioning the citizens with utmost care regarding
healthcare. However, the company specializes in minerals, nutrients, vitamin as well as herb
incorporating a natural and organic approach for the development of its processes. This
particular report has been prepared to analyze the Agile method implementation for the
Latureae management along with recommendations from the already existing system,
prevalently working.
Overview of agile implementation to Latureae and the Value chain and
systems
Agile methodology refers to the practice of promotion, which involves the continuous
iteration related development as well as testing throughout the cycle of software development
for the information system (Converso et al., 2015). Both the process of development as well
as testing of the activities are concurrently working, which is very much different from the
waterfall model. The method of Agile development consists of four core values. These are,
The interaction, which takes place individually as well as the interactions happening
over the various processes as well as tools.

LATUREAE INFORMATION SYSTEM3
The working out of software depending upon the comprehensive level of
documentation.
Collaboration of the customers related to the negotiation of the contract.
Responding to changes according to the following plan.
Agile is essentially referred to as a model, which contains the running of process groups
taking place in a followed up logical order happening within a defined period of time. With
the help of Agile project management, the learning of the process is entirely dependent upon
the work and not upon the entire thing which takes place as an outcome (Watson & Jackson,
2016). The principles related to the Agile methodology has taken further steps towards the
origins of delivering essential software to the information systems working within the
industry of healthcare sectors.
The method of Agile provisions practices as well as tools to all the leaders of
organizations working within the field of healthcare, such as the Latureae healthcare
organization. With the help of Agile, the organization has no necessary need to have an idea
about the entire working taking place from first to last (Špundak, 2014). The organization just
needs to have a brief idea about the process destination and what the system needs to perform
for the healthcare organization. Agile methodology for the development of the information
system provisions Latureae organization to understand the solutions, develop them, run a test
upon each one of them, make the necessary adjustments and continue moving forward
following an iterative manner till the time the process reaches the destination it was looking
forward to.
It is stated that, there exists a reasonable change of implementation, which can be
facilitated with the help of Agile methodology depending upon the factors of iterative
development, validation of the information system as well as adjusting of the process, which

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Foundation of Information System - Latureae Management
|9
|2316
|153

Tool For Reducing Information Asymmetry
|15
|3105
|19

Information Systems Paper 2022
|8
|2073
|22

Analysis of Enterprise Information System in Latureae Company
|13
|2995
|42

Foundation of Information System
|12
|3336
|262

Assignment On Foundation Of Information System
|10
|2207
|24