Running head: LEADING LEAN PROJECTS
Leading Lean Projects
Name of Student-
Name of University-
Author’s Note-

LEADING LEAN PROJECTS1
Table of Contents
1. Choosing processes of project management................................................................................1
1.1 Choosing Suburb...................................................................................................................1
1.2 Size of land to be bought.......................................................................................................1
1.3 Choosing a builder.................................................................................................................1
1.4 Identifying the stakeholders...................................................................................................2
2. Design, layout and project management processes.....................................................................3
2.1 Factors influencing design and layout...................................................................................3
2.2 Processes of project management..........................................................................................4
3. Implementing best lean practices for project management.........................................................4
References........................................................................................................................................7

LEADING LEAN PROJECTS2
1. Choosing processes of project management
1.1 Choosing Suburb
The region that has been selected for developing the house is Golden Bay. Golden Bay is
situated in the Rockingham city which is 15 minutes away to the north from Mandurah City
Centre. This region of suburb has easy access to the rail service from Perth. The Golden Bay has
popular cafes, entertainments, and also has shops. There are many number schools and colleges
and there is CIT (Challenger Institute of Technology) as well as includes Murdoch University
near the region. This region is the southern suburb situated in outer region of Perth. The
methodology that is chosen for the choosing a region in the suburb region of Perth is and
PMBOK methodology. The PMBOK method provides overview of all good practices that are
applicable for the projects. The PMBOK includes many combination skills, techniques as well as
tools, which helps in project successful rate (Chaves et al., 2016). With the PMBOK project
management methodology, integration can be managed properly and the scope of the project are
also managed properly.
1.2 Size of land to be bought
The land that is being chosen for developing this project is plot number 645 in the Jundee
lane. The location of the plot is on the beach side where there is a family park where picnic can
be enjoyed. The plot that is chosen for developing the 3BHK is in the Homesites situated in
Elvire Release. This plot is chosen close to the primary school and is also close to Comet Bay
College. There are many parks nearer to the plot and there is also built play boasting facilities,
picnic areas, and the BBQ and there are many places to relax. The cost of the plot that is decided
to be bought for the construction of 3BHK house costs $106,000. PMBOK methodology of
project management helps to manage the cost of buying the land for the project. The resources
and the investment of the project is actually needed to maintain the cost of the project. The
PMBOK process o project management also helps to maintain and increase the quality of the
project.
1.3 Choosing a builder
Before choosing the builder, it is needed to decide the type of house that is to be built on
the plot. As 3BHK is to be built on the plot of land that is selected, the house type is to be
decided that is it would be a custom built house, a town house, house for subdivision and many

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Leading Lean Project
|11
|3741
|88

Lean Project Management for House Construction in Ashfield
|11
|3836
|86

Leading Lean Projects: Implementing Lean Project Management for House Construction
|15
|3797
|399

Construction of Dream Home: Factors, Suburb, Builder, Stakeholders
|17
|4423
|462

Construction of a Home at Perth, Australia
|12
|4128
|189

Leading Lean Project Assignment 2022
|14
|3675
|9