Leading Lean Projects: Football World Cup of 2022 Qatar
Verified
Added on 2023/05/28
|12
|3207
|50
AI Summary
This report focuses on the design and arrangement of the prestigious FIFA World Cup Football tournament event, which is going to be held in Qatar. The report details the professional project management process and practices, critical stakeholders, and ways to implement lean project management.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: LEADING LEAN PROJECTS Leading Lean Projects: Football World cup of 2022 Qatar Name of the student: Name of the university:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1LEADING LEAN PROJECTS Table of Contents Introduction......................................................................................................................................3 1.0 Identification and elaboration of project management processes..............................................3 1.1 The process from PMBOK....................................................................................................3 1.2 The critical stakeholder of the event......................................................................................6 2. Ways to implement lean project management.............................................................................7 2.1 Identify as well as elaborate process.....................................................................................8 Conclusion.....................................................................................................................................10 References......................................................................................................................................12
2LEADING LEAN PROJECTS Introduction This specific report is focused on design and arrangement of the prestigious FIFA World Cup Football tournament event, which is going to be held in Qatar. According to a press around allegation it is recognized that Qatar may lose the position of world Cup event host due to bad weather condition. Qatar itself has also responded in this allegation. As the football committee of Qatar itself is interested to play the role of host therefore, thus they planned to dismantle the parts of football stadium to other developing countries for constructing new stadium. Thisreport demonstratesthe footballworld cup arrangementproject detailingthe professional project management process and practices. Apart from this, the process of PMBOK or Prince2 that would help to manage the project stakeholders is considered in this paper. In addition to this, a critical stakeholder for the event is also illustrated in the below section. For this project the ways through which the lean project management will be implemented are also elaborated here including the areas as well as opportunities where the waste of the projects can be eliminated.Theprocessesfrom OrganizationalProjectManagement(OPM), PMBOK, Prince2, Lean Six Sigma, and Agile Practices are individually considered to implement the lean project management. 1.0 Identification and elaboration of project management processes 1.1 The process from PMBOK In order to manage all the assigned stakeholders of World Cup 2022 event management project the processes either from PMBOK or Prince2 are required to be considered. According to Bodily, Nyland and Wiley (2017) the stakeholder management process helps to identify the groups, people and organization as well. These elements can be impacted by the project and at the same time the project can also be impacted both positively and negatively by these components. The major processes associated to PMBOK stakeholder management process include stakeholder identification, stakeholder management plan, and stakeholder engagement plan and control the stakeholder engagement.
3LEADING LEAN PROJECTS According to PMBOK stakeholder management process there are some stakeholders who impact the project positively but some impact negatively also. At the same time it is also true that, some of the stakeholders have much power and influence that the rest of the stakeholders. However, the success and failure of any project is dependent on how the project managers are playing the assigned roles and maintaining relationship along with stakeholders Some activities areenlistedinthebelowsectionthoseneedstomaintainedformanagingtheproject stakeholders.InordertoaccomplishthestakeholdermanagementinFIFAWorldCup tournament arrangement project in Qatar, 2022 the steps must be followed are as follows: Identification of the potential stakeholders Accessing the influence, interest and capability of each of the assigned project stakeholders Understanding the requirement and expectation of assigned project stakeholders Developingprofessionalprojectmanagementstrategiesforthedifferent stakeholders Continuous communication along with the stakeholders Identification of the stakeholders: It is the very initial phase of project stakeholder management. In this step, people as well as organizations that might be impacted by the project are determined considering their interest and involvement. In order to maximize the positive influence and minimizing the negative influence the project manager needs to devise the strategies initially. The relative importances of the stakeholders are needed to be prioritized by the project managers. This must be done based because of time limitation of the project managers and large numbers of stakeholders. The three components of stakeholder identification areinputs,outputsandtools.Projectcharter,organizationalprocessasset,procurement documentation and enterprise environmental factors are the inputs for managing stakeholders. The tools that are used for designing the stakeholder register include stakeholder analysis, judgment from the experts and meeting. Stakeholder management plan:In this phase the assigned stakeholders are assigned to respective job roles and responsibilities. Then it becomes their responsibilities to accomplish the
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4LEADING LEAN PROJECTS assigned role within the allotted time phase and budget. Different analytical techniques are applied for managing the stakeholders. Though, in order to gain positive influence from the stakeholders it is very much important to give them equal priorities. The stakeholder register which defines their roles and responsibilities include their designation, assessment and the classifications. Apart from this the other thing that has to be considered by the project manager and the project team members for implementing the FIFA World Cup project are improved communication approach. The stakeholders need to use open communication instead of upward and downward communication while interacting with the rest of the project team members. It will help the project members.With the help of open communication the stakeholders will be able to share their ideas and point of creativity with the rest of the project team associate. Managementofstakeholderengagement:Afterimplementingthestrategiesfor managing the stakeholder the other thing which is required to be considered by the project team members and manager include stakeholder engagement. According to this phase the project head needs to implement different effective approaches through which the stakeholders will be interestedtokeepthemselvesengagedtotheirassignedrolesandresponsibilities. Communication method, interpersonal skill is and the management skills are the tools that are widely used by the project managers to get Organizational project management updates, issues log, change requests, updated project management plan etc. Apart from this the other approaches that will also help the project manager to keep the stakeholders engaged include reward, additional award etc. trust, conflict resolution capabilities, active listening are the interpersonal skills that helps the project managers to motivate the stakeholders to become more engaged to the project objectives and goals. Control stakeholder engagement:Control stakeholder engagement is referred to as the process that helps to monitor the relationship between the stakeholders by adjusting the necessary strategies. The inputs to stakeholder control approach are project management plan, issue log, work performance data and project documentation. The tools that are used for controlling the stakeholders of the project include information management, judgments from the stakeholders and meeting. The outputs that are successfully generated include work performance information, change request, updated projectmanagementplan and organizationalproject management updates. The updated project plan covers different project knowledge areas in terms
5LEADING LEAN PROJECTS of cost, scope, communication, change management, human resource, quality management, risk and procurement management etc. 1.2 The critical stakeholder of the event The stakeholder committee is responsible to advise as well as assist the council on each matter that is related to the football tournament. They are also responsible to manage the relationship among the clubs, leagues, players, associations, confederation and FIFA. In order to design and implement the Football Tournament event 2022 in Qatar the assigned stakeholders and stakeholder committee are as follows: Chairman Deputy Chairperson 1 Deputy Chairperson 1 Standingcommitteeincludingthegovernancecommittee,reviewcommittee, organization committee, medical committee, players status committee and referee committee. All the associate members are required to accomplish their assigned job roles within the time phase and budget so that they can meet the project objectives and goals. For organizing a world class and prestigious world class event the details that has been planned in detailed in the below section. 2. Ways to implement lean project management After analyzing the project management prcatices it is defined that most of the projects are focused on lean principles. It can be said that all the issues associated to project can be completely resolved with the implementation of the lean project management approaches. There are different lean practices on which the project managers needs to focus for successful project implementation. The lean projects principle that are aligned to the project success include Focus to the consumers Elimination of waste It is all regarding the associate people
6LEADING LEAN PROJECTS The lean project management practice can implement the project with a minimum rate of labour, space, material and equipments. It means that the additional or unwanted cost that may hamper or interrupt the success of the project get eliminated with the implementation of lean project practice. The core five ways through which the waste can be eliminated from the project are also elaborated. There are numbers of overabundance of waste in project management and these wastes should be eliminated to avoid over running budget and over allocation of cost. Firstly, the wastes are needed to be identified by the project manager considering the support of the other project team members. The climate of Qatar is not giving a supportive playing environment to the FIFA committee. However, change in the climatic condition of Qatar is not possible. The rest of the issues that are identified in the project are over allocated cost, internal committee conflict, improper time management etc. These issues are required to be eliminated from the project perspectives and the respective steps are elaborated in the below section: Specification of values from the consumer perspectives: This is the first lean principle which specifies the values of the project and its associates. The value of service or product is referred to as an ability that is provided to the consumers on correct time with an accurate price range which is defined by the consumers. In this case the term value is completely related to the consumers demand. Identification of value stream:In this phase a project improvement plan in required to be implemented ensuring the wastes are all eliminated allowing the process improvement. Making value flow:The value stream are needed to be analyzed considering the value addedwork,valueenablingworkandthenonvalueaddedworkanalysis.Purewaste managementdeliversoverproduction,successfulinventorymanagement,projectmotion management and defect repairing. It gives the high level opportunities to the consumers. In fact the common causes of project failure are also gets resolved with this approach. 3.Process identification There are different processes through which lean projects can be successfully designed and implemented. The following are the lean management processes: PMBOK
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7LEADING LEAN PROJECTS The PMBOK method is a combination of five separate processes including project initiation, planning, execution, control and monitoring and project closure. Each of these phase are required to be followed sequentially by the project team members while governing the project towards the specified goals and objectives. Each of these phase are interrelated to each other therefore, not a single phase should be overlooked. PRINCE2 The Prince2 method is comprises of 7 different processes. The method starts with formation of a project board, assigning project executives to it, designing the project team members, preparing brief for the project, defining business case and implementing project stages. Lean Six Sigma (DMAIC Methodology) The lean six sigma project management approach is comprises of five phases such as: Define: In this phase the project problem are defined Measure: The identified problems are then measured Analyzed: Then the measured issues are analyzed Improve:Properimprovementstrategiesaretobedevelopedandimplemented accordingly to control the situation Control: The improvements are static or not should be controlled in this phase OPM The Organization project management (OPM) is comprises of two different segments such as implementation of OPM and development of strategy. This is also known as a strategy execution framework. The process of OPM is always aligned to business goals and to the total invested capital amount. With the application of this approach also lean projects can be implemented. Agile process
8LEADING LEAN PROJECTS The Agile project management method is comprises of different processes and those collectively produce the project goals and aim. The steps to be followed in order to implement the lean project are as follows: Prioritization of project Visual presentation for requirement of the project Final project constructions Project implementation Conclusion From the overall discussion it can be concluded that stakeholder engagement and stakeholder management are the two different management approaches which helps to improve the commercial, economical revenue of the project. Appropriate stakeholder management devise alsoprovidescompetitiveadvantagestotheprojectmanagersandtheconsumers.Itis determined that engaging to the perspectives gives high learning opportunities for both learning andchangingtheprojectmanagerialapproaches.Theorganizationwhichisundertaking professional project management prcatices to their operational and functional activities will be able to make effective decision for the overall project success. Stakeholder management saves time and reduces the invested capital. It can built a trustworthy relationship between the project associates which improves the overall quality and productivity of the project. Apart from this it also gives risk management strategies to the project stakeholders. The project accountability also increases with the increasing engagement of the stakeholders to the project. The project nominated for this report is World class event planning for FIFA 2022 World Cup football tournament. The Qatar football committee has taken the responsibility for arranging the football tournament on 2022. From the climatic report it is identified that in the month of June and July the weather of Qatar is not at all suitable for the football tournament Thus, in order to give enough comfort to al the FIFA associates they have planned to improve the quality of the football stadium. The parts of the stadium are sending to different advanced countries for the overall improvement of the stadium. The Process of PMBOK that would help to engage the stakeholder to the FIFA project is elaborated in this report. Apart from this, the critical stakeholder management for this specific event is also elaborated in this report. Besides this, in
9LEADING LEAN PROJECTS order to implement the lean project management for this specific event the opportunities and the area of identification are also illustrated in this report. The processes of PMBOK that can be use for implementing the lean project management are also illustrated in this paper. It is assumed that of proper budget, time and project scope are maintained then the project will surely meet the objectives and project goals.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10LEADING LEAN PROJECTS References Albliwi, S., Antony, J., Abdul Halim Lim, S., & van der Wiele, T. (2014). Critical failure factors of Lean Six Sigma: a systematic literature review.International Journal of Quality & Reliability Management,31(9), 1012-1030. Bodily, R., Nyland, R., & Wiley, D. (2017). The RISE Framework: Using Learning Analytics to Automatically Identify Open Educational Resources for Continuous Improvement.The International Review of Research in Open and Distributed Learning,18(2). Cohen-Vogel, L., Tichnor-Wagner, A., Allen, D., Harrison, C., Kainz, K., Socol, A. R., & Wang, Q. (2015). Implementing educational innovations at scale: Transforming researchers into continuous improvement scientists.Educational Policy,29(1), 257-277. Conger, S. (2015). Six sigma and business process management. InHandbook on Business Process Management 1(pp. 127-146). Springer, Berlin, Heidelberg. First, M. B. (2016). Adopting a continuous improvement model for future DSM revisions.World Psychiatry,15(3), 223-224. Goetsch, D. L., & Davis, S. B. (2014).Quality management for organizational excellence. Upper Saddle River, NJ: pearson. Goldratt, E. M., & Cox, J. (2016).The goal: a process of ongoing improvement. Routledge. Hambach,J.,Tenberg,R.,&Metternich,J.(2015).Guideline-basedvideoanalysisof competencies for a target-oriented continuous improvement process.Procedia CIRP,32, 25-30. Hegade, A., Rajkumar, S., & Murthy, S. (2017). Standardization of Continuous Improvement Process. Heinemann, B., Ceauau, I., Buchmüller, M., & Kopia, J. (2017). Quality Management System Certification and the Continuous Improvement Process by the Example of a Training Company in Germany.Calitatea,18(156), 97.
11LEADING LEAN PROJECTS Hutchins,D.(2016).HoshinKanri:thestrategicapproachtocontinuousimprovement. Routledge. Indrawati, S., & Ridwansyah, M. (2015). Manufacturing continuous improvement using lean six sigma: An iron ores industry case application.Procedia Manufacturing,4, 528-534. Ivey, M., Dew, S., Mandal, M., Mohamed, Y., Nychka, J. A., Raboud, D., & Carey, J. P. (2017). USING POST COURSE ASSESSMENTS TO INVOLVE INSTRUCTORS IN THE CONTINUOUSIMPROVEMENTPROCESS.ProceedingsoftheCanadian Engineering Education Association (CEEA). Jacobs, B. W., Swink, M., & Linderman, K. (2015). Performance effects of early and late Six Sigma adoptions.Journal of Operations Management,36, 244-257. Nachiappan, R. M., & Muthukumar, N. (2016). Continuous Improvement in Energy Efficiency– A Case Study at Automotive Component Manufacturing Processes. Singh, J., & Singh, H. (2015). Continuous improvement philosophy–literature review and directions.Benchmarking: An International Journal,22(1), 75-119.