Managing Project Time

   

Added on  2023-04-25

6 Pages1175 Words496 Views
Running head: MANAGING PROJECT TIME
Managing Project Time
Name of the Student
Name of the University
Author Note:
Managing Project Time_1
1MANAGING PROJECT TIME
Answer 1
Construction organization like Greenhouse needs to make up a formal plan for the
project. In this the required project is divided into required number of units. Project management
tools is needed for divided the required project into small units that is work breakdown
structure(Kerzner and Kerzner 2017). The WBS of this project is prepared as per the needs to the
project. It is prepared in the beginning phase of the project. WBS for Greenhouse Construction
organization aims to provide details related to activity and description of task. It helps in
providing proper framework of the project, multi-level and work breakdown structure.
Answer 2
The most significant part of completing the project is all about successful completing of
the project. It is needed for completing the required project which is achieved by completing
each and very small task. In similar way, the task implementation can be achieved in similar way
(Fleming and Koppelman 2016). For achieving the overall objectives of the project, various
parameters like effort, dependency and duration should be taken into account. It can be achieved
by making use of Gantt chart which is prepared by making use of Gantt chart. There are large
number of scheduling tool which is needed by this greenhouse construction organization for
completing this project.
Answer 3
Greenhouse construction organization can make use of project scheduling tools which is
needed for controlling the whole project. It is needed for identifying the overall schedule impact
of the project. The schedule of this project is analyzed by the help of project cost along with
Managing Project Time_2
2MANAGING PROJECT TIME
changes in the baseline (Walker 2015). Project scheduling is considered to be helpful in
understanding the impact and Gantt chart of this project.
Answer 4
With respect to this construction organization, the schedule baseline of this project plan
which cannot be changed further. The baseline of this project is mainly agreed by the
stakeholders prior to the beginning phase of the project (Heagney 2016). Proper communication
can be implemented with the baseline of the project which that is Greenhouse Construction
Organization. It mainly makes use of certain number of ways for establishing connection with
the team through, email, conference and lastly updates of status on regular basis.
Answer 5
In the implementation of the project, it is very much important for understanding the
recording, schedule which is taken by this Greenhouse construction organization. It is all about
implementation of proper schedule for this project so that the given work can be complete in the
given time (Turner 2016). The schedule of this project can be used for keeping a track and record
of the amount of work complete along with work left to be competed. The progress of the report
can be communicated by the help of email and conference.
Answer 6
The baseline of this project is considered to be an important factor for understanding the
overall progress of this particular project. Greenhouse Construction Organization aims to set up a
proper baseline of the project by the help of scheduling tools. It is mainly needed for
understanding the baseline variance of this construction organization (Binder 2016). The whole
Managing Project Time_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management for Greenhouse Construction Organization
|12
|2105
|112

Assignment on Project Time Management - Desklib
|14
|1750
|80

Project Planning and Completion: Tools, Budget Template, Closure and Balanced Scorecard
|7
|897
|153

Project Management: WBS, Gantt Chart, Scheduling Planning, Time Management Techniques
|9
|1299
|365

PPMP20009 Leading Lean Projects - Work Breakdown Structure
|2
|469
|113

Construction Site Management - WBS, Project Schedule, Safe Work Method Statement
|8
|611
|381