This report discusses the key characteristics of a project, the importance of integration management, scope statement, budget generating approaches, and types of risk in project management. It also covers quality control methods and the project life cycle.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Managing Projects 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents INTRODUTION..............................................................................................................................3 TASK 1............................................................................................................................................3 Key Characteristics of Project.....................................................................................................3 Importance of Integration management in Project management.....................................................4 Scope Statement of Project..........................................................................................................4 Budget Generating Approaches in Project Management.............................................................4 Types of Risk in Project..............................................................................................................5 TASK 2............................................................................................................................................5 CONCLUSION..............................................................................................................................14 REFERENCES..............................................................................................................................15 2
INTRODUTION Project management is considered as the practice of leading the operation of a team in order to achieve the goals and meet success criterion with in specified time period. The main object project management activity if to achieve all the needs and goals of the project with all the requirements. Project management is considered as the actions that are performed by the organization to manage various tasks in effective mannerKerzner, 2017). This report is providing key characteristics of any project in an organization. The importance of integration management in the project management setting. The scope statement for the project will be defined in the report. The role of the work breakdown structure also will be explained in the report. Various approaches of generating budget of project will be discussed in the report. Different type of risk in project and methods to reduce the risk with in the project will be analysed in the report. Quality management methods that can be used in the project will be discussed in report. Complete project management process will be defined in the report. TASK 1 Key Characteristics of Project There are different characteristics of any project that runs in a business organization. some of the main characteristics of the projects are- Temporary, unique deliverables and progressive. These are considered as key characteristics of the projects that are implemented in different organization to meet the goals and needs of the organization in effective manner. Temporary- Each project have definite initial starting and definite end. Each project have finite starting and finite end. The reason behind is related to the aim and objective of the organization. As these projects are based on the targets of the organization(Meredith, Shafer and Mantel Jr, 2017). The main purpose of the projects in the business organisation is to implement positive implementations in the organizations to generate higher benefits from the market place. These projects are based on the various targets of the organization and designed to meet these targets in effective manner. Unique Deliverable- These projects are designed to deliver something unique to the organization through these processes organization can offer unique qualities or features to the organization that can help the company to gain higher profitability and higher benefits to them in market place. The objectives of the projects are based on the needs and requirement of the organization. 3
Progressive Elaboration- The projects that are run by the organization are progressive and continuous. This projects are continuous implementation or reaching process that can improve the knowledge and data base of the organization. This is how progressiveness of the project to improve the effectiveness of the organization in the business operations. Importance of Integration management in Project management Integration management is considered as the process to combine all the tasks that are part of the project. This is all about the right coordination of all activities in order to complete the project with right process. Integration management includes various activities like coordination of task, resource management, stakeholder management along with the other elements of the project that is implemented by the business organization. This process also includes the conflict management in the process of the project management. This is how integration management process can be used by the business organization to complete various processes in effective manner. Project integration management can be explained as effective coordination of all activities in effective way to meet the targets and objectives of the organization in effective manner(Heagney, 2016). Because of the success of the project integration is most crucial element of the project management process. Scope Statement of Project Scope statement of the project is considered as tool that is used by the management department of the organization which is included in the project management to describe all the major deliverables that are considered in the project. This is how in project scope statement project leader specifies the major targets and their impact on the business organization. Though this purpose requirement and importance of the project can be stated more clearly. Budget Generating Approaches in Project Management There are different project management approaches are used by the project management team in order to complete the project in effective manner. Budget management processes allows the organization or project team to collect or rise monetary resources. Some of the most common processes that are used by the project team are- Crowd Funding, silent auction, angel investor or capital of the organization. These are most common processes that are used by the business organization or project teas to effectively generate the budget for the project. In the budget generating process all the elements of the projects and various expenses in the project are 4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
considered by the organization to develop better budge for the project. Effective budget planning can reduce the risk of over costing project and it can make project more cost effective. Types of Risk in Project In a project there is different type of risk is there that can affect the effectiveness of the project that can cause more cost to the organization or project. Sometimes project can cause some extra cost or failure due to the risks that are present in the project. Some major risks that are included in the project are- Resource management risk, Program management Risk, Poor Time Management and Work Management. These are major risk that are faced in the resource management process. to solve these risks project management team can use various tools like Gantt chart, work breakdown structure, ERP System and process management tools can be used by the organization to complete the project in effective way(Kerzner, 2019). These approaches can be used by the organization to reduce the level of risk in the project management process. Quality Control method In theprojectmanagementprocesstherearedifferentprocessesareusedby the organization and project management team to provide better result form the project. some of the processes that are used by the business organization in the quality management for the processes are- Control chart process, Pareto Chart, Histogram and Scatter Diagram are used by the project management team to manage the quality in the project management team. In the project success, it is mainly used quality control method that always support for identifying the strength of project. Quality control method can help for reducing the price by increasing the efficiency, standardization and overall working conditions. Itenabledforexaminedtheadvanceproductservice,whichhelpforidentifying competitive price of project. 5
Gantt Chart TASK 2 Introduction It is often necessary for performing the competitive tendering process. The organization ofProject- Xperts-20 (PX20) has been decided to give contract of refurbish the library, all lecture theatres and other classrooms from ground floor to second floor of University of Sunderland London Campus. Before developing project, it will be required the planning for gathering or collecting necessary resources, equipment’s which always supports for successfully achieving specific objective. The purpose this project is to build the overall model of project so that it can easily identify the requirement of users. In order to change the habits of person because modern technology give a more preference to refurbish the overall layout, structure of classrooms (Lateef, Khamidi and Idrus, 2010). This will help for maintaining all facilities and services in proper manner. In another way, the aim is to enhance the profitability and enrich the reputation of campus, research process for student, facility in the term of new information age. Back ground The library, classrooms with long history and grand building which mainly representing as construction symbol of University of Sunderland in London. However, it does not require to cope with change of information retrieval habit in model world but it always maintain the better 6
cultural environment (Den Heijer, 2011). Afterwards, it provide the best quality of classroom facilities.Sometimes,ithasfoundthatuser-friendlyenvironmentmaintainedbecauseof incapability of supply which enough computing workstation, multimedia tools and other type of socialize features. The University of Sunderland in London has been decided to develop project which help for resolving issues or problem (Lloyd-Walker and Walker, 2015). But require for hiring the best project manager by human resource department that can easily calculate the essential resources, equipment’s which easily complete project on time. Constraints There are common constraints listed as following manner. There large amount of monetary donation which might not enough for entire project. In this way, the board of University of Sunderland has offered £8million and supports in term of financial ways (Gökgür, 2015). As per requirement the nature of renovation work which require 6- month might not enough to complete the project. The project must be successfully completed within 2- years. The project proposal must be take into consideration that there will be no classes running and entire building is vacant if project work is going on (Lloyd-Walker and Walker, 2015). The multiple new workstation that will be recommend by project manager to use modern technology to give better option during classes, lecture. The project manager is responsible for starting to end point and give a right contact of their clients. If it required (Jaselskis and et.al., 2011). In this project, it involved different members such as technical staff in the department of university. It can be performed the different task and complete on time. It make them unavailable to fulfill their duties in this project. Contingencies and risks RiskProbabilityImpactContingency Priceestimation becomeunrealistic manner. LowLowIt is planning the overall budget of project which mainly including in plan. On regular basis,itcanreviewtomakesuitable 7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
adjustment as enter new details about the scope (Lloyd-Walker and Walker, 2015). Timelineestimates withinunrealistic manner. MediumHighIt can be reviewed the timeline by project manager,steeringcommitteetoprevent through undetected timeline. Poorworking relationshipwith other team members MediumMediumProject manager has made up comprehensive communication plan. In order to maintain the coordination between team members (Lloyd- Walker and Walker, 2015). Table: 1 8
Project life cycle of Sun-Project 20X20 In this project, manager is responsible for performing different phases which help for identifying the need or requirement in project completion. Project manager, team have shared one primary goal which carried out the work of project and purpose to meet the target. Every project has a beginning and move towards completion stage effectively and efficiently. A standard project usually has consists of four different phases such as initiation, planning, implementing, designing, monitoring and closing (Kachoka andlHoskins, 2017). These phases are representing the path of project which takes from beginning to end. In order to refer as the project life cycle. Initiation phase: it is starting phase which mainly identifying the specific need and requirements.Thiswillhelpformaintainingproblemandalsoincreasinggreater opportunities. Project manager is responsible for identifying different certain space needs for establishing proper setup (Lateef, Khamidi and Idrus, 2010). Once the recommended solution approved and deliver the other team members. Afterwards, it will be start the processes. Planning Phase: it is another phase when manager has made a plan and created outlining activities, dependencies, task and other timeframes. Manager is coordinated with entire preparation of budget by cost estimating tool (Kasprza, Rameshand Dubler, 2013). In order to monitor and control the expenditures at the time of project implementation. Implementation: it is another important phase which mainly consider project plan and performed different action. It continuously monitored the progress and also recorded the variances from its original plan. The project manager can use the information to maintain and control over the direction (Kasprza, Rameshand Dubler, 2013). It may be include installation of new 20 workstations on second floor but 5 new workstation to complement exitingforsearchinglibrary.Itcanbepossiblewhenimplementingtheprocess effectively and efficiently Designing: this process will help for representing the structure, design and layout of renovation. In this way, it become easier for project manager to review design structure. Sometimes, it can be used as brief idea where how different activities performed in proper manner (Mitropoulos and Howell, 2012). The designing phase is important for manager to manage the entire project. 9
Closing: it is final phase when closing the project, it also emphases on releasing the final deliverabletocustomers.Inordertohandleoverprojectthroughwell-manner documentation. The report may consists of supplier contracts and also releasing project resources,equipment’s.Afterwards,inthisprocesscommunicatingwithother stakeholders (Mitropoulos and Howell, 2012). It is to be conducted the learned studies, examine the overall performance of project in proper manner. Primary Stakeholders The board of member such as Governors: it can be performed the task to maintain all facilities and services that provided after project completion. It plays important role which have strongest influence or interest on the project (Lateef, Khamidi and Idrus, 2010). University of Sunderland Committee: In this project, it is mainly providing the better idea and advisory suggestion for project manager when they can setup specific principles, expectation for completing the project in proper manner. Refurbish project steering Committee: This committee has directly influence on the project while creating the proper guideline, rules that have to go through members (Lloyd-Walker and Walker, 2015). The major decision have been taken by team members which providing the direction and assistance to project manager. Student union and other faculty members: these are performing the different task whereas giving the opinion, voice from other users (Rwelamila and Purushottam, 2016). These are directly influenced by result or outcome of project. In another way, it is mainly involved in the planning or conducting activities of project. Secondary Stakeholders The secondary stakeholders while not having a direct vested interest in the project. They are only directly or indirectly impacted by project. Primary student and users of project: The primary users of project which always influencing through result or outcome of project. Sometimes, it may involve with constructionaswellasplanningprocess(RwelamilaandPurushottam,2016). Sometimes, it is also represented by student and other faculty representative. Staff members who will not properly involved in project: The working environment of team member which always influenced by other construction of project (Mitropoulos and 10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Howell, 2012). In order to support for staff and providing the best services so that they can easily monitor the project running condition. Project structure Figure1 In figure-1, it is mainly representing the entire project where each and every stakeholder performed the specific task in proper manner (Lloyd-Walker and Walker, 2015). Project manager has assigned the role of team member on the basis of their skill or knowledge which help for maintaining and controlling entire project in proper manner. The project manager has used the teamwork software that help for performing different task in step by step manner. Roles, responsibilities, Accountabilities and authorities Project manager: It is responsible person for controlling and managing the entire project in proper manner. In order to establish the coordination with other team members and assign specific task in proper manner. Manage the project which taking into the account and integrate with different areas. Manage or control the resources, equipment’s which directly used in the task execution in proper manner. 11
Manage as well as monitor the entire project schedule, risk and budget. In this way, it can easily pre-defined the specific requirement in project completion (Lloyd-Walker and Walker, 2015). Establish the interaction with other stakeholders, team members and other parties that mainly involved in the project. In this way, it can easily checking the current status. Conducting the steering committee meeting and handle the current status of project. Managing entire team and look after on the basis of interest. Steering Committee It provide the better guidance on the behalf of strategic direction in term of renovation project. Sometimes, it has been approved major funding and other resource allocation techniques. In this way, it can easily signifying the changes to funding and maintain the proper resources (Mitropoulos and Howell, 2012). This steering committee will help for project execution while developing policies on communication, construction progressing and other review entire project in proper manner. It is helping for spread strategic input while buying to larger portion of Scotland University. The committee give the better direction to manage entire project in proper manner. It also reviewed the project deliverables. Budget planning director It also establishing the collaboration with project manager and also maintain the budget allocations. In order to make budget planning (Mitropoulos and Howell, 2012). It help to report through steering committee members. Construction team It may conduct the qualified construction which mainly prescribed in the contract of client. The team members must aware about the schedule timeline and finish the construction delivered the requirement on the basis of project planning (Rwelamila and Purushottam, 2016). 12
It has been established the communication with other steering committee as well as project manager. Design and technology consultant It is representing the entire floor design so that it become easier for managing entire project.Sometimes,theadvisorycommitteegiveafeedbacktochangeasper requirements (Mitropoulos and Howell, 2012). Project manager is communicate with design consultant to find out the design patterns, structure and layout within project. In this way, it help for giving the idea where how they will acquire the raw materials. Project success Satisfying the user’s requirement or need of network, hardware and software needs. Itisalsomaintainedthegroupdiscussionwithteammembersandmaintainthe collaborative task in proper manner. Designing and developing suits the information or data which retrieving habits of users in modern technology (Lloyd-Walker and Walker, 2015). Encouraging to project manager when they will adapt the new design and structure of classrooms, libraries, and lecture halls. Resolve issues through renovations of project The issues or problem about the project that will have to increased week before start of project steps. In order to tackle the critical issue or problem in proper manner. Project manager will resolve the issue when making well-documentation as changing, which impact on the project. It involves staffing, spending as well as staffing (Lundström, Savolainen and Kostiainen, 2016). Afterwards, it will be reviewing the issues and identify the associated impact to the project. Sometimes, it is forwarding the problem along with proper recommendation through committee who always monitor, review the project in proper manner. The steering committee will describe the current issues and also trying to find out the specific opinion or view point. Whether it will require to take approve, modify and reject on the basis of information (Mitropoulos and Howell, 2012). Project management is mainly including the better quality of approach which always supports for completed in project without any distraction. 13
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
CONCLUSION From above discussion, Project management is consider as practice that mainly uses for developing project. In this way, it is providing the facilities for managing entire project creation operation with the help of team members. The project has summarised the different management activities. In order to achieve all the needs and goals of the project with all the requirements. In this project, it has performed the action by different stakeholder which are participating to manage or control various tasks in effective manner. This report is concluding the importance of the project management processes that are used by the business organization in the management of various project that are rum by them to improve the performance of the organization in the target market. Various risks that are associated in the projects. Different risk factors in the projects and process to avoid them are also presented in the report. Case study related to the project management is also studied in the report. 14
REFERENCES Book and Journals Den Heijer, A.C., 2011.Managing the University Campus: Information to support real estate decisions. Eburon Uitgeverij BV. Gökgür, A., 2015.Current and future use of BIM in renovation projects(Master's thesis). Heagney, J., 2016.Fundamentals of project management. Amacom. Jaselskis, E. and et.al., 2011. Innovation in construction engineering education using two applicationsofinternet-basedinformationtechnologytoprovidereal-timeproject observations.Journal of construction engineering and management.137(10). pp.829- 835. Kachoka, N. and Hoskins, R., 2017. Using project management strategy to evaluate the challenges of managing a renovation project at the chancellor college library, university of Malawi.African Journal of Library, Archives & Information Science.27(2). pp.189- 200. Kasprzak, C., Ramesh, A. and Dubler, C., 2013. Developing standards to assess the quality of BIM criteria for facilities management. InAEI 2013: Building Solutions for Architectural Engineering(pp. 680-690). 15
Kerzner, H., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Kerzner, H., 2019.Using the project management maturity model: strategic planning for project management. John Wiley & Sons. Lateef, O.A., Khamidi, M.F. and Idrus, A., 2010. Building maintenance management in a Malaysian university campus: a case study.Construction Economics and Building.10(1- 2). pp.76-89. Lloyd-Walker, B. and Walker, D., 2015, April. Collaborative project procurement arrangements. Project Management Institute. Lundström, A., Savolainen, J. and Kostiainen, E., 2016. Case study: developing campus spaces through co-creation.Architectural Engineering and Design Management.12(6). pp.409- 426. Meredith, J.R., Shafer, S.M. and Mantel Jr, S.J., 2017.Project management: A strategic managerial approach. John Wiley & Sons. Mitropoulos, P. and Howell, G.A., 2002. Renovation projects: Design process problems and improvement mechanisms.Journal of Management in Engineering.18(4). pp.179-185. Rwelamila, P.M.D. and Purushottam, N., 2016. Strategic project management as an innovative approach for sustainable green campus buildings in Africa.Smart and Sustainable Built Environment. 16