This assignment delves into six pressing challenges faced by three different projects (MNO, ABC, XYZ). These issues range from high to low priority and span various aspects such as supplier performance, workplace safety, team synchronization, stakeholder communication, cost estimation accuracy, and technical research allocation. Each challenge requires specific attention and strategic planning to mitigate its impact on project progress.