Computer Based System for High School Training and Apprenticeship Program | Desklib

Verified

Added on  2023/04/25

|29
|5455
|51
AI Summary
This document discusses the development of a computer-based system for Training and Apprenticeship program for High School students. It includes the scope, WBS, resource assignments, and estimates for each activity/task. The document type is Project Management, and the type of assignment is High School Training and Apprenticeship Program. The subject is Computer Science, and the course code is CS101. The course name and college/university are not mentioned.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: PROJECT MANAGEMENT
Computer based system for Training and Apprenticeship program for High School students
Name of the Student:
Name of the University:

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1PROJECT MANAGEMENT
Table of Contents
Part One:.....................................................................................................................................3
1.1 MOV - Measurable Organisational Value.......................................................................3
1.2 With reference to the project, the two types of values.....................................................4
1.3 Develop an appropriate metric.........................................................................................4
1.4 Determine the timeframe for achieving the MOV...........................................................4
Part Two:....................................................................................................................................5
2.1 Define Scope and scope management plan......................................................................5
2.2 Define scope of the project and how scope will be managed..........................................5
2.3 List of resources (from MS-Project)................................................................................6
2.3.1 People (and their roles).............................................................................................6
2.3.2 Technology................................................................................................................7
2.3.3 Facilities....................................................................................................................7
2.3.4 Other..........................................................................................................................7
Part Three:..................................................................................................................................8
3.1 High level Work Breakdown Structure (WBS)...............................................................8
3.1.1 Milestones for each phase and deliverable................................................................8
3.1.2 Activities / Tasks.......................................................................................................8
3.1.3 Resource Assignments............................................................................................10
3.1.4 Estimates for Each Activity / Task..........................................................................11
3.1.5 Develop time estimate for each task or activity to be complete.............................13
3.1.6 Project budget..........................................................................................................15
Part Four:..................................................................................................................................19
4.1 Project Assumptions.......................................................................................................19
4.2 Risk identification framework........................................................................................19
Part Five:..................................................................................................................................20
Document Page
2PROJECT MANAGEMENT
5.1 A short statement that reflects to deliver a quality system to the client.........................20
5.2 A set of verification activities........................................................................................21
5.3 A set of validation activities...........................................................................................21
Part Six:....................................................................................................................................22
6.1 Project closure checklist and project evaluation............................................................22
a. Annotated bibliography................................................................................................22
b. Develop a closure checklist that the project team will use to ensure that the project has
been closed properly........................................................................................................22
c. Develop a project evaluation........................................................................................22
Part Seven: Bibliography.........................................................................................................23
Appendix..................................................................................................................................26
Annotated Bibliography.......................................................................................................26
Document Page
3PROJECT MANAGEMENT
Part One:
1.1 MOV - Measurable Organisational Value
The possible areas of impact for this project are strategy, customer, financial,
operational furthermore social.
Rank the area of impact:
Area of Impact Rank (1 to 5)
Strategy:
Globex helps the farmers to increase productivity and reduce time and cost.
The business strategy of Training and Apprenticeship program for High
School students (TAHS) program is to provide collaboration among the
entities.
1
Customer:
Globex starts TAHS program so that it can help students getting work
experiences and increase employment opportunities in farming solutions
specialists. The system is implemented and developed for customer’s
efficiency.
2
Financial:
By leveraging of technology, the business organization can operate
properly, and the farmers can save cost and improve crop performance
along with productivity to take proper business decisions. The
organizational cost is reduced.
2
Operational:
Globex farming solutions raise efficiency of farming such that the farmers
can improve planning, decision making as well as entire strategy for the
business operations.
4
Social:
Globex completed training in new technologies which can help the farmers
in their future plan. The project team members can interact with each other.
5

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4PROJECT MANAGEMENT
The area of impact which is ranked as 1 is strategy.
1.2 With reference to the project, the two types of values
Better – The proposed system is implemented to manage TAHS program which will
be collaborative work among three entities such as schools, farming equipment
manufacturers, and Globex’ own representatives.
Faster – The computer based system will collect information by means of farming
equipments manufacturers and requirements of staffs. It can also reduce the project cost and
faster the efficiency of business operations.
1.3 Develop an appropriate metric
Stakeholder list Stakeholder expectations
Project Manager The project manager can track the status of the project and can
determine the project cost and schedule.
Financial Executive The financial executive can calculate the total fund required
for the project and measure the cost.
Trainer The trainer of Globex provides training to the students on
skills required to work that they can serve farming solutions
and products.
Operational Manager The operation manager can provide detailed reporting system
which consists of information regarding student details,
apprentice tracking and skills requirements.
1.4 Determine the timeframe for achieving the MOV
Area of impact Metric Timeframe
Strategy The proposed system is developed for
satisfaction of the clients.
1 month
Customer There is an increase in 30% customers because
of system utilization in the company for training
purposes.
2 months
Financial The proposed system provides financial profit to 1 month
Document Page
5PROJECT MANAGEMENT
the organization.
Operational There is 20% increase in the organizational
efficiency.
1 month
Social There is required to have social media platform
for promotion of system.
2 months
Part Two:
2.1 Define Scope and scope management plan
The project plan deals with implementation plus development of computer based system
to manage TAHS program. The project would allow for easier management of student’s
information and reduce technical errors and business cost. This project work is undertaken to
complete in allocated project budget and time. Following are scope of this project plan such
as:
Outline the design of computer based system for Training and Apprenticeship
program for High School students
Develop an user interface for the proposed system
Development of system database and review the proposed system
Completion of project in estimate budget and scheduled time
Develop of project reports based on project requirements
Functionalities of proposed system
Testing and implementation
Gathering the project data and requirements
The system is implemented using computing technology
Communicational tools are required to follow throughout project development
2.2 Define scope of the project and how scope will be managed
The in-scopes of the project plan are:
The project is to be completed in scheduled time and estimated budget
The project clients are being satisfied with proposed system and its performance
Communicational tools are required to follow throughout project development
The computer based system records students details, skills and personal information
Document Page
6PROJECT MANAGEMENT
The system is implemented using computing technology
The out scopes of the project plan are:
The project is required hiring of new workers and project team embers for the
implementation of technical elements of proposed computer based system
There is required to develop specifications of company through implementation of
computer software for TAHS
Training of the workers of Globex for proposed system was not include in the project
requirements
The project scope is managed through the project lifecycle where the main input is the
project charter which can provide roles and responsibilities of project team members and
defined project objectives. Scope is controlled by managing the project changes. The
project manager can determine and evaluate effects of proposed project changes so that
there is no possibility of scope creep while implementation and development of computer
based system.
2.3 List of resources (from MS-Project)
2.3.1 People (and their roles)
Resource Name Std. Rate
Project Manager $70.00/hr
Financial Executive $50.00/hr
Trainer $40.00/hr
System Developer $30.00/hr
Operation Manager $30.00/hr
System Designer $25.00/hr
System Tester $25.00/hr
Risk Manager $25.00/hr

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT MANAGEMENT
Project Sponsor $25.00/hr
Application Manager $25.00/hr
2.3.2 Technology
Hardware Computer, LAN and RAM
Software Operating system, programming platform
Network Intranet and TCP/IP network model
2.3.3 Facilities
The facilities which are required for proper implementation of computer based system
are Wi-Fi connections so that there is accurate web development and also system support is
provided to the organization where the business application is developed.
2.3.4 Other
Travel Requirements There is required of valid passport with 6 months of
validity remaining and online visa application form.
Training Requirements Training is required for the employees with IT
based in addition to system development training.
Document Page
8PROJECT MANAGEMENT
Part Three:
3.1 High level Work Breakdown Structure (WBS)
3.1.1 Milestones for each phase and deliverable
Milestone task Expected start time
Milestone 1: Completion of initiation stage Mon 3/18/19
Milestone 2: Completion of planning stage Tue 4/9/19
Milestone 3: Completion of design stage Mon 5/6/19
Milestone 4: Completion of testing stage Fri 7/26/19
Milestone 5: Completion of closure stage Wed 8/28/19
3.1.2 Activities / Tasks
WBS Task Name
0 Computer based system for Training and Apprenticeship
program for High School students
1 Initiation stage
1.1 Planning for implementation of computer based system
1.2 Analyzing the business specifications
1.3 Assign the project team members
1.4 Identify the human resources required for the project
1.5 Software and hardware requirements
1.6 Determine the project scope
1.7 Determine assumptions and constraints
1.8 Milestone 1: Completion of initiation stage
2 Planning stage
2.1 Analyze the project and system specifications
Document Page
9PROJECT MANAGEMENT
2.2 Estimation of project budget based on project requirements
2.3 Plan for the resources
2.4 Milestone 2: Completion of planning stage
3 Design stage
3.1 Design proposed system
3.2 Plan to design the system based on business needs
3.3 Providing the draft for project design
3.4 Approval of project design draft
3.5 Milestone 3: Completion of design stage
4 Testing stage
4.1 Develop the system requirements
4.2 Develop the business applications
4.3 User testing of proposed system
4.4 Acceptance testing for proposed system
4.5 Test the proposed system based on requirements
4.6 Milestone 4: Completion of testing stage
5 Closure stage
5.1 Identify the project risks
5.2 Mitigation of the risks
5.3 Analyze the training needs
5.4 Review the project charter
5.5 Documentation of project requirements
5.6 Milestone 5: Completion of closure stage
Table 1: Project activities
(Source: Created by author using Ms Project)

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10PROJECT MANAGEMENT
Figure 1: Work breakdown structure
(Source: Created by author)
3.1.3 Resource Assignments
Resource Name Type Initials Max. Units Std. Rate
Project Manager Work P 100% $70.00/hr
Financial Executive Work F 100% $50.00/hr
Trainer Work T 100% $40.00/hr
System Developer Work S 100% $30.00/hr
Operation Manager Work O 100% $30.00/hr
System Designer Work S 100% $25.00/hr
System Tester Work S 100% $25.00/hr
Risk Manager Work R 100% $25.00/hr
Project Sponsor Work P 100% $25.00/hr
Application Manager Work A 100% $25.00/hr
Document Page
11PROJECT MANAGEMENT
Table 2: Project resources
(Source: Created by author using Ms Project)
3.1.4 Estimates for Each Activity / Task
WBS Task Name Duration
0 Computer based system for Training and Apprenticeship
program for High School students 153 days
1 Initiation stage 99 days
1.1 Planning for implementation of computer based system 6 days
1.2 Analyzing the business specifications 8 days
1.3 Assign the project team members 9 days
1.4 Identify the human resources required for the project 24 days
1.5 Software and hardware requirements 7 days
1.6 Determine the project scope 9 days
1.7 Determine assumptions and constraints 21 days
1.8 Milestone 1: Completion of initiation stage 0 days
2 Planning stage 66 days
2.1 Analyze the project and system specifications 10 days
2.2 Estimation of project budget based on project requirements 3 days
2.3 Plan for the resources 6 days
2.4 Milestone 2: Completion of planning stage 0 days
3 Design stage 31 days
3.1 Design proposed system 11 days
3.2 Plan to design the system based on business needs 16 days
3.3 Providing the draft for project design 8 days
Document Page
12PROJECT MANAGEMENT
3.4 Approval of project design draft 8 days
3.5 Milestone 3: Completion of design stage 0 days
4 Testing stage 59 days
4.1 Develop the system requirements 8 days
4.2 Develop the business applications 12 days
4.3 User testing of proposed system 10 days
4.4 Acceptance testing for proposed system 19 days
4.5 Test the proposed system based on requirements 10 days
4.6 Milestone 4: Completion of testing stage 0 days
5 Closure stage 52 days
5.1 Identify the project risks 2 days
5.2 Mitigation of the risks 9 days
5.3 Analyze the training needs 5 days
5.4 Review the project charter 9 days
5.5 Documentation of project requirements 12 days
5.6 Milestone 5: Completion of closure stage 0 days
Table 3: Estimation of each project activities
(Source: Created by author using Ms Project)

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
13PROJECT MANAGEMENT
3.1.5 Develop time estimate for each task or activity to be complete
WB
S Task Name Duration Start Finish
0
Computer based system for
Training and Apprenticeship
program for High School
students
153 days Mon 1/28/19 Wed 8/28/19
1 Initiation stage 99 days Mon 1/28/19 Thu 6/13/19
1.1 Planning for implementation
of computer based system 6 days Mon 1/28/19 Mon 2/4/19
1.2 Analyzing the business
specifications 8 days Tue 2/5/19 Fri 3/22/19
1.3 Assign the project team
members 9 days Thu 5/23/19 Tue 6/4/19
1.4 Identify the human resources
required for the project 24 days Mon 3/25/19 Fri 4/26/19
1.5 Software and hardware
requirements 7 days Wed 6/5/19 Thu 6/13/19
1.6 Determine the project scope 9 days Tue 2/5/19 Fri 2/15/19
1.7 Determine assumptions and
constraints 21 days Mon 2/18/19 Mon 3/18/19
1.8 Milestone 1: Completion of
initiation stage 0 days Mon 3/18/19 Mon 3/18/19
2 Planning stage 66 days Tue 3/19/19 Tue 6/18/19
2.1 Analyze the project and
system specifications 10 days Tue 3/19/19 Mon 4/1/19
2.2 Estimation of project budget
based on project requirements 3 days Fri 6/14/19 Tue 6/18/19
2.3 Plan for the resources 6 days Tue 4/2/19 Tue 4/9/19
2.4 Milestone 2: Completion of
planning stage 0 days Tue 4/9/19 Tue 4/9/19
3 Design stage 31 days Wed 4/10/19 Wed 5/22/19
Document Page
14PROJECT MANAGEMENT
3.1 Design proposed system 11 days Wed 4/10/19 Wed 4/24/19
3.2 Plan to design the system
based on business needs 16 days Thu 4/25/19 Wed 5/22/19
3.3 Providing the draft for
project design 8 days Mon 4/29/19 Fri 5/10/19
3.4 Approval of project design
draft 8 days Thu 4/25/19 Mon 5/6/19
3.5 Milestone 3: Completion of
design stage 0 days Mon 5/6/19 Mon 5/6/19
4 Testing stage 59 days Tue 5/7/19 Fri 7/26/19
4.1 Develop the system
requirements 8 days Tue 5/7/19 Thu 5/16/19
4.2 Develop the business
applications 12 days Fri 5/17/19 Mon 6/3/19
4.3 User testing of proposed
system 10 days Tue 6/4/19 Mon 6/17/19
4.4 Acceptance testing for
proposed system 19 days Tue 6/18/19 Fri 7/12/19
4.5 Test the proposed system
based on requirements 10 days Mon 7/15/19 Fri 7/26/19
4.6 Milestone 4: Completion of
testing stage 0 days Fri 7/26/19 Fri 7/26/19
5 Closure stage 52 days Tue 6/18/19 Wed 8/28/19
5.1 Identify the project risks 2 days Mon 7/29/19 Tue 7/30/19
5.2 Mitigation of the risks 9 days Wed 7/31/19 Mon 8/12/19
5.3 Analyze the training needs 5 days Tue 6/18/19 Mon 6/24/19
5.4 Review the project charter 9 days Wed 7/31/19 Mon 8/12/19
5.5 Documentation of project
requirements 12 days Tue 8/13/19 Wed 8/28/19
5.6 Milestone 5: Completion of
closure stage 0 days Wed 8/28/19 Wed 8/28/19
Document Page
15PROJECT MANAGEMENT
Table 4: Estimation of project activities with duration
(Source: Created by author using Ms Project)
Figure 2: Estimation of project activities with duration
(Source: Created by author using Ms Project)

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
16PROJECT MANAGEMENT
3.1.6 Project budget
WB
S Task Name Cost
0
Computer based system for Training and
Apprenticeship program for High School
students
$130,840.00
1 Initiation stage $54,240.00
1.1 Planning for implementation of computer based
system $4,800.00
1.2 Analyzing the business specifications $4,000.00
1.3 Assign the project team members $5,040.00
1.4 Identify the human resources required for the
project $7,680.00
1.5 Software and hardware requirements $3,080.00
1.6 Determine the project scope $8,640.00
1.7 Determine assumptions and constraints $21,000.00
1.8 Milestone 1: Completion of initiation stage $0.00
2 Planning stage $16,000.00
2.1 Analyze the project and system specifications $6,400.00
2.2 Estimation of project budget based on project
requirements $3,600.00
2.3 Plan for the resources $6,000.00
2.4 Milestone 2: Completion of planning stage $0.00
Document Page
17PROJECT MANAGEMENT
3 Design stage $22,400.00
3.1 Design proposed system $7,040.00
3.2 Plan to design the system based on business
needs $6,080.00
3.3 Providing the draft for project design $3,200.00
3.4 Approval of project design draft $6,080.00
3.5 Milestone 3: Completion of design stage $0.00
4 Testing stage $16,600.00
4.1 Develop the system requirements $3,520.00
4.2 Develop the business applications $5,280.00
4.3 User testing of proposed system $2,000.00
4.4 Acceptance testing for proposed system $3,800.00
4.5 Test the proposed system based on requirements $2,000.00
4.6 Milestone 4: Completion of testing stage $0.00
5 Closure stage $21,600.00
5.1 Identify the project risks $1,520.00
5.2 Mitigation of the risks $3,600.00
5.3 Analyze the training needs $1,600.00
5.4 Review the project charter $7,200.00
5.5 Documentation of project requirements $7,680.00
5.6 Milestone 5: Completion of closure stage $0.00
Document Page
Ms Project file.mpp
18PROJECT MANAGEMENT
Table 5: Project budget
(Source: Created by author using Ms Project)
Figure 3: Project budget
(Source: Created by author using Ms Project)
Ms Project file

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
19PROJECT MANAGEMENT
Part Four:
4.1 Project Assumptions
For the proposed system, the development centre is considered for the system
implementation
The project plan is included with development of communicational activities
Functional requirements of the organization is analysed properly
Proper development and software platform is require to be used in the project plan
The business strategies are to be considered for development of computer based
system for TAHS
4.2 Risk identification framework
Risk
ID
Description Probabi
lity
Imp
act
Rate Assigne
d To
Response
Strategy
Threat or
Opportunity
R1 In the project,
the company
has lack of
project
resources.
65% 3 3 HR
Manager
Human resource
manager should
hire more
resources for the
project so that all
project activities
are carried out by
expert.
Threat
R2 There is not
accurate
maintenance
of the system
which leads to
system
failure.
80% 2 2.5 Operatio
n
Manager
The operation
manager should
maintain the
proposed system.
Threat
R3 The cash flow
of this project
80% 4 2 Financia
l
There should be
required to have
Threat
Document Page
20PROJECT MANAGEMENT
plan is not
sufficient to
cover
organizational
debt services.
executiv
e
proper budget
estimation by the
financial
executive.
R4 The workers
are not
experienced
to work in the
technical field
so that they
can
implement
computer
based system.
90% 5 4 Project
Manager
The workers
should require to
recruit workers
those have
technical skills for
development of
system.
Opportunity
R5 There is poor
communicatio
n among the
project team
members.
40% 1 4 Financia
l
Manager
A communication
plan is required so
that all the project
team members
should interact
with each other for
meeting project
goals and
objectives.
Threat
Part Five:
5.1 A short statement that reflects to deliver a quality system to the client
Following are the points which can reflect to deliver a quality computer based system
for TAHS such as:
There is proper implementation and testing of proposed system so that the system
users can use the system for their benefits.
Document Page
21PROJECT MANAGEMENT
It is concluded that there is weekly meetings which are conducted so that all the
project team members should communicate with each other regarding difficulties they
are facing at the time of development and implementation of proposed system.
After development stage, the system is to be tested properly so that the system can
provide required services to the company.
5.2 A set of verification activities
Verification Activities When?
Analysing the budget for the project to
estimate the cost
Project initiation stage
Testing for the project results Project testing stage
Reviewing the project related documents
to evaluate if it meets with project goals
and objectives
Project planning stage
5.3 A set of validation activities
Validation Activities When?
Project related hardware and
software specifications
Project implementation stage
Review of the project report Project testing stage
Training programs for the high
school students
Project closure stage

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
22PROJECT MANAGEMENT
Part Six:
6.1 Project closure checklist and project evaluation
a. Annotated bibliography
Please refer to Appendix
b. Develop a closure checklist that the project team will use to ensure that the project
has been closed properly
Closure checklist Checklist options
Has testing of system completed on time? Yes
Have all project documents approved by the project
manager?
Yes
Has the project manager check the resource requirements
matrix based on project requirements?
No
Are all project risks mitigated based on their impact on the
project plan?
Yes
Has handover of all project documents completed? No
Has the trainer completed the training of workers? No
c. Develop a project evaluation
Project evaluation criteria Evaluation options
Technical feasibility plan Yes No
Testing and implementation plan Yes No
Project progress and update plan Yes No
Risk management plan Yes No
Communication plan Yes No
Document Page
23PROJECT MANAGEMENT
Document Page
24PROJECT MANAGEMENT
Part Seven: Bibliography
Alotaibi, A. B., & Mafimisebi, O. P. (2016). Project management practice: Redefining
theoretical challenges in the 21st century. Project Management, 7(1), 93-99.
Binder, J. (2016). Global project management: communication, collaboration and
management across borders. Routledge.
Braglia, M., & Frosolini, M. (2014). An integrated approach to implement project
management information systems within the extended enterprise.International
Journal of Project Management, 32(1), 18-29.
Bromiley, P., McShane, M., Nair, A., & Rustambekov, E. (2015). Enterprise risk
management: Review, critique, and research directions. Long range planning, 48(4),
265-276.
Calderón, A., & Ruiz, M. (2015). A systematic literature review on serious games evaluation:
An application to software project management. Computers & Education, 87, 396-
422.
Chih, Y. Y., & Zwikael, O. (2015). Project benefit management: A conceptual framework of
target benefit formulation. International Journal of Project Management, 33(2), 352-
362.
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., & de Almeida, L. F. M. (2014).
Can agile project management be adopted by industries other than software
development?. Project Management Journal, 45(3), 21-34.
Coronel, C., & Morris, S. (2016). Database systems: design, implementation, & management.
Cengage Learning.
Dalcher, D. (2015). Introduction to Software Project Management. Proj Mgmt Jrnl, 46(4), e2-
e2.
Davis, K. (2014). Different stakeholder groups and their perceptions of project
success. International journal of project management, 32(2), 189-201.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
25PROJECT MANAGEMENT
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Fuller, M. A., Valacich, J. S., George, J. F., & Schneider, C. (2017). Information Systems
Project Management: A Process and Team Approach, Edition 1.1. Prospect Press.
Golini, R., Kalchschmidt, M., & Landoni, P. (2015). Adoption of project management
practices: The impact on international development projects of non-governmental
organizations. International Journal of Project Management, 33(3), 650-663.
Harmon, P. (2015). The scope and evolution of business process management. In Handbook
on business process management 1 (pp. 37-80). Springer, Berlin, Heidelberg.
Hornstein, H. A. (2015). The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2),
291-298.
Kendrick, T. (2015). Identifying and managing project risk: essential tools for failure-
proofing your project. AMACOM Div American Mgmt Assn.
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John
Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Larson, E. W., & Gray, C. F. (2015). A Guide to the Project Management Body of
Knowledge: PMBOK (®) Guide. Project Management Institute.
Meredith, Jack R., Scott M. Shafer, Samuel J. Mantel Jr, and Margaret M. Sutton. Project
management in practice. Wiley Global Education, 2016.
Novo, B., Landis, E. A., & Haley, M. L. (2017). Leadership and its role in the success of
project management. Journal of Leadership, Accountability, and Ethics, 14(1), 73-78.
Papke-Shields, K. E., & Boyer-Wright, K. M. (2017). Strategic planning characteristics
applied to project management. International Journal of Project Management, 35(2),
169-179.
Document Page
26PROJECT MANAGEMENT
Perrenoud, A., Lines, B. C., Savicky, J., & Sullivan, K. T. (2017). Using best-value
procurement to measure the impact of initial risk-management capability on
qualitative construction performance. Journal of Management in Engineering, 33(5),
04017019.
Rosemann, M., & vom Brocke, J. (2015). The six core elements of business process
management. In Handbook on business process management 1 (pp. 105-122).
Springer, Berlin, Heidelberg.
Serra, C. E. M., & Kunc, M. (2015). Benefits realisation management and its influence on
project success and on the execution of business strategies. International Journal of
Project Management, 33(1), 53-66.
Stark, J. (2015). Product lifecycle management. In Product Lifecycle Management (pp. 1-29).
Springer International Publishing.
Steyn, H., Sparrius, A., Dekker, A. H., Kuschke, B., Van Eck, B. P. S., & Visser, K.
(2016). Project management: A multi-disciplinary approach. FPM Publishing.
Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), 278-290.
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D.
(2015). Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Turner, J. R. (2017). Contracting for project management. Routledge.
Verburg, R. M., Bosch-Sijtsema, P., & Vartiainen, M. (2013). Getting it done: Critical
success factors for project managers in virtual work settings.International Journal of
Project Management, 31(1), 68-79.
Zheng, X., Le, Y., Chan, A. P., Hu, Y., & Li, Y. (2016). Review of the application of social
network analysis (SNA) in construction project management research. International
journal of project management, 34(7), 1214-1225.
Document Page
27PROJECT MANAGEMENT
Appendix
Annotated Bibliography
Novo, B., Landis, E. A., & Haley, M. L. (2017). Leadership and its role in the success of
project management. Journal of Leadership, Accountability, and Ethics, 14(1), 73-78.
This article discusses about the leadership profiles of the project manager and
examines evidences between leadership of project manager along with success in the project.
The leadership profile of project manager is to create clarity in the communication, define
role plus responsibilities of project stakeholders, communicational expectations and establish
of trust. This article examines areas to be focused on behavioural as well as managerial skills
of project manager and their success in project plan. A successful project manager has
strengths to show higher level of managerial abilities so that the project can meet with
client’s expectations and complete the project on scheduled time and budget. Leadership is
considered as a factor in success of project management. Linking the business organization
among leadership and successful project manager is offered invaluable information. In order
to determine the project success, management of resources and motivation is required for
successful delivery of project work. There is higher importance of managerial and emotional
competencies to determine the project success.
Rosemann, M., & vom Brocke, J. (2015). The six core elements of business process
management. In Handbook on business process management 1 (pp. 105-122).
Springer, Berlin, Heidelberg.
This article provides different facts of the business process management. It provides
an understanding of various ideas behind design, manage and change processes for the
organizational purposes. It is a discipline where people can notice, analyse, recover, optimize
as well as computerize the business processes. It is focused to improve the business
performance by means of management of business processes. Business process management
is involved to organize the project outcomes to make sure that project is maintained properly.
It corrects and improves the business process before automation the entire functions. The
process management is involved to evaluate business processes and actions for improving the

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
28PROJECT MANAGEMENT
flow of entire processes. It leads towards continuous cycle to evaluate and improve business
organization. Process improvement method is used to address complexity of the inter
application plus cross functional processes on daily basis.
Bromiley, P., McShane, M., Nair, A., & Rustambekov, E. (2015). Enterprise risk
management: Review, critique, and research directions. Long range planning, 48(4),
265-276.
This article summarizes how to manage the enterprise risk management in a project
plan. Enterprise risk management can add value to the firm which can lead to standard
corporate performance like return on assets. Risk management forecast and evaluates
financial issues with identifying the processes to minimize the impact. It is a process to
identify, assess and control the project threats to capital of organization along with earnings.
The risk management is required in the organization so that it can define to take the project
risks in considerations of various risk factors. Risk management is a continuous process to
take decisions. In any business organization, risk management is part of project management
as it can lead to project success. Risk management can utilize tools, methods and processes
for managing the project risks. In the organization, the risk management plan help to identify
potential issues which the project team members can face. When the business organization
avoids the risks and issues, then it will provide a high impact on the project success.
1 out of 29
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]