logo

Organization Details - Person completing the SWMS

   

Added on  2022-08-18

3 Pages281 Words17 Views
ORGANISATION DETAILS
Project Manager
Person(s) completing the SWMS: Contact No.
Position: Reviewed by:
Date prepared: Review date:
PROJECT DETAILS
Scope of the work Hazard identification and control measures
Who else was consulted/involved
in preparing this SWMS?
Chief executive officer of RMIT workspace
What high risk work activities are
covered by this SWMS?
Visiting work station for evaluation
References: Legislation, Australian
Standards, Codes of Practice,
MSDS & SOP’s
Plant and equipment involved in
the scope of work
RMIT work station
RISK DETAILS AND CONTROL MEASURES
Identify each
task
Specify the
hazards you
have identified.
What are the
risks to OHS?
Describe the control
measures.
Responsible person
for Implementing
and monitoring the
controls?
Cleaning
work at the
Tripping Injuries Installing safety
precaution measures
Risk management
office

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Site Inspection Report for WHS Management Plan Assessment
|15
|2909
|54

Environmental engineering1
|9
|1456
|14

Roles of a Work Health and Safety Advisor for Australia
|10
|2482
|17

Risk Management - Assignment Sample
|9
|2052
|54

Questions on Codes of Practice in Group Work
|16
|2527
|162

Occupational Health and Safety Procedures for Plants, Equipment, and Hazardous Chemicals
|21
|4271
|397