logo

Competency Demonstration Report Doc

   

Added on  2020-05-11

8 Pages1636 Words91 Views
COMPETENCYDEMONSTRATION REPORTCareer Episode 2SRIKUMAR CHAKKALETHU RAM

CE 2.1 Project InformationName of the project: Administration Building and Gate #1 IP CCTV System withEquipment RelocationLocation of the project: Al-Khobar, Saudi ArabiaProject Duration: July 2011Organization: Saudi Arabian Oil CompanyRole and Designation during the time: Telecommunications field engineerCE 2.2 Project BackgroundCE 2.2.1 Characteristics of the projectThe project was based on the aspect of installation of IP based CCTV system for theManifa ISF administrative building and the gate number 1. The system is to be controlled andmonitored with the help of a below location system framework and will be recorded for a periodof ninety days. I was responsible for the system to be connected with a dedicated network of IPwhich will provide the organisation to monitor the Saudi Aramco corporation network with ease.The project has been completed by following all the standards of project completion. Thecomplete system consisted of eleven indoor cameras for the administration building. Thecameras has been installed at all the entry points and the exit points. There are also severalcameras with dome shape with one and two lens specification.

CE 2.2.2 Objectives developed for the projectFor the completion of the bet quality work for the project I had set up the following list ofobjectives for the project:To provide a closed circuit based on the cameras.To post cameras at all the points of the building so that no blind spot can be found. To connect all the cameras within a single IP network so that the network can bemonitored easily. To provide a monitoring sector in the organisation where the cameras feed will bereturned.To make a logging system for the cameras so that the security measure can becontrolled and the sharing of data within the organisation. CE 2.2.3 My area of workFor the duration of the project I was responsible for the connection of all the securitycameras in the facility. I was working as the telecommunication field engineer for the completeduration of the project. Thus, I was able to provide my team with the best direction for thecompletion of the project and to complete the project in time.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Summary Statement: Competency Element
|12
|2649
|50

Project on Plate Recognition System
|8
|1669
|77

Competency Demonstration Report: Development of Security
|8
|1730
|274

Electronics Engineer Job Profile
|5
|902
|154

Wireless Temperature Monitoring of Substation Buildings in Main Control Room - Career Episode 3
|8
|1463
|213

Competency Demonstration Report- Career Episode 2
|8
|1621
|200