Planning and Co-ordination in the Construction Project
Planning and Co-ordination in Construction Project_1
TABLE OF CONTENT
INTRODUCTION...........................................................................................................................3
MAIN BODY..................................................................................................................................3
Task A..............................................................................................................................................3
Gantt chart for the construction projects.....................................................................................3
Task B..............................................................................................................................................6
Calculation of duration from principles for three elements in the construction program...........6
Task C..............................................................................................................................................8
Analysis of allocating resources and considering health, safety and key risk.............................8
Task D............................................................................................................................................10
Proposal of suitable pm team structure for project....................................................................10
CONCLUSION..............................................................................................................................11
REFERENCES................................................................................................................................1
Planning and Co-ordination in Construction Project_2
INTRODUCTION
Effective project management includes planning, managing the resources and
coordinating to make sure that the project achieves their targets with the given duration.
Effective communication and monitoring is required at every stage of the project. This study will
discuss the work done by XYZ building contractor who has been given the project of Northwold
house. Further will prepare the planning report which will include the Gantt chart which covers
the construction and the activities and external works associated with the project. The study will
also calculate the duration for the three elements in the construction program, analysing and
justification of the allocating resources while taking the considerations into health and safety and
the key risks associated with it. This report will give light on the proposal of suitable pm team
structure for project.
MAIN BODY
Task A
Gantt chart for the construction projects
Gantt charts are basically bar charts which help in providing visual view of the tasks which
are scheduled over time. It is helpful in planning the projects of all sizes and also proves to be the
most useful way to show that which work is scheduled for doing on specific day and time. These
make it easy for the project manager to evaluate the start and end dates of all the tasks which are
to be performed in the project.
The Gantt chart will be made for the construction project for residential purposes makes
much easy for planning, managing and communicating the construction schedule which
facilitates everyone who are working towards the same goals of the project. The project manager
schedule and assigns the work to the subcontractors and crew and the construction schedule is
shared with the stakeholders and clients so that they can be informed at each stage of the project.
The project management tools and the stages can be used for the project of construction for
the residential purposes by the XYZ building contractor. This project can be divided into 5
basic stages in which further include the sub-activities (Ismail, Srewil and Scherer, 2017). The
five phases are project initiation, project planning, execution, monitoring and closure.
Planning and Co-ordination in Construction Project_3
Task Name Duration Start Finish Predecessors
Planning and Co-ordination in Construction Project_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management: Elements, Allocation, and Analysis
|12
|4007
|4

Project Management for BMS Software Development
|21
|4077
|90

Information System Project Management Doc
|22
|5527
|40

Project Plan: Development of IT Centre
|33
|1225
|52

Project Management: Residential Building Construction in New South Wales, Australia
|31
|7373
|365

Project Development for Strategic Management - Task 5.2
|13
|589
|130