logo

PPMP20009 Leading Lean Projects - Assignment

   

Added on  2021-05-31

4 Pages845 Words66 Views
 | 
 | 
 | 
(Insert Student Name) / (Insert Student Number) - PPMP20009Unit Portfolio for Week (Insert week number)-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Weekly Portfolio Learning TableTopic and reading samples.Your personal learning outcomes from thisunit.Learnings from your experience.Supporting documentation including your prior learnings.What is project classification There are different ways through which projects can be classified. Depending upon theproject details the planning should be prepared.The phases on which the projects the classified include the following:Size of the project based on cost, business values, project team members and durationfor successful completion Project initiation documentation Kerzner Chapter 1It is not necessary that each time the project managers will be senior most. Based on the experience, skill and knowledge the project managers are allocated.Yes, I think that a functional manager of anyorganization can easily become a project manager for any business organization. The project manager should follow all necessary criteria to meet the objectives (Kerzner 2017).Again the project managers should motivateand co-ordinate all the project team members together so that they can successfully deliver the project requirements. Based upon the priority of any project the roles of the project manager and functional manager are categorized and allocated.Egelstaff (2013) Academic assignments: Critical thinking and writing criticallyNot every time project management plans aredesigned for transferring power from the line manager to the project manager (Kerzner 2017). Generally each time the project managers are found to be dedicated and committed to their job roles. Leadership is a very important factor that must be considered to deliver a successful project.Project planning documentation 1 of 4
PPMP20009 Leading Lean Projects -  Assignment_1

(Insert Student Name) / (Insert Student Number) - PPMP20009Unit Portfolio for Week (Insert week number)Topic and reading samples.Your personal learning outcomes from thisunit.Learnings from your experience.Supporting documentation including your prior learnings.Journals & StandardsThe career path differ a lost for the project driven organization and non project driven organization. Project driven organization always helps to increase the knowledge and the skills of any personnel.Among the project manager, line manager and project engineer the growth or career path differs a lot. For any person the career should be started from a basic role where, they will get chance to learn many different organizational project aspects (Kerzner 2017). Then, the gathered skills and knowledge help the person to become a project manager or line manager respectively. Initiation and Planning documentationIJPMThere are different organizational structures such as functional, matrix etc. Based on the professionalism and discipline all these structures, their effectiveness and efficiency can be defined. In order to deploy the project properly all activities should be organized professionally.Based on the situation and current position of the organizations therapy sessions are needed either regular basis or frequently. PMJ For project management the therapy session can take place for smaller time san or a larger time span.The frequency of the therapy session depends on the chosen organizational plan and all time it is not necessary that these should be treated equally rather based on the e=complexity these should be treated accordingly. Planning documentation SAI GlobalThe executive board of any organization is placed at the top most designation and the rest of the members are always having professional bosses. Project manager: Project executive is he boss for the project managerFunctional team members: Functional teammembers have many bosses such as functional manager, project manager, operational manager and obviously the executive manager. Functional manager: The Functional manager has to report t the project executives’ bout the current status of the project and its operational details. 2 of 4
PPMP20009 Leading Lean Projects -  Assignment_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
PPMP20009 - Portfolio for Week 5
|3
|705
|65

PPMP20009 - Leading Lean Projects Assignment
|12
|2751
|23

Project Classification and Organizational Structures in Project Management
|4
|846
|433

PPMP20009 - Leading Lean Projects Sample Assignment
|10
|2233
|51

PPMP20009 Portfolio for Week 5
|16
|3173
|25

PPMP20009 Portfolio for Week 3
|5
|813
|62