PROFESSIONAL ENGINEER
Summary Statement
These are the competency Units and Elements.
Competency Element A brief summary of how you
have applied the element
Paragraph number
in the career
episode(s) where the
element is addressed
PE1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive, theory-
based understanding of the
underpinning natural and
physical sciences and the
engineering fundamentals
applicable to the engineering
discipline
I had to deliver all the engineering
practices for the proper and well-
functioning of the machines and
their establishments within the
organization
I was assigned to the refinery
section where I had to execute the
vulcanizing process of the rubbers
and establish a system that is
much more efficient than
traditional ones
I was assigned as a quality
engineer in the Roop Polymers
limited company, which is
responsible for manufacturing of
plastic and rubber parts for
automotive OEM at the global
Career Episode 1: CE
1.2.1, CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE
2.3.1 and CE 2.3.3
Career Episode 3: CE
3.2.1, CE 3.3.1 and
CE 3.3.2
Summary Statement
These are the competency Units and Elements.
Competency Element A brief summary of how you
have applied the element
Paragraph number
in the career
episode(s) where the
element is addressed
PE1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive, theory-
based understanding of the
underpinning natural and
physical sciences and the
engineering fundamentals
applicable to the engineering
discipline
I had to deliver all the engineering
practices for the proper and well-
functioning of the machines and
their establishments within the
organization
I was assigned to the refinery
section where I had to execute the
vulcanizing process of the rubbers
and establish a system that is
much more efficient than
traditional ones
I was assigned as a quality
engineer in the Roop Polymers
limited company, which is
responsible for manufacturing of
plastic and rubber parts for
automotive OEM at the global
Career Episode 1: CE
1.2.1, CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE
2.3.1 and CE 2.3.3
Career Episode 3: CE
3.2.1, CE 3.3.1 and
CE 3.3.2
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
level
PE1.2 Conceptual
understanding of the
mathematics, numerical
analysis, statistics and
computer and information
sciences which underpin the
engineering discipline
I carried out the feasibility
analysis for determining the
effectiveness of the activities
implemented within the project
I was appointed as a production
engineer in one of the Dubai
located rubber company where I
had to take care of the production
and management of the
engineering practices and
contribute in the development and
growth of the products of high
quality
I and my team was assigned with
different duties for the
enhancement in the sales and
efficiency of ten most popular
parts including the Gasket
Manifold, Fool Rest, Fuse Box,
Lunax Hose, Gasket, Pad Tank
Cover, and many more
Career Episode 1: CE
1.3.1
Career Episode 2: CE
2.3.2, CE 2.3.3 and
CE 2.3.4
Career Episode 3: CE
3.3.2
PE1.3 In-depth understanding
of specialist bodies of
knowledge within the
engineering discipline
I had implemented my engineering
knowledge and management skills
for enhancing the production and
limiting the defects identified
during the execution of the work
I was assigned for managing the
Career Episode 1: CE
1.3.1
Career Episode 2: CE
PE1.2 Conceptual
understanding of the
mathematics, numerical
analysis, statistics and
computer and information
sciences which underpin the
engineering discipline
I carried out the feasibility
analysis for determining the
effectiveness of the activities
implemented within the project
I was appointed as a production
engineer in one of the Dubai
located rubber company where I
had to take care of the production
and management of the
engineering practices and
contribute in the development and
growth of the products of high
quality
I and my team was assigned with
different duties for the
enhancement in the sales and
efficiency of ten most popular
parts including the Gasket
Manifold, Fool Rest, Fuse Box,
Lunax Hose, Gasket, Pad Tank
Cover, and many more
Career Episode 1: CE
1.3.1
Career Episode 2: CE
2.3.2, CE 2.3.3 and
CE 2.3.4
Career Episode 3: CE
3.3.2
PE1.3 In-depth understanding
of specialist bodies of
knowledge within the
engineering discipline
I had implemented my engineering
knowledge and management skills
for enhancing the production and
limiting the defects identified
during the execution of the work
I was assigned for managing the
Career Episode 1: CE
1.3.1
Career Episode 2: CE
refinery section of the industry
where I had to utilize my
engineering and management
skills for improving and enhancing
the output of the organization
I had collected the production and
sales related data from previous
years and compared it with the
present conditions
2.3.1, CE 2.3.4, CE
2.2.5 and CE 2.4.2
Career Episode 3: CE
3.3.1, CE 3.3.3
PE1.4 Discernment of
knowledge development and
research directions within the
engineering discipline
I managed the group of members
working under my guidance for
tracking their objectives and
motivating them to incorporate
within the organizational goals
and objectives
I reviewed the overall model,
identified certain problems in the
design, and thus, eliminated those
problems in manner to increase the
value and quality of the products
being produced
I accomplished the activities
related to the making of the Die
and Pin for extrusion. I had
extruded pipe from extrusion, and
Ring cuted from slicer
Career Episode 1: CE
1.2.5, CE 1.3.1 and
CE 1.4.2
Career Episode 2: CE
2.3.2, CE 2.3.4 and
CE 2.4.1
Career Episode 3: CE
3.3.2, CE 3.3.3 and
CE 3.4.1
PE1.5 Knowledge of contextual
factors impacting the
I designed, implemented, and
refined processes, services,
Career Episode 1: CE
1.2.1, CE 1.2.2,
where I had to utilize my
engineering and management
skills for improving and enhancing
the output of the organization
I had collected the production and
sales related data from previous
years and compared it with the
present conditions
2.3.1, CE 2.3.4, CE
2.2.5 and CE 2.4.2
Career Episode 3: CE
3.3.1, CE 3.3.3
PE1.4 Discernment of
knowledge development and
research directions within the
engineering discipline
I managed the group of members
working under my guidance for
tracking their objectives and
motivating them to incorporate
within the organizational goals
and objectives
I reviewed the overall model,
identified certain problems in the
design, and thus, eliminated those
problems in manner to increase the
value and quality of the products
being produced
I accomplished the activities
related to the making of the Die
and Pin for extrusion. I had
extruded pipe from extrusion, and
Ring cuted from slicer
Career Episode 1: CE
1.2.5, CE 1.3.1 and
CE 1.4.2
Career Episode 2: CE
2.3.2, CE 2.3.4 and
CE 2.4.1
Career Episode 3: CE
3.3.2, CE 3.3.3 and
CE 3.4.1
PE1.5 Knowledge of contextual
factors impacting the
I designed, implemented, and
refined processes, services,
Career Episode 1: CE
1.2.1, CE 1.2.2,
engineering discipline
products, and systems considering
the objectives and goals of the
organization
I had to monitor and audit the
overall functioning of the refinery
section assuring that the members
involved in the project are
successfully delivering their area
of work
I considering the enhancement of
the efficiency and restricting the
rejection of the product from 15 %
to 1 % developed the design
related to the gasket manifold
Career Episode 2: CE
2.2.1, CE 2.2.2
Career Episode 3: CE
3.2.1, CE 3.2.3
PE1.6 Understanding of the
scope, principles, norms,
accountabilities and bounds of
contemporary engineering
practice in the specific
discipline
I was responsible for the
development of layout of
Machines Location including the
scaling and integrating of the
resources as per the needs and
requirements of the project
I was responsible for assuring that
the wastes are completely being
utilized and the quality of the
rubber being utilized in an
effective and efficient manner
I collected the data and analyzed
them for the proposition of an
Career Episode 1: CE
1.2.3, CE 1.3.3, CE
1.3.4 and CE 1.3.2
Career Episode 2: CE
2.2.3, CE 2.3.1 and
CE 2.3.2
Career Episode 3: CE
3.2.3, CE 3.3.1 and
products, and systems considering
the objectives and goals of the
organization
I had to monitor and audit the
overall functioning of the refinery
section assuring that the members
involved in the project are
successfully delivering their area
of work
I considering the enhancement of
the efficiency and restricting the
rejection of the product from 15 %
to 1 % developed the design
related to the gasket manifold
Career Episode 2: CE
2.2.1, CE 2.2.2
Career Episode 3: CE
3.2.1, CE 3.2.3
PE1.6 Understanding of the
scope, principles, norms,
accountabilities and bounds of
contemporary engineering
practice in the specific
discipline
I was responsible for the
development of layout of
Machines Location including the
scaling and integrating of the
resources as per the needs and
requirements of the project
I was responsible for assuring that
the wastes are completely being
utilized and the quality of the
rubber being utilized in an
effective and efficient manner
I collected the data and analyzed
them for the proposition of an
Career Episode 1: CE
1.2.3, CE 1.3.3, CE
1.3.4 and CE 1.3.2
Career Episode 2: CE
2.2.3, CE 2.3.1 and
CE 2.3.2
Career Episode 3: CE
3.2.3, CE 3.3.1 and
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
effective approach that can be
delivered considering the market
and the needs and requirements of
the customers
CE 3.3.2
PE2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of
established engineering
methods to complex
engineering problem solving
I predicted and analyzed the
demand of the market in the new
season and executed the strategies
and activities as per the designed
model for assuring that the
organization would be capable of
meeting the increased demands
during peak season
I had to limit the excess salt
present above the surface of the
rubber in manner to enhance the
quality of the developed product
and assure that the activities are
being accomplished with higher
efficiency
I modified the system to be run as
a compression mould as
previously, it was running as a
transfer mould
Career Episode 1: CE
1.2.4, CE 1.3.1 and
CE 1.4.2
Career Episode 2: CE
2.3.3, CE 2.3.4 and
CE 2.4.1, CE 2.4.2
Career Episode 3: CE
3.3.1, CE 3.3.2 and
CE 3.4.2
PE2.2 Fluent application of
engineering techniques, tools
and resources
I deployed the model that can
boost up the productivity of the
rubbers and ensure that the
meeting demands will be met in
the peak season
Career Episode 1: CE
1.3.3, CE 1.3.2 and
CE 1.3.1
delivered considering the market
and the needs and requirements of
the customers
CE 3.3.2
PE2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of
established engineering
methods to complex
engineering problem solving
I predicted and analyzed the
demand of the market in the new
season and executed the strategies
and activities as per the designed
model for assuring that the
organization would be capable of
meeting the increased demands
during peak season
I had to limit the excess salt
present above the surface of the
rubber in manner to enhance the
quality of the developed product
and assure that the activities are
being accomplished with higher
efficiency
I modified the system to be run as
a compression mould as
previously, it was running as a
transfer mould
Career Episode 1: CE
1.2.4, CE 1.3.1 and
CE 1.4.2
Career Episode 2: CE
2.3.3, CE 2.3.4 and
CE 2.4.1, CE 2.4.2
Career Episode 3: CE
3.3.1, CE 3.3.2 and
CE 3.4.2
PE2.2 Fluent application of
engineering techniques, tools
and resources
I deployed the model that can
boost up the productivity of the
rubbers and ensure that the
meeting demands will be met in
the peak season
Career Episode 1: CE
1.3.3, CE 1.3.2 and
CE 1.3.1
I implemented few modifications
in the available mechanism which
had 10 rollers earlier which is
continuously Rotate which dip
Profile into the hot molten salt
tank
I transformed the previously used
materials with the newly proposed
objects such as 6 GMS patti
putting in transfer pot was
previously used and it was
replaced with the 1.70 – 1.80
GMs. Ring Putting IN BOP
Career Episode 2: CE
2.3.1, CE 2.3.2 and
CE 2.3.3
Career Episode 3: CE
3.3.1, CE 3.3.2 and
CE 3.3.3
PE2.3 Application of
systematic engineering
synthesis and design processes
I related the situation of the
market and the production system
and bring up with a solution that
can be helpful in enhancing the
production and output of the
organization
I applied two rod with rotate mode
at different sections where profile
had more stress aftereffect profile
started to vibrate. Salt obsolete
from surface of rubber Profile and
fallen to the tank
I identified that previously
clamping pressure was 180 kg /
Career Episode 1: CE
1.2.3, CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE
2.3.3 and CE 2.3.4
Career Episode 3: CE
3.2.5
in the available mechanism which
had 10 rollers earlier which is
continuously Rotate which dip
Profile into the hot molten salt
tank
I transformed the previously used
materials with the newly proposed
objects such as 6 GMS patti
putting in transfer pot was
previously used and it was
replaced with the 1.70 – 1.80
GMs. Ring Putting IN BOP
Career Episode 2: CE
2.3.1, CE 2.3.2 and
CE 2.3.3
Career Episode 3: CE
3.3.1, CE 3.3.2 and
CE 3.3.3
PE2.3 Application of
systematic engineering
synthesis and design processes
I related the situation of the
market and the production system
and bring up with a solution that
can be helpful in enhancing the
production and output of the
organization
I applied two rod with rotate mode
at different sections where profile
had more stress aftereffect profile
started to vibrate. Salt obsolete
from surface of rubber Profile and
fallen to the tank
I identified that previously
clamping pressure was 180 kg /
Career Episode 1: CE
1.2.3, CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE
2.3.3 and CE 2.3.4
Career Episode 3: CE
3.2.5
cm square, which was replaced by
clamping pressure of 80 kg / cm
square
PE2.4 Application of
systematic approaches to the
conduct and management of
engineering projects
I executed the calculations and
mathematical statistics for
assuring that the exact
establishment of the machines
I managed their activities through
practicing my managerial and
leadership skills that helped in
delivering the objectives of the
project
I managed the roles and
responsibilities of the staffs and
employees of lower grade assuring
that they have been assigned with
the workload that can be handled
by them without any extra burden
Career Episode 1: CE
1.3.1 and CE 1.3.2
Career Episode 2: CE
2.2.3, CE 2.3.1, CE
2.3.2 and CE 2.3.3
Career Episode 3: CE
3.3.1 and CE 3.3.2
PE3 ENGINEERING APPLICATION ABILITY
PE3.1 Ethical conduct and
professional accountability
I was responsible for the
identification of the numbers those
could be turned into profits for the
organization
I audited the machines and rods
being utilized in this refinery
process
I had done mathematical
Career Episode 1: CE
1.2.3, CE 1.3.3 and
CE 1.4.1
Career Episode 2: CE
2.2.3, CE 2.3.5 and
CE 2.4.2
Career Episode 3: CE
clamping pressure of 80 kg / cm
square
PE2.4 Application of
systematic approaches to the
conduct and management of
engineering projects
I executed the calculations and
mathematical statistics for
assuring that the exact
establishment of the machines
I managed their activities through
practicing my managerial and
leadership skills that helped in
delivering the objectives of the
project
I managed the roles and
responsibilities of the staffs and
employees of lower grade assuring
that they have been assigned with
the workload that can be handled
by them without any extra burden
Career Episode 1: CE
1.3.1 and CE 1.3.2
Career Episode 2: CE
2.2.3, CE 2.3.1, CE
2.3.2 and CE 2.3.3
Career Episode 3: CE
3.3.1 and CE 3.3.2
PE3 ENGINEERING APPLICATION ABILITY
PE3.1 Ethical conduct and
professional accountability
I was responsible for the
identification of the numbers those
could be turned into profits for the
organization
I audited the machines and rods
being utilized in this refinery
process
I had done mathematical
Career Episode 1: CE
1.2.3, CE 1.3.3 and
CE 1.4.1
Career Episode 2: CE
2.2.3, CE 2.3.5 and
CE 2.4.2
Career Episode 3: CE
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
calculations and determination of
the values associated with the
products for the determination of
the most effective and efficient
product
3.3.3, CE 3.4
PE3.2 Effective oral and
written communication in
professional and lay domains
I focused on the individual
performance of other team
members at lower hierarchy that
alternatively reflected on the
overall production and growth of
the organization
I applied two rod with rotate mode
at different sections where profile
had more stress aftereffect profile
started to vibrate. Salt obsolete
from surface of rubber Profile and
fallen to the tank
I identified it as a very big figure
lagging in this section and thus,
new design and modifications
were needed in manner to
minimize it to the extent level
Career Episode 1: CE
1.2.3, CE 1.3.3 and
CE 1.4.1
Career Episode 2: CE
2.2.3, CE 2.3.5 and
CE 2.4.2
Career Episode 3: CE
3.3.3, CE 3.4
PE3.3 Creative innovative and
proactive demeanour
I prepared the model that can be
deployed for the outcomes of the
project without affecting the
quality of the product
I implemented two rods with
rotate at different sections those
Career Episode 1: CE
1.3, CE 1.4 and CE
1.4.2
Career Episode 2: CE
2.3.5, CE 2.4, CE
the values associated with the
products for the determination of
the most effective and efficient
product
3.3.3, CE 3.4
PE3.2 Effective oral and
written communication in
professional and lay domains
I focused on the individual
performance of other team
members at lower hierarchy that
alternatively reflected on the
overall production and growth of
the organization
I applied two rod with rotate mode
at different sections where profile
had more stress aftereffect profile
started to vibrate. Salt obsolete
from surface of rubber Profile and
fallen to the tank
I identified it as a very big figure
lagging in this section and thus,
new design and modifications
were needed in manner to
minimize it to the extent level
Career Episode 1: CE
1.2.3, CE 1.3.3 and
CE 1.4.1
Career Episode 2: CE
2.2.3, CE 2.3.5 and
CE 2.4.2
Career Episode 3: CE
3.3.3, CE 3.4
PE3.3 Creative innovative and
proactive demeanour
I prepared the model that can be
deployed for the outcomes of the
project without affecting the
quality of the product
I implemented two rods with
rotate at different sections those
Career Episode 1: CE
1.3, CE 1.4 and CE
1.4.2
Career Episode 2: CE
2.3.5, CE 2.4, CE
were helpful in limiting the excess
extract of the salt and it has saved
$ 800 USD and thus, saving lots of
money
I successfully restricted the
rejection figures proposed in the
above table and thus, enhanced the
overall revenue of the project in an
efficient and effective manner
2.2.5 and CE 2.4.2
Career Episode 3: CE
3.2, CE 3.3
PE3.4 Professional use and
management of information
I set the timeline for the execution
of the activities those were
necessary for the development of
the project and managed to
accomplish the activities before
the peak season
I tried to manage the roles and
responsibilities of the individuals
working under my guidance
I had implemented five changes as
stated in the above section and
those were capable of achieving
the objectives of the proposed
project
Career Episode 1: CE
1.2.3, CE 1.2.5, CE
1.4.2
Career Episode 2: CE
2.2.3, CE 2.2.5, CE
2.4.2
Career Episode 3: CE
3.2.3, CE 3.2.5, CE
3.4.2
PE3.5 Orderly management of
self, and professional conduct
I identified the peak season and
developed the design of the work
that can be helpful in meeting the
changes within the existing
systems
Career Episode 1: CE
1.4.1, CE 1.3.1 and
CE 1.3.2
extract of the salt and it has saved
$ 800 USD and thus, saving lots of
money
I successfully restricted the
rejection figures proposed in the
above table and thus, enhanced the
overall revenue of the project in an
efficient and effective manner
2.2.5 and CE 2.4.2
Career Episode 3: CE
3.2, CE 3.3
PE3.4 Professional use and
management of information
I set the timeline for the execution
of the activities those were
necessary for the development of
the project and managed to
accomplish the activities before
the peak season
I tried to manage the roles and
responsibilities of the individuals
working under my guidance
I had implemented five changes as
stated in the above section and
those were capable of achieving
the objectives of the proposed
project
Career Episode 1: CE
1.2.3, CE 1.2.5, CE
1.4.2
Career Episode 2: CE
2.2.3, CE 2.2.5, CE
2.4.2
Career Episode 3: CE
3.2.3, CE 3.2.5, CE
3.4.2
PE3.5 Orderly management of
self, and professional conduct
I identified the peak season and
developed the design of the work
that can be helpful in meeting the
changes within the existing
systems
Career Episode 1: CE
1.4.1, CE 1.3.1 and
CE 1.3.2
I always keep them motivated and
always tried to communicate with
them and solve their problems, if
they are facing any during the
execution of the project
I called for the installment of the
machines in manner to enhance
the contribution of the employees
within the production section and
enhancing the output of the
organization
Career Episode 2: CE
2.4.2, CE 2.3.2, CE
2.3.3 and CE 2.3.4
Career Episode 3: CE
3.4.2, CE 3.3.1 and
CE 3.3.2
PE3.6 Effective team
membership and team
leadership
I managed the accomplishment of
the changes and installment of the
additional machines for the
enhancement in the production
I was assigned as the production
engineer and thus, my contribution
resulted in the positive results for
the overall project
I was under two executives with a
partner by my side and I had to
manage all the individuals from
the lower hierarchy and managed
their roles and responsibilities
within the organization
Career Episode 1: CE
1.4.1, CE 1.4.2
Career Episode 2: CE
2.4.1 and CE 2.4.2
Career Episode 3: CE
3.4.1 and CE 3.4.2
always tried to communicate with
them and solve their problems, if
they are facing any during the
execution of the project
I called for the installment of the
machines in manner to enhance
the contribution of the employees
within the production section and
enhancing the output of the
organization
Career Episode 2: CE
2.4.2, CE 2.3.2, CE
2.3.3 and CE 2.3.4
Career Episode 3: CE
3.4.2, CE 3.3.1 and
CE 3.3.2
PE3.6 Effective team
membership and team
leadership
I managed the accomplishment of
the changes and installment of the
additional machines for the
enhancement in the production
I was assigned as the production
engineer and thus, my contribution
resulted in the positive results for
the overall project
I was under two executives with a
partner by my side and I had to
manage all the individuals from
the lower hierarchy and managed
their roles and responsibilities
within the organization
Career Episode 1: CE
1.4.1, CE 1.4.2
Career Episode 2: CE
2.4.1 and CE 2.4.2
Career Episode 3: CE
3.4.1 and CE 3.4.2
1 out of 10
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.