This summary statement provides an overview of the competency units and elements of a professional engineer and how they have been applied in their career through different episodes. It covers topics such as knowledge and skill base, engineering application ability, ethical conduct and professional accountability, effective communication, creative and innovative demeanour, and orderly management of self and professional conduct.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
PROFESSIONAL ENGINEER
Summary Statement
These are the competency Units and Elements.
Competency Element A brief summary of how you
have applied the element
Paragraph number
in the career
episode(s) where the
element is addressed
PE1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive, theory-
based understanding of the
underpinning natural and
physical sciences and the
engineering fundamentals
applicable to the engineering
discipline
I had executed the project
concentrating on the advanced
model for better data acquisition
of the energy meter through
implementing a platform based on
the Internet of Things (IoT)
I show my concern on this topic
and if some energy is saved from a
single motor than its application
within every industry will be
helpful in saving lots of power and
energy
I had contributed in my team for
developing a “three phase AC
copper” that can provide control
over the frequency and the voltage
too
Career Episode 1: CE
1.2.1, CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE
2.3.1 and CE 2.3.3
Career Episode 3: CE
3.2.1, CE 3.3.1 and
CE 3.3.2
PE1.2 Conceptual I had introduced this project idea Career Episode 1: CE

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
understanding of the
mathematics, numerical
analysis, statistics and
computer and information
sciences which underpin the
engineering discipline
considering the extra effort and
additional employ employed for
the meter that consumes lots of
time for the user and the service
provider
I kept the complexity far away
from the project and tried to
accomplish the goals and
objectives of the project through
allowing every individual in the
team to express their views about
the project constraints
I derived many mathematical
calculations theoretically in
manner to enhance the precision of
the project’s simulation that was
gathered after the establishment of
the control boards
1.3.1
Career Episode 2: CE
2.3.2, CE 2.3.3 and
CE 2.3.4
Career Episode 3: CE
3.3.2
PE1.3 In-depth understanding
of specialist bodies of
knowledge within the
engineering discipline
I had identified that for the
communication purpose between
the devices, IoT can be utilized in
an effective and efficient way and
thus, it can be utilized in this
project
I was responsible for assigning
jobs in the different sectors to each
member and motivating them to
execute the project as per the
Career Episode 1: CE
1.3.1
Career Episode 2: CE
2.3.1, CE 2.3.4, CE
2.2.5 and CE 2.4.2
Document Page
planning made in the earlier stage
I executed the real time
stimulation with the 1200 apart
phase voltage
Career Episode 3: CE
3.3.1, CE 3.3.3
PE1.4 Discernment of
knowledge development and
research directions within the
engineering discipline
I had established the project in two
parts, the first part was to establish
the connection between the LDR
and LED
I had applied my engineering
skills to establish Star to delta
conversation in manner to provide
low voltage to the induction motor
for the start up
I implemented my knowledge and
skills of Instrumentation &
Control Engineering for the
establishment of the control bards
and gather the stimulation results
Career Episode 1: CE
1.2.5, CE 1.3.1 and
CE 1.4.2
Career Episode 2: CE
2.3.2, CE 2.3.4 and
CE 2.4.1
Career Episode 3: CE
3.3.2, CE 3.3.3 and
CE 3.4.1
PE1.5 Knowledge of contextual
factors impacting the
engineering discipline
I had set the goals and objectives
for the project along with the
milestones and schedule
I had identified this as an issue for
the development of my country
and concerning this situation, I
had developed this project that
will be helpful in saving energy
Career Episode 1: CE
1.2.1, CE 1.2.2,
Career Episode 2: CE
2.2.1, CE 2.2.2
Document Page
I implemented my knowledge and
skills of Instrumentation &
Control Engineering for the
establishment of the control bards
and gather the stimulation results
Career Episode 3: CE
3.2.1, CE 3.2.3
PE1.6 Understanding of the
scope, principles, norms,
accountabilities and bounds of
contemporary engineering
practice in the specific
discipline
I had found that time lagging
factor could possibly affect the
output of the project and incorrect
data might be displayed on the
LCD
I managed all the shopping of the
electrical components and
established the as per the designed
network of the circuit
I had used it because it is helpful
in developing complex and high
speed algorithm
Career Episode 1: CE
1.2.3, CE 1.3.3, CE
1.3.4 and CE 1.3.2
Career Episode 2: CE
2.2.3, CE 2.3.1 and
CE 2.3.2
Career Episode 3: CE
3.2.3, CE 3.3.1 and
CE 3.3.2
PE2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of
established engineering
methods to complex
engineering problem solving
I had contributed in this
establishment and data collection
and transmission through the
microcontroller
I had tried to keep my team
motivated towards the goals and
objective of the project the project
as a whole
I had implemented the three-phase
Career Episode 1: CE
1.2.4, CE 1.3.1 and
CE 1.4.2
Career Episode 2: CE
2.3.3, CE 2.3.4 and
CE 2.4.1, CE 2.4.2
Career Episode 3: CE

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
topology that is helpful in
providing variable frequency and
variable voltage control over the
induction motors
3.3.1, CE 3.3.2 and
CE 3.4.2
PE2.2 Fluent application of
engineering techniques, tools
and resources
I had implemented the AT89C51
microcontroller and used Proteus
software that will be helpful in
pulse transmission. We had used
the LCD for the output that will
display the actual meter reading
I developed the circuit design for
the implementation of hardware
components within the system and
also assigned
I had identified the advantageous
factors of the proposed topology
over many traditional methods for
the speed control
Career Episode 1: CE
1.3.3, CE 1.3.2 and
CE 1.3.1
Career Episode 2: CE
2.3.1, CE 2.3.2 and
CE 2.3.3
Career Episode 3: CE
3.3.1, CE 3.3.2 and
CE 3.3.3
PE2.3 Application of
systematic engineering
synthesis and design processes
I had managed the connection of
the microcontrollers output and
input ends in manner to execute a
close circuit for the output display
I had identified that induction
motors are being utilized in most
of the sectors and energy is getting
loss due to inefficient application
of the motors
Career Episode 1: CE
1.2.3, CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE
2.3.3 and CE 2.3.4
Document Page
I was responsible for the stable
connection of the DS1104 boards
with the PC in manner to let my
project partner execute the real
time stimulation in an actual
manner
Career Episode 3: CE
3.2.5
PE2.4 Application of
systematic approaches to the
conduct and management of
engineering projects
I had applied my Instrumental and
Control engineering skills for the
establishment of the connection
I had calculated the values at the
light load and full load condition
for the motor considering the
rating of the motor and equipment
before executing the project
I had supported my partner in the
real time stimulation through
introduce commands those were
unknown to him
Career Episode 1: CE
1.3.1 and CE 1.3.2
Career Episode 2: CE
2.2.3, CE 2.3.1, CE
2.3.2 and CE 2.3.3
Career Episode 3: CE
3.3.1 and CE 3.3.2
PE3 ENGINEERING APPLICATION ABILITY
PE3.1 Ethical conduct and
professional accountability
I had used electronic components
(microcontroller, GPIO, Raspberry
etc.) and software (Proteus) for the
establishment of a wireless
network that can be helpful in
collecting and transmitting the real
time data of the meter reading
along with the price calculation
I had also presented the theoretical
Career Episode 1: CE
1.2.3, CE 1.3.3 and
CE 1.4.1
Career Episode 2: CE
Document Page
result of the project through
mathematical calculations and
output were approximately same
I had identified that establishment
of the network and connectivity of
the control boards, PC and
stimulation was much difficult as
we were not able to operate the
MATLAB
2.2.3, CE 2.3.5 and
CE 2.4.2
Career Episode 3: CE
3.3.3, CE 3.4
PE3.2 Effective oral and
written communication in
professional and lay domains
I had performed the establishment
of connection of the
microcontroller with the energy
meter for the collection off real
time data and LCD output of the
recorded data
I managed the shopping of the
hardware and electronic
components considering low price
and high quality
I had established a topology that
was capable of controlling the
frequency through the application
of buck-boost converter that can
perform boost / buck operation in
manner to transform the input
frequency
Career Episode 1: CE
1.2.3, CE 1.3.3 and
CE 1.4.1
Career Episode 2: CE
2.2.3, CE 2.3.5 and
CE 2.4.2
Career Episode 3: CE
3.3.3, CE 3.4

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
PE3.3 Creative innovative and
proactive demeanour
I had developed the project aiming
at producing a product that can
help the users and electricity
providers communicate relating
the meter readings and electricity
bills without any additional efforts
I was successful in presenting a
model of induction motor that can
be utilized through minimum
consumption of energy
I designed the inductor using
following formula:
L = 1 / 𝐹𝑠𝑤 * 1 / Deli * (Vout +
VD) * {𝑉𝑖𝑛 / (𝑉𝑖𝑛 + 𝑉𝑜𝑢𝑡 +
𝑉𝐷)}
= 1 / 5000 * 1 / 7 * (400 + 0.7)
* {325 / (325 + 400 + 0.7)}
= 512 mH
Career Episode 1: CE
1.3, CE 1.4 and CE
1.4.2
Career Episode 2: CE
2.3.5, CE 2.4, CE
2.2.5 and CE 2.4.2
Career Episode 3: CE
3.2, CE 3.3
PE3.4 Professional use and
management of information
I was responsible for the
implementation of the setup
presented in the above report
including the shopping for the
electrical and electronic
components
We had done research on this
project and after gather
information, we tried to implement
Career Episode 1: CE
1.2.3, CE 1.2.5, CE
1.4.2
Career Episode 2: CE
2.2.3, CE 2.2.5, CE
2.4.2
Document Page
knowledge gathered in our
academics for the successful
development of the project
I had made an approach to present
a new and innovative idea for the
development of a topology that
can measure the speed of the
induction motor in more effective
manner
Career Episode 3: CE
3.2.3, CE 3.2.5, CE
3.4.2
PE3.5 Orderly management of
self, and professional conduct
I had searched the products online
and compared it on various
electronic counters at the market
to buy the products at low price
I had done the mathematical
calculation at the light load
condition and full load condition
I executed the real time
stimulation with the 1200 apart
phase voltage. I implemented my
knowledge and skills of
Instrumentation & Control
Engineering
Career Episode 1: CE
1.4.1, CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE
2.4.2, CE 2.3.2, CE
2.3.3 and CE 2.3.4
Career Episode 3: CE
3.4.2, CE 3.3.1 and
CE 3.3.2
PE3.6 Effective team
membership and team
leadership
I had developed the project
concerning an innovative product
for the common people at low
budget
We tried to develop an innovative
Career Episode 1: CE
1.4.1, CE 1.4.2
Career Episode 2: CE
Document Page
approach for the organizations and
industries to save energy without
hampering the performance or
output
I executed most of the codes over
the PC in manner to gather he
stimulation results
2.4.1 and CE 2.4.2
Career Episode 3: CE
3.4.1 and CE 3.4.2