TASK 13 1.1 Group activities and project development in the construction industry

Develop a creative design solution for a college site with 6 departments, library, and laboratories, focusing on maximizing space utilization and using sustainable building materials and methods. Incorporate new technologies and innovative design methods. Identify group roles, responsibilities, and activities. Formulate project specifications including technical specifications, constraints, legislation, standards, and codes.

23 Pages5023 Words313 Views
   

Added on  2020-02-14

About This Document

PROJECT IN THE CONSTRUCTION INDUSTRY TABLE OF CONTENTS INTRODCUTION 3 TASK 13 1.1 Plan group roles and activities3 1.2 Formulation of specification with respect to constraint 5 1.3 Formulate initial proposal 6 TASK 28 2.1 Documentary evidence of product development 8 2.2 Developing final design proposal to meet agreed specification 9 TASK 310 3.1 Evaluating project making recommendation for improvement10 TASK 412 4.1 Records of project development and group activity 12 || 4.2 Solution for project19 CONCLUSION 20 REFERENCE

TASK 13 1.1 Group activities and project development in the construction industry

Develop a creative design solution for a college site with 6 departments, library, and laboratories, focusing on maximizing space utilization and using sustainable building materials and methods. Incorporate new technologies and innovative design methods. Identify group roles, responsibilities, and activities. Formulate project specifications including technical specifications, constraints, legislation, standards, and codes.

   Added on 2020-02-14

BookmarkShareRelated Documents
PROJECT IN THE CONSTRUCTIONINDUSTRY
TASK 13 1.1 Group activities and project development in the construction industry_1
TABLE OF CONTENTSINTRODCUTION...........................................................................................................................3TASK 1............................................................................................................................................31.1 Plan group roles and activities...............................................................................................31.2 Formulation of specification with respect to constraint........................................................51.3 Formulate initial proposal......................................................................................................6TASK 2............................................................................................................................................82.1 Documentary evidence of product development...................................................................82.2 Developing final design proposal to meet agreed specification............................................9TASK 3..........................................................................................................................................103.1 Evaluating project making recommendation for improvement...........................................10TASK 4..........................................................................................................................................124.1 Records of project development and group activity............................................................124.2 Solution for project..............................................................................................................19CONCLUSION..............................................................................................................................20REFERENCES..............................................................................................................................22
TASK 13 1.1 Group activities and project development in the construction industry_2
INTRODCUTIONProject management is the one of the most important method that is used to evaluate theproject. There are number of methods that are used in the project management to track progressthat is happening in the project and sequence that must be followed to implement the project. Inthe current report, project specification and proposal is prepared in detail. Documentary evidenceare also prepared in respect to the current project. Final design proposal is also prepared in thereport. It can be said that varied aspects of the project are covered in the report. In middle part ofthe report evaluation of project is done. In this regard project initial and final proposal isanalyzed. On that basis conclusion is formed and ideas are identified that must be followed inorder to improve the project. It can be said that project work is carried out in systematic way. Inthis way entire research work is carried out. TASK 11.1 Plan group roles and activitiesGroup roles, responsibility and activity are explained below.Group A orBActivitiesRoles ResponsibilityMeetingminutesAssessmentcriteriaGroup ACollectionof datafromsecondarysourcesGroup Amemberswillcollectiondata fromvariedbooks,journals andmagazines.Group A will beresponsible toensure that fromonly relevant andreliable sourcesdata will begathered.180 Minutes.Testing ofdata will bedone bymatchingcontent withotherliterature.AnalysisofsecondarydataGroup Amemberswill play animportantrole inanalyzingGroup Amembers will beresponsible forensuring thatsecondary datawhich is analyzed60 minutes.Same asabove.
TASK 13 1.1 Group activities and project development in the construction industry_3
thesecondarydata. is highly reliablein nature. Group BCollectionof datafromprimarysourcesGroup Bmemberswill be playan importantrole incollection ofprimary data.Group Bmembers will beresponsible forensuring thatauthenticresponse is givenbytherespondents. 120 minutesAll dataentries will bechecked andif there aresome missingvalues samewill berectified.Apart fromthis onanalysis ofdata it isidentified thatrespondentfill wronganswers thensame will berectified.Analysisof primarydataGroup Bmemberswill play animportant inrole analysisof data.Group B will beresponsible forlook after properanalysis of data.120 minutes.Same asabove.Combinedwork ofgroup A andBFormationof reportGroup A andB will playan importantrole information ofGroup A and Bwillberesponsible forensuring that allresearch related40 minutesIt will beensured thatin properformat reportis prepared.
TASK 13 1.1 Group activities and project development in the construction industry_4
combinedreport.findings arecovered in thereport.1.2 Formulation of specification with respect to constraintSpecification of the project and roles and activities of groups are explained below.Technical specification: In the construction project of building varied tools and materialswill be used. Under this there will be need to purchase stones, bricks and floor tiles likemarble etc. There will be need to purchase RCC and other fixtures. It is very important topurchase all these specifications of best quality from the reliable supplier (Shen and et.al.,2010). This will ensure that building will be prepared in systematic way with proper sortof raw material. It is very important to use raw material up to particular level of quality inthe construction of the project because if same will be done then in that case building willbe construct in better way. It can be said that there is huge significance of purchasing rawmaterial up to specific quantity and quality. Constraint: Cost is the one of the major constraint in context of the current project. Thisis because it is well known fact that cost of the items that are purchased keeps onchanging consistently. Thus, it is very difficult task to control cost in the business.Environment factor is another variable that acts as constraint in case of the constructionproject. It must be noted that environment changed suddenly and with change in sameoperations get hampered (Harris and McCaffer, 2013). Like if storm comes in existencethen in that case it become very difficult to perform construction related operations insystematic manner. Planning is another constraint that affect entire project. It must benoted that once planning is prepared and then situation if changed then in that case it isvery hard to change entire plan (Robichaud. and Anantatmula, 2010). Thus, these are theconstraints in respect to current project. It is very important to follow constraints inproper manner because same create hindrance in success of any project. If same will beaddressed in systematic way then project can be completed on time and huge profit canbe earned on same.
TASK 13 1.1 Group activities and project development in the construction industry_5
Legislation: There are some rules and regulations that need to be considered in respectdevelopment of the building on the site. Quality control methods will be used to ensurethat all the operations that are performed are relevant and are performed in best way bythe managers. Multiple quality control management methods like total qualitymanagement can be applied in the business and it can be ensured that best quality of workis done at the workplace (Harris and McCaffer, 2013). In order to ensure that employeesare healthy and safe at workplace appropriate number of safety equipment’s will beprovided to the employees at the workplace. Market research and feasibility: Market research will be conducted and under thisspecific region in which building is proposed to be in construction detail investigationwill be done. Under this, data related to number of houses purchased and of value will begathered from varied sources (Kerzner, 2013). By doing so it will be ensured that there isdemand for the product in the market. Feasibility test will also be done and it will beidentified whether it is possible carry out project in terms of cost and profit. Building for residential or commercial purpose: Group members will make an attemptto identify whether it will be better to prepare building or same must be given on rent. Inthis regard some team members will do market research on the rented property thatcomes in residential category. On other hand, some people will be market research oncommercial property and on that basis it will be identified that which option is mostsuitable. 1.3 Formulate initial proposal In order to prepare the current project there are varied areas where there is need to paydue attention. One of these areas are materials, sustainability, environment, cost and newtechnology must be taken in to consideration.Materials: Material for construction of project will be purchased from the suppliers thatare located in different locations (Huang, 2011). For each product contact will beestablished with different sort of suppliers that are specialized in the specific product.From such kind of suppliers all products will be purchased in bulk and in this waydiscount will be obtained from the suppliers. In this way, material will be purchased atlow price from the suppliers. Contract will be signed with the suppliers and under this forspecific time period goods will be purchased at low price for specific duration. This will
TASK 13 1.1 Group activities and project development in the construction industry_6

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Group Project in the Construction Industry
|33
|11099
|53

Analysis of Air Traffic Passenger Movement Data for Forecasting
|3
|588
|293

Evaluation of Investment Proposals
|23
|5030
|79

Business Capstone Project : Assignment
|4
|442
|270

Dementia Policy and Government Support: A Research Project
|16
|3476
|1

Replace Air-conditioning System in 20 Storey Commercial Building : Project
|34
|8917
|107