Automatic Wireless Health Monitoring Report System

Verified

Added on  2023/04/11

|15
|1935
|457
AI Summary
This project aims to develop an automatic health monitoring report system to address challenges in the healthcare industry caused by the use of cloud computing technology. The system will track the health of patients automatically and provide secure storage of health records. The project will utilize qualitative research methodology and agile system design methodology. The risks associated with the project will be analyzed and mitigated. The project has a duration of 52 days.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: PROJECT MANAGEMENT
Emerging technology and Innovation
Name of the Student
Name of the University
Author’s Note

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1
PROJECT MANAGEMENT
Table of Contents
1. Title........................................................................................................................................3
1.1 Project Blog......................................................................................................................3
1.2 Weekly Progress Reports Plan.........................................................................................3
2. Rationale................................................................................................................................3
2.1 Problem domain...............................................................................................................3
2.2 Purpose and justification..................................................................................................3
3. Supervisor Approval..............................................................................................................4
4. Research Questions................................................................................................................4
4. Conceptual or Theoretical Framework...................................................................................4
6. Methodology..........................................................................................................................5
6.1 Analysis of sources of information..................................................................................5
6.2 Research method(s)..........................................................................................................5
6.3 Data collection or systems design methods.....................................................................5
6.4 Ethical Issues....................................................................................................................6
6.5 Compliance Requirements...............................................................................................6
7. Project Plan............................................................................................................................6
7.1 Deliverables......................................................................................................................6
7.2 Work breakdown structure (WBS)...................................................................................7
7.3 Risk Analysis...................................................................................................................8
7.4 Duration..........................................................................................................................12
7.5 Gantt chart......................................................................................................................13
Bibliography.............................................................................................................................14
Document Page
2
PROJECT MANAGEMENT
1. Title
1.1 Project Blog
https://wirelesstechnologycom.wordpress.com/
1.2 Weekly Progress Reports Plan
<Please provide the progress reports plan as per assignment 2>
2. Rationale
2.1 Problem domain
The project mainly reflects on the development of automatic wireless health
monitoring report. It is found that wireless technology is considered as one of the prominent
technologies in the field of networking and with the advancement in the features, the
technology has generally improved the entire picture of networking. It is identified that cloud
computing has generally provided different types of benefits in order to support the entire
health care industries. However, there are a number of challenges that cloud computing
poses to the health care industry. Security is considered as one of the major concern in the
healthcare industries as the health care industries hold important information of the patients.
In addition to this, the other types of challenges includes vendor stability, incompatibility as
well as absence of IT skills.
Document Page
3
PROJECT MANAGEMENT
2.2 Purpose and justification
The main aim of the project is to develop an automatic health monitoring report
system in order to resolve the challenges that the healthcare industry faces due to the
utilization of cloud computing technology. It is found that with the development of wireless
automatic healthcare monitoring report system is used for tracking the health of the patients
automatically by providing proper security to the health records of the patients. Moreover, the
automatic health monitoring report system are considered to be much more compatible.
3. Supervisor Approval
It is found that for the development of automatic health monitoring system, it is very
much necessary to get approval from the supervisor of the organization for initiating with the
work of the project.
4. Research Questions
The research questions that are mainly related with the project are generally listed below:
1. What are the latest technologies that are used in monitoring the implications of cloud
computing in the healthcare system?
2. What are the limitations of cloud computing in the healthcare industry?
3. What are the problems that are faced by utilizing cloud computing technology in the
healthcare industry?
4. Conceptual or Theoretical Framework
According to Botta et al. (2016), cloud computing security related issues are present
within the healthcare industries as well as hospitals as they generally hold important
information and therefore it is necessary to provide proper security. Furthermore, the
healthcare industries are facing number of issues as well as challenges due to the risk of

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
PROJECT MANAGEMENT
losing important data as well as information (Varma et al., 2015). Furthermore, due to the
utilization of cloud computing, the health care industries needs to figure out what are needed
to be upgraded and its importance.
On the other hand, it is found that automatic wireless health monitoring report system
is considered as one of the main advanced innovative technology that helps in analyzing the
health condition of the patients and automatically generates report. The sensors are utilized
for checking the health condition of the patients (Zhang, Kurata & Lynch, 2016). It is found
that the system helps in focussing on the condition where the patients as well as doctors are at
remote locations and it is quite important to provide the entire data of the patient to the
doctor. In addition to this, it is found that the automatic health monitoring report system helps
in reducing the gap that exists between the patients and the doctors and it further helps in
providing proper performance as the operation of the system is very much simple as well as
easy (Hussein et al., 2018). Furthermore, it is found to be quite portable, simple as well as
proper understanding about the operation of the system will generally help both the patients
and the doctors.
6. Methodology
6.1 Analysis of sources of information
It is identified that number of information as well as data about the significance as
well as benefits of health monitoring report system is identified with the help of articles and
scholarly journal papers.
6.2 Research method(s)
Qualitative research method is mainly utilized for reviewing various types of journal
papers as well as articles for collecting detailed information about the importance of wireless
health monitoring report system and the benefits that are provided by the system (Fletcher,
Document Page
5
PROJECT MANAGEMENT
2017). The main reason behind the selection of qualitative methodology is that it helps inn
providing detailed as well as in-depth information about the new system that is needed to be
used in the healthcare industry.
6.3 Data collection or systems design methods
The paper utilizes secondary data collection methodology for collecting important
information and details that are mainly associated with the development of health monitoring
report system (McCusker & Gunaydin, 2015).
Agile system design methodology is mainly selected in order to develop the wireless
automatic health monitoring report system. It is found that the agile team mainly work as a
unit and then properly react on various types of inevitable changes which generally comes
with the entire project. The ability of work is generally enhanced with the help of agile
methodology by properly presenting the data in a quite visual way.
6.4 Ethical Issues
The different types of ethical problems as well as challenges that generally occur
within the entire project are generally listed below:
Pressurized workers: If the project team are pressurized to work after their shift time
then it would create number of ethical problems in the project.
Conflict of interest: If the interest of the workers generally clashes then it can create
number of issues as well as problems within the project.
Various safety standards: If the project managers are unable to utilize proper safety
standards for maintaining proper working condition then it generally can cause number of
issues as well as problems in the project.
Document Page
6
PROJECT MANAGEMENT
6.5 Compliance Requirements
It is quite important for the organization to follow work health and safety act in order
to maintain proper working conditions for the project team and for avoiding any type of
major issues as well as health concerns within the entire project.
7. Project Plan
7.1 Deliverables
The deliverables of the project are mainly listed below:
Journal paper
Project plan
Annotated bibliography
Risk management plan and
Project plan
7.2 Work breakdown structure (WBS)
The work breakdown structure for the development of automatic wireless health
monitoring report system is mainly provided in the table that is given below:
WBS Task Name
0 Automatic Wireless Health Monitoring Report system
1 Initiation phase
1.1 Determining the problem
1.2 Identification of solution
1.3 Business case development
1.4 Undertaking feasibility check
1.5 Establishing project charter

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
7
PROJECT MANAGEMENT
1.6 Appointing team members
1.7 Milestone 1: Completion of initiation phase
2 Planning phase
2.1 Project plan development
2.2 Resource plan development
2.3 Financial plan development
2.4 Quality plan development
2.5 Risk management plan
2.6 Milestone 2: Completion of planning phase
3 Designing phase
3.1 Developing the use case diagram
3.2 Designing the system
3.3 Approval of project design
3.4 Milestone 3: Completion of system design
4 Development phase
4.1 Using transformer
4.2 Bridge rectifier
4.3 LCD display, blocking diode
4.4 RF module
4.5 Development of the system
4.6 Testing
4.7 Milestone 4: Completion of the development phase
5 Closure phase
5.1 Stakeholder sign off
Document Page
8
PROJECT MANAGEMENT
5.2 Project documentation
5.3 Post project review
5.4 Milestone 5: Completion of closure phase
7.3 Risk Analysis
The risks that are associated with the project are listed in the table below with proper
risk mitigation strategies.
Risk Description Impact Probability Mitigation
Schedule
slippage
If the project
schedule is not
managed
properly then it
can cause delay
in completion of
the project.
High High Tracking the
schedule on a
weekly basis
helps in
ensuring that
the schedule is
on track and it
will get
completed on
time as per the
assumption.
Lack of budget If the budget of
the project is
not managed
then it generally
High High The expenses
that are done on
project
activities must
Document Page
9
PROJECT MANAGEMENT
cause number of
financial
problems within
the project.
be tracked for
keeping the
budget on track.
Inexperienced
team
As the project
team is not
experienced
therefore they
face number of
problems as
well as issues in
completing the
project.
Medium Medium Proper facility
of training must
be arranged for
the project team
so that they can
be able to work
effectively.
Technical issue If testing of the
system is not
done properly
then the chances
of occurring
technical issue
within the
project is quite
high.
High High It is quite
necessary to
conduct testing
after the
development of
the system for
checking
whether the
system is
working or not.
Improper
management
If the project
managers are
Medium Medium It is quite
necessary to

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10
PROJECT MANAGEMENT
unable to
manage the
project then it
will create
number of
challenges in
completing the
entire project on
time.
utilize project
Document Page
11
PROJECT MANAGEMENT
7.4 Durati 936547
on
The figure that is provided below reflects that around 52 days is needed in order to
complete the work of the project.
Figure 1: Schedule
(Source: Created by Author)
Document Page
12
PROJECT MANAGEMENT
7.5 Gantt chart
Figure 2: Gantt chart
(Source: Created by Author)

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
13
PROJECT MANAGEMENT
Bibliography
Botta, A., De Donato, W., Persico, V., & Pescapé, A. (2016). Integration of cloud computing
and internet of things: a survey. Future generation computer systems, 56, 684-700.
Fletcher, A. J. (2017). Applying critical realism in qualitative research: methodology meets
method. International Journal of Social Research Methodology, 20(2), 181-194.
Hornstein, H. A. (2015). The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2),
291-298.
Hussein, A. F., Burbano-Fernandez, M., Ramírez-González, G., Abdulhay, E., & De
Albuquerque, V. H. C. (2018). An automated remote cloud-based heart rate variability
monitoring system. IEEE Access, 6, 77055-77064.
Kaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management
beyond project selection techniques: Understanding the role of structural
alignment. International Journal of Project Management, 33(1), 126-139.
McCusker, K., & Gunaydin, S. (2015). Research using qualitative, quantitative or mixed
methods and choice based on the research. Perfusion, 30(7), 537-542.
Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), 278-290.
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D.
(2015). Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Document Page
14
PROJECT MANAGEMENT
Varma, N., Piccini, J. P., Snell, J., Fischer, A., Dalal, N., & Mittal, S. (2015). The
relationship between level of adherence to automatic wireless remote monitoring and
survival in pacemaker and defibrillator patients. Journal of the American College of
Cardiology, 65(24), 2601-2610.
Zhang, Y., Kurata, M., & Lynch, J. P. (2016). Long-term modal analysis of wireless
structural monitoring data from a suspension bridge under varying environmental and
operational conditions: System design and automated modal analysis. Journal of
Engineering Mechanics, 143(4), 04016124.
1 out of 15
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]