Running Head: PROJECT MANAGEMENT AND SYSTEM ENGINEERING Project Management and System Engineering Name of the Student Name of the University
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT MANAGEMENT AND SYSTEM ENGINEERING Answer to 1 The retail industry mainly involves purchase of products from the wholesalers and sale of the products to the customers at higher prices. In Abu Dhabi, the retail industry is generally handled manually including keeping track of purchase from wholesaler, pending payments to the wholesaler, inventory update, tracking sales and others. In spite of very efficient handling, numerous errors occur and they result in errors in accounting process. The implementation of information system can help resolve this issue and will result in an efficient and effective system free of human errors as well as faster operations. Hence, this project has been proposed for implementing information system in the retail industry in Abu Dhabi. The features of the information system will include accounting, payment processing, record keeping and others. Answer to 2 The project schedule and cost are shown in the following table. Task NameDurationStartFinishCost Implementation of Information System in Abu Dhabi Retail Industry 66 daysMon 4/15/19Mon 7/15/19$54,180.00 Requirement Gathering6 daysMon 4/15/19Mon 4/22/19$6,000.00 Define Business Requirements2 daysMon 4/15/19Tue 4/16/19$2,000.00 Define System Requirements2 daysWed 4/17/19Thu 4/18/19$2,000.00 Receive Approval to Proceed2 daysFri 4/19/19Mon 4/22/19$2,000.00
2PROJECT MANAGEMENT AND SYSTEM ENGINEERING Project Planning8 daysTue 4/23/19Thu 5/2/19$4,800.00 Define Project Scope2 daysTue 4/23/19Wed 4/24/19$1,200.00 Develop Project Charter2 daysThu 4/25/19Fri 4/26/19$1,200.00 Estimate Schedule1 dayMon 4/29/19Mon 4/29/19$600.00 Estimate Budget1 dayTue 4/30/19Tue 4/30/19$600.00 Finalize Project2 daysWed 5/1/19Thu 5/2/19$1,200.00 Information System Development27 daysFri 5/3/19Mon 6/10/19$24,500.00 Procure Hardware4 daysFri 5/3/19Wed 5/8/19$7,400.00 Procure Software3 daysThu 5/9/19Mon 5/13/19$4,300.00 Development of the Information System 15 daysTue 5/14/19Mon 6/3/19$9,600.00 Addition of Features5 daysTue 6/4/19Mon 6/10/19$3,200.00 System Testing16 daysTue 6/11/19Tue 7/2/19$10,880.00 Performance Testing5 daysTue 6/11/19Mon 6/17/19$3,200.00 UI Testing5 daysTue 6/18/19Mon 6/24/19$3,200.00 Usability Testing5 daysTue 6/25/19Mon 7/1/19$3,200.00
3PROJECT MANAGEMENT AND SYSTEM ENGINEERING Handover1 dayTue 7/2/19Tue 7/2/19$1,280.00 Closing9 daysWed 7/3/19Mon 7/15/19$8,000.00 Documentation5 daysWed 7/3/19Tue 7/9/19$3,000.00 Review and Appraisal3 daysWed 7/10/19Fri 7/12/19$4,000.00 Sign Off1 dayMon 7/15/19Mon 7/15/19$1,000.00 The cost of the project is calculated from the following rates for human and material resources. Resource NameTypeMax. UnitsStd. Rate Project ManagerWork100%$125.00/hr Project SupervisorWork100%$75.00/hr DeveloperWork100%$80.00/hr TesterWork100%$80.00/hr Hardware CostsMaterial$5,000.00 Software CostsMaterial$2,500.00 Additional CostsMaterial$1,000.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4PROJECT MANAGEMENT AND SYSTEM ENGINEERING Answer to 3 The work breakdown structure is presented as follows. Figure 1: Work Breakdown Structure of the Project (Source: Created by Author) Answer to 4 The objective analysis tree for the project is shown in the following diagram.
5PROJECT MANAGEMENT AND SYSTEM ENGINEERING Figure 2: Objective Analysis Tree (Source: Created by Author) Answer to 5 The various design types of a system that will be implemented in a project are as follows. Conceptual Design Preliminary Design Detail Design In this case, the project is planned based on conceptual design as it is neither finalized nor already developed. Now for the conceptual design of the system, the proposed functions that are desired from the system are as follows. Accounting– One major feature needed is accounting. The retailers need to keep track of payments for wholesalers as well as the revenue generated from the sales of the products. The system is expected to take entries of purchases and sales and automatically update the financials accordingly. Inventory Management– This feature uses data from the accounting feature i.e. the system is expected to take entries of purchases and sales and automatically update the inventory accordingly. The functional flow diagram is shown as follows.
6PROJECT MANAGEMENT AND SYSTEM ENGINEERING Information System Entry of Sales DataEntry of Purchase Data Update Inventory Update Finance Account Update Inventory Update Finance Account Figure 3: Functional Flow Diagram (Source: Created by Author) The system specifications considering one information system for a retailer are as follows. 1 Computer with updated technical specifications (RAM, Hard Disc, etc.) Cloud Subscription Accounting Software Inventory Tracking Software Business Information Portal Firewall
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7PROJECT MANAGEMENT AND SYSTEM ENGINEERING For implementing the specifications provided, the retailer needs to purchase a new computer or upgrade the technical specifications if it already owns one. Various types of software as mentioned above are also required for performing various functions that have been described earlier. Appointing a technical expert is the most suitable way to handle this problem and ensure the requirements are correctly gathered for the project.
8PROJECT MANAGEMENT AND SYSTEM ENGINEERING Bibliography Harrison, F. andLock,D., 2017.Advancedprojectmanagement:astructuredapproach. Routledge. Joslin, R. and Müller, R., 2015. Relationships between a project management methodology and projectsuccessindifferentprojectgovernancecontexts.InternationalJournalofProject Management,33(6), pp.1377-1392. Kerzner, H. and Kerzner, H.R., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Lock, D., 2017.The essentials of project management. Routledge. Todorović, M.L., Petrović, D.Č., Mihić, M.M., Obradović, V.L. and Bushuyev, S.D., 2015. Projectsuccessanalysisframework:Aknowledge-basedapproachinproject management.International Journal of Project Management,33(4), pp.772-783. Winter, R. and Chaves, M.S., 2017. Innovation in the management of lessons learned in an IT project with the adoption of social media.International Journal of Innovation: IJI Journal,5(2), pp.156-170.