Setting up a relaxation area at ECU Joondalup adjacent

Create a comprehensive project plan for setting up a student relaxation area at ECU Joondalup adjacent to the Pines cinema.

23 Pages3215 Words62 Views
   

Added on  2023-03-17

About This Document

This paper discusses the process of setting up a relaxation area at ECU Joondalup adjacent to Pine Cinemas. It covers requirement gathering, estimation, work breakdown structure, risk analysis, Gantt chart, and schedule. The project will be completed within 107 days with a budget of $321,880.

Setting up a relaxation area at ECU Joondalup adjacent

Create a comprehensive project plan for setting up a student relaxation area at ECU Joondalup adjacent to the Pines cinema.

   Added on 2023-03-17

ShareRelated Documents
Running head: PROJECT MANAGEMENT
Project management: Setting up a relaxation area at ECU Joondalup adjacent
Name of the Student
Name of the University
Author’s Note
Setting up a relaxation area at ECU Joondalup adjacent_1
1
PROJECT MANAGEMENT
Table of Contents
1. Project overview.................................................................................................................2
2. Requirement gathering........................................................................................................2
3. Estimation...........................................................................................................................3
4. Work breakdown structure..................................................................................................7
5. Risk analysis.......................................................................................................................8
6. Gantt chart and schedule...................................................................................................11
6.1 Gantt chart......................................................................................................................11
6.2 Schedule.........................................................................................................................13
7. Critical path.......................................................................................................................16
8. Critical chain.....................................................................................................................17
9. Cost baseline including contingencies..............................................................................18
9.1 Baseline commensurate with WBS and Gantt chart..................................................18
9.2 S-curve demonstration...............................................................................................19
10. Cash flow forecast.........................................................................................................19
Bibliography.............................................................................................................................21
Setting up a relaxation area at ECU Joondalup adjacent_2
2
PROJECT MANAGEMENT
1. Project overview
The paper mainly reflects on set up of a relaxation area at ECU Joondalup that is
adjacent to the Pine Cinemas. It is found that the project that is mainly undertaken generally
needs permanent seating area, shades, paving, bins, lightening as well as a sand volleyball
court. It is found that the relaxation area set up will be completed successfully within the time
period of 107 days by utilizing budget of around 321,880.
2. Requirement gathering
The requirements that are associated with the project are generally gathered with the
help of the methods that are mainly illustrated below:
Brainstorming: Brainstorming is one of the requirement gathering method that is
mainly utilized in order to gather ideas from different group of people so that the relaxation
area that is set up in the Joondalup area can meet the needs and requirements of the clients
(Hornstein, 2015). In addition to this, the brainstorming method is mainly utilized in order to
determine ways that are very much important for successfully achieving success from the
project.
Survey: Survey is also undertaken in order to gathering ideas as well as views of the
customers about the setup of a relaxation area in Joondalup in order to design the area in such
a way that it would provide proper service to the customers by meeting the requirements of
the customers.
Interview: Interviewing the users as well as stakeholders are considered as one of the
important as well as critical step in order to gather requirements for the project set up
(Badewi, 2016). It is identified that without proper information as well as knowledge about
the project goals and objectives, it is quite difficult to satisfy the customers by fulfilling their
needs and requirements.
Setting up a relaxation area at ECU Joondalup adjacent_3
3
PROJECT MANAGEMENT
3. Estimation
It is found that the budget of the project “setting up relaxation area at ECU Joondalup”
will be estimated with the help of three point estimation technique. The three point estimation
is one of the tool that is utilized for cost estimation for increasing the accuracy of the cost
estimation (Kerzner & Kerzner, 2017). The three point estimation generally includes three
types of estimation that include optimistic estimate, pessimistic estimation as well as most
likely estimation. As per the three point estimation technique, it is found that budget of
around $319959 is generally required for setting up the relaxation area near the Pines
Cinema.
Activities Optimistic
estimate
Pessimistic
estimation
Most likely
estimation
Three point
estimation
(Mean)
Setting up
relaxation area at
ECU Joondalup
$316048 $321950 $3,21,880
$319959
Requirement
gathering
940 1000 960
967
Analysis of
project
1200 1,300.00 1280
1260
Resource
estimation
900 960 960
940
Estimating
project schedule
1150 1250 1200
1200
Budget
estimation
1200 1300 1280
1260
Manpower 900 1000 960 953
Setting up a relaxation area at ECU Joondalup adjacent_4
4
PROJECT MANAGEMENT
estimation
Resource
estimation
1200 1390 1280
1290
Fund
procurement for the
project
1200 1300 1280
1260
Stakeholders
appointment
1780 1820 1800
1800
Meetings
arrangement
1570 1650 1600
1607
Financial
management
1900 2000 1920
1940
Appointment of
workers
1900 1940 1920
1920
Preparation of
blueprint
1400 1500 1440
1447
Procurement of
land area
1790 1890 1800
1827
Release of legal
notice
1900 2000 1920
1940
Budget
allocation
2800 2880 2880
2853
Resource
procurement
1780 1890 1800
1823
Division of
time
1400 1500 1440
1447
Duty allocation 1578 1650 1600 1609
Setting up a relaxation area at ECU Joondalup adjacent_5
5
PROJECT MANAGEMENT
Analysis of risk 1070 1100 1080 1083
Preparing risk
mitigation plan
1070 1100 1080
1083
Site preparation 6400 8000 7200 7200
Land
preparation
8600 9000 8640
8747
Installation of
lightening
including electrical
supplier
4140 4200 4160
4167
Installation of
gas lines and
barbeques
62100 63000 63200
62767
Seating
arrangement
98120 98000 98640
98253
Bricks
application
4500 4800 4680
4660
Volleyball court 59,000 70,080 60080 63053
Paving 5800 6000 5760 5853
Concrete
application
11900 1300 12960
8720
Colour
application
4900 4700 4680
4760
Needed system
implementation
3200 3200 3200
3200
Application of 2800 2890 2880 2857
Setting up a relaxation area at ECU Joondalup adjacent_6

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management Plan for Employee Lounge Project
|16
|2062
|430

Cost and Quality Management in Project Management
|14
|1891
|500

Project Management Assignment - Bespoke System
|15
|1660
|61

The Project Costing System
|14
|1374
|60

Project Management: Online Simulation Game
|32
|4685
|297

Project Management: Tools and Techniques for Cost Estimation and Cost Management
|20
|3841
|257