Project Management for QAHE London Campus Redevelopment
Verified
Added on 2023/06/08
|13
|2713
|387
AI Summary
This report covers project management strategies for QAHE London Campus redevelopment including stakeholder analysis, risk management, critical path analysis, and agile methodology. It also includes a detailed project plan, required resources, and evaluation of research methodology.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents INTRODUCTION...........................................................................................................................3 Detailed Project Plan........................................................................................................................3 Overview of Project................................................................................................................3 An analysis of stakeholders and their requirements...............................................................3 An analysis of required resources to facilitate the project.....................................................5 An assessment of risks of the plan.........................................................................................5 A critical Path analysis of the project including a Gantt Chart representing timescales of the project.....................................................................................................................................8 An outline of the supporting documentation/forms..............................................................10 An evaluation of research methodology to determine stakeholder satisfaction with the project. .11 CONCLUSION..............................................................................................................................12 REFERENCES..............................................................................................................................13
INTRODUCTION The concept of project management is referred to the practice of formulating, executing and controlling the plans along with closing of teamwork in order to accomplish set goals within defined period of time. Generally, it is considered as an application of techniques, skills and knowledge that is associated with project operations to meet project aspirations. This project is based on QAHE which wants to improve its space that is being given to business students. In order to do so, redevelopment as well as restoration has to be executed in London Campus. This issignificantforapparatusmanagementdepartmentformakingsurethatteachingis discontinuoued meanwhile whole process(Bjorvatn and Wald, 2018). There will be project initiation document and many other aspects such as budget, stakeholder analysis, timescale as well as breakdown structure. Additionally, this report also covers risk register and structured interaction with methodology which for execution of the study of project. Detailed Project Plan Overview of Project The overview of the existing project is based on the QA Higher Education and this university is engaged in conducting a project in which its key objective is to improve the space for business students. So as to surround the students with an environment that is suitable for the purpose of learning within the existing as well as modern age, QAHE has framed the decisions for refurbishing its London Campus. In such kind of the project, the project manager is required to redevelop and refurbish within the area of London Campus. This university is conducting distinct kinds of arrangement for the purpose of creating better as well as effective teaching space for the students of the business(Dinnik, Grigoryeva and Galoyan, 2019). The project will effectively and efficiently integrate the related project organisation as well as management with Agile product management methodology for achieving higher efficiency. An analysis of stakeholders and their requirements The process of recognising the individuals before the commencement of the project and grouping them as per their levels of involvement, interest as well as influence within project along with determining foremost way to include and transmit each of these stakeholder groups overall referred to stakeholder analysis. There are different kinds of stakeholders tat exist within an organisation and these include suppliers, directors, members and many more. Among such
stakeholders, some of them acts as a significant asset for business. This must be maintained and managed by them in an efficacious and related manner. The stakeholder analysis of QAHE has been given as under: StakeholderWhy they are interested in project Whether they are for or against the project of the firm GovernmentIt has interest because this will enable university for developing more students number as proper spacewillbethere(Filippetto, Lima and Barbosa, 2021) Government is in favour as maximum number of youths can have impelling knowledge. DonorsTheseconsistofemployees, trustees,researchcouncilsand manymore.Suchpeoplehave interestinthisbecauseitwill allow them to get more students within classroom. Such kinds of stakeholders have high power and high interest and therefore are in favour of such refurbishment. Because it will enable them in having greater amount of profit. SuppliersThese stakeholderswill provide Universitywithrawmaterials such as cement, bricks and so on bywhichprocessof redevelopment can be carried out effectively. Thiswillpermittheminattaining higher levels of profitability through providing QAHE with proper resources (Guo and Zhang, 2022). University HeadSuchstakeholdershavehigh interest within the processes and operations which are executed as they will be able to verbalise well qualifiedindividualsfromtheir university. They are in the favour of this project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
An analysis of needed resources to ease the project There are multiple kinds of resources that are needed to facilitate the project and the analysis of these resources is given as under: Human Resources:These kinds of resources consist of the members of the team or employees of the business who are involved in the process of accomplishing the desirables of the project. The project manager must ensure that these resources should be productive, effective and efficient. Financial Resources:Such types of resources include the budgets of the project and the cost that are associated with different activities of the project(Hair and Sarstedt, 2021). This kind of resource makes sure that whether the projects gets completed in the current cost of the project or within the allocated budget. Material Resources:These are another kinds of resources that are required within the process of project completion and these resources involve raw materials like cement and bricks, machine tools, equipment, resource management software and many more. These resources ensure the capability or availability of such kinds of equipment. Time Resources:Within such types of resources, the planning of the project takes place along with the scheduling of project as well as time invested to complete each and every activity of the project(Heigermoser and et.al., 2019). An assessment of risks of the plan The major types of risks that are concerned with the project are described as under: RiskMitigation action Contingency action Pre action score (out of 10, where 10 is high and 1 is low) Post action score (out of 10, where 10 is high risk and 1 is low) Budget RiskWithinthis, organisation plans regardingthe expendituresof the project. Toovercome suchrisk,the businesscanuse riskmanagement andbudget planningfor 46
achieving expected outcomes. Integration riskThe risk includes integrationof technologiesand information processes.For improvingspace inrelationto respective company,they wantto refurbishment. Hence, by mainly chackingthe systemthatthey areintegrated with one another ornotcanbe determined. Theconcerned riskwithproject isintegration throughmaking use of IT systems that is vital piece ofactivities facilitatein integrating different processes favourably. 64 Resources riskTheseare uncertaintiesthat expresses potentialfailure ofskilled manpowerand budget. Mitigationaction ofbusinessit Inrelationto QAHE,through identifying, evaluatingand treatingongoing processofthe resourcerisk managementfor them. 73
evaluatethe consumptionof resourcesand their availability. Contract RiskInthisrisk, counterpartyis unable to provide services for which they are bound. In relationto QAHE,spaceof campuscanbe improvedby contractingwith builder. Contingency action for risk is tobuildcontract orwritten informationon whicheveryone gets agreed. 46 Quality riskTo minimise risk within construction, QAHEuseright quality as well as quantityofraw material. Contingency actionistouse Totalquality managementtool forsetting standardsfor products. 37 Schedule riskForminimising schedule risk, this issignificantfor specifyingtime zonefor accomplishing certain task which provedbeneficial Business can use minimumcritical pathswhich hampersself- interest. 64
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
for QAHE. A critical Path analysis of the project excluding a Gantt Chart representing timescales of the project Gantt Chart:This graphical tool expresses activities that are carried against time in visual format. As per this tool, project is break down and displayed on chart which creates it easy to interpret and understand(Obradović, Todorović and Bushuyev, 2018). The Gantt Chart in context to QAHE is given as follows:
Critical Path:Steps or series that are responsible to identify minimum time which is being needed to carry out project is defined as critical path. Generally, with support of this tool, QAHEwillbeabletoscheduleitstaskandmakessurethattherespectiveprojectis accomplished on time.
An outline of the supporting documentation/forms It is a very significant component within the aspect of the project management to furnish the base for the business project which is referred to the project initiation documentation. Moreover, this act like a reference that is used in order to attain requirements of project including essential details. This has been shown under in relation to when project was initiated and when it will get accomplished(Pan and Zhang, 2021).The Project Initiation Development Plan in context to QAHE has been explained as follows: Title of the projectLaunching of an event Set budgetWithin QAHE, the department of facility management has estimated a budget of £100.000 to fulfil project requirements. This project includes redevelopment as well as refurbishment in the London Campus of QAHE. Money break downHuman resources - £30 Other entities - £30 Raw material - £40 Initiation date12thJuly, 2022 End date31stDecember, 2022 Project SponsorDirector of QAHE University Project Manager KeyObjectives(shortlistofthe major business associated with why such project is being undertaken) To offer proper space to students of business through which they can be comfortable within classroom. Todevelopchartsaswellasotherkey equipment by which business students can be given with proper resources for improving their learning. Entiresuggestedapproach(some necessarypointsinexplanationof Effective strategies should be used which will provide assistance in accomplishing overall objectives an studies
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
how goals can be met)of students also not get influenced through it. Any major risksThere is a chance that students study may be distracted when such kind of project is carried out. Reference(s) An assessment of research methodology to find out stakeholder satisfaction with the project As QAHE is going to refurbish and redevelop its premises within London which is significant for identifying effective approach so that processes which are being carried out will not get affected. In context to QAHE, below is a description of methodology: Agile Methodologyis considered as an iterative process which is used to furnish the project throughout its lifecycle. This kind of methodology states the project which is divided in to various stages and includes regular cooperation with its stakeholders as well as makes improvements in coherency within every stage of process(Wu and et.al., 2021). In relation to QAHE, management is responsible to describe end product that will be achieved through them and the kind of troubles will be resolved through this. This will give project team with clear perception in reference to what they have to do. The steps involved are:evaluation, planning and execution through which the needs of the students can be addressed in an effective way. Strengths:
There will be minimal loss as each individual of the project team works on date-to-date tasks. This will allow the management of QAHE to respond faster.Feedback can be taken instantly which will allow appropriate action to be taken and timely changes(Zuo and et.al., 2018). Weaknesses: The project requires more time as well as energy from the people involved as the interaction has to be done on an ongoing basis(Zwikael and Smyrk, 2019).. QAHE's project team working on odd budgets may not identify what the actual cost will be, this can cause problems for the team and there is a possibility that the project may remain incomplete. CONCLUSION From above description of the report, it has been concluded that an organisation conducts multiple business operations in order to analyse such activities that are being conducted within the workplace. It also analyse the influence that impacts these business operations of the organisation. The aspect of the project management provides assistance to the business in operating its business operations systematically in an effective as well as efficient manner. Within this report, there has been different perspective that are associated with the project management such as stakeholder analysis, risk management, critical path and many more that helps in conducting various business activities in a successful manner. Additionally, this report has been covered strategies that must be developed and according to that budget is formulated that would help in carrying out organisational activitieseffectively. Moreover, QA High Education can choose agile methodology which would facilitate in having flexibility within their activities as well as operations. Furthermore, effective outcomes can be achieved and this can be ensured that results are obtained within set time period. Along with it, this report has been also concluded that the concept of risk management strategies must be acquired by the respective organisation in order to recognise the probable risks that may occur.
REFERENCES Books and Journals Bjorvatn, T. and Wald, A., 2018. Project complexity and team-level absorptive capacity as driversofprojectmanagementperformance.InternationalJournalofProject Management,36(6), pp.876-888. Dinnik,D.I.,Grigoryeva,N.S.andGaloyan,Y.E.,2019,August.Improvingproject managementofsocio-economicdevelopmentoftheregionwiththeuseofsoft computing. InInternational Conference on Theory and Application of Soft Computing, Computing with Words and Perceptions(pp. 214-220). Springer, Cham. Filippetto, A. S., Lima, R. and Barbosa, J. L. V., 2021. A risk prediction model for software project management based on similarity analysis of context histories.Information and Software Technology,131, p.106497. Guo, K. and Zhang, L., 2022. Multi-objective optimization for improved project management: Current status and future directions.Automation in Construction,139, p.104256. Hair, J. F. and Sarstedt, M., 2021. Explanation plus prediction—The logical focus of project management research.Project Management Journal,52(4), pp.319-322. Heigermoser and et.al., 2019. BIM-based Last Planner System tool for improving construction project management.Automation in Construction,104, pp.246-254. Obradović, V., Todorović, M. and Bushuyev, S., 2018, September. Sustainability and agility in project management: contradictory or complementary?. InConference on Computer Science and Information Technologies(pp. 522-532). Springer, Cham. Pan, Y. and Zhang, L., 2021. A BIM-data mining integrated digital twin framework for advanced project management.Automation in Construction,124, p.103564. Wu and et.al., 2021. Ontological knowledge base for concrete bridge rehabilitation project management.Automation in construction,121, p.103428. Zuo and et.al., 2018. Soft skills of construction project management professionals and project successfactors:Astructuralequationmodel.Engineering,Constructionand Architectural Management. Zwikael, O. and Smyrk, J. R., 2019.Project management: A benefit realisation approach. Springer.