This case study discusses the risks and milestones involved in implementing Swedish recycling vehicles in Fingal residential area. It covers potential risks such as budget planning, emission control, and innovation risks, as well as milestones such as project initiation, planning, execution, and closur...
Read More
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

Running head: PROJECT MANAGEMENT
Project Management
Name of Student-
Name of University-
Author’s Note-
Project Management
Name of Student-
Name of University-
Author’s Note-
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

1PROJECT MANAGEMENT
RISK and Milestone according to Project Plan
The project plan that is taken for this case study involves implementation of Swedish
recycling vehicles in Fingal residential area. There is a private organization in Fingal known as
Coolmine Recycling Centre who utilizes recycling of vehicles. The problem that was found was
due to big size of the vehicles, it is very difficult to operate them on narrow roads and also
impacts the environment with the noise and gas that is produced by the vehicles. This problem
can be solved by implementing hybrid trucks that can reach the households.
But there are many risks that are involved in implementing the planned project. There is
risks of maintaining the budget that is planned for the project. The budget planned involves
completing the daily tasks on daily basis with the cost decided in the project plan. There is also a
risk of failing the project of Coolmine Recycling. In that case, there will be more emission of
pollutants. The second risks that is involved in this project plan is that the pollutants identified
are the most problematic one if there is improper management. This will lead to decrease the
proficiency of the project. The risks involves Innovation risks, Budget planning risks as well as
emission control risks. All these are internal risk that can be faced by Coolmine recycling.
The milestones that are described for this project plan four milestones for completing the
project plan successfully. The first tasks involves implementing recycling vehicles for residential
area in Fingal. Milestone 1 includes Initiation phase. The first tasks in the initiation phase
includes developing the case of the business under taken, carrying out the feasibility study,
designing the project charter, and appointing a team who will deal all these tasks. The second
milestone includes the planning phase. In planning development of the project is done along with
development of financial plan. The succeeding tasks includes developing risk plan, developing
RISK and Milestone according to Project Plan
The project plan that is taken for this case study involves implementation of Swedish
recycling vehicles in Fingal residential area. There is a private organization in Fingal known as
Coolmine Recycling Centre who utilizes recycling of vehicles. The problem that was found was
due to big size of the vehicles, it is very difficult to operate them on narrow roads and also
impacts the environment with the noise and gas that is produced by the vehicles. This problem
can be solved by implementing hybrid trucks that can reach the households.
But there are many risks that are involved in implementing the planned project. There is
risks of maintaining the budget that is planned for the project. The budget planned involves
completing the daily tasks on daily basis with the cost decided in the project plan. There is also a
risk of failing the project of Coolmine Recycling. In that case, there will be more emission of
pollutants. The second risks that is involved in this project plan is that the pollutants identified
are the most problematic one if there is improper management. This will lead to decrease the
proficiency of the project. The risks involves Innovation risks, Budget planning risks as well as
emission control risks. All these are internal risk that can be faced by Coolmine recycling.
The milestones that are described for this project plan four milestones for completing the
project plan successfully. The first tasks involves implementing recycling vehicles for residential
area in Fingal. Milestone 1 includes Initiation phase. The first tasks in the initiation phase
includes developing the case of the business under taken, carrying out the feasibility study,
designing the project charter, and appointing a team who will deal all these tasks. The second
milestone includes the planning phase. In planning development of the project is done along with
development of financial plan. The succeeding tasks includes developing risk plan, developing

2PROJECT MANAGEMENT
quality management, developing communication plan, developing procurement plan. Finally
documenting the plan and approval from the sponsor is to be done in the last phase. The third
milestone is completing the executing phase. This includes ordering the trucks needed,
implementing the trucks, adding all extra features, and finally testing the tucks if they are
working properly or not. The last milestone includes project closure which includes reviewing
the project, and requires sign off from the stakeholders.
RISK and Milestone according to Charter
The risks that are involved in the Project Charter of Coolmine Recycling Centre are
differentiated in two different categories. One impacting the project in a negative way and the
other impacting in a positive way. All the risks that are related to other knowledge areas should
be emphasized and those risks should be treated as an integrated manner. The qualitative
methodology should be performed for determining the risk in the project. There are potential
risks that should be managed by the Risk manager. By recruiting risk manager, there will be
better management of the project.
The project charter includes risks which includes management risks, lacking of resource
risks, competitors risks, financial risks and risk from team members. The management risks
involves risk if increasing the time of completion of the project. If all the tasks are not managed
properly, then the time for completing the project might increase. There is also a lack of resource
risk which includes the vehicles needed for recycling can be unavailable and as a result it will be
difficult to complete the project on time. All the resources that are to be required should be
estimated beforehand so that there will be no shortage of resources which might stop the project
working progress. The financial risks involves shortage of money for completing the project as
per the project schedule. If the resources are unavailable or the project time increases,
quality management, developing communication plan, developing procurement plan. Finally
documenting the plan and approval from the sponsor is to be done in the last phase. The third
milestone is completing the executing phase. This includes ordering the trucks needed,
implementing the trucks, adding all extra features, and finally testing the tucks if they are
working properly or not. The last milestone includes project closure which includes reviewing
the project, and requires sign off from the stakeholders.
RISK and Milestone according to Charter
The risks that are involved in the Project Charter of Coolmine Recycling Centre are
differentiated in two different categories. One impacting the project in a negative way and the
other impacting in a positive way. All the risks that are related to other knowledge areas should
be emphasized and those risks should be treated as an integrated manner. The qualitative
methodology should be performed for determining the risk in the project. There are potential
risks that should be managed by the Risk manager. By recruiting risk manager, there will be
better management of the project.
The project charter includes risks which includes management risks, lacking of resource
risks, competitors risks, financial risks and risk from team members. The management risks
involves risk if increasing the time of completion of the project. If all the tasks are not managed
properly, then the time for completing the project might increase. There is also a lack of resource
risk which includes the vehicles needed for recycling can be unavailable and as a result it will be
difficult to complete the project on time. All the resources that are to be required should be
estimated beforehand so that there will be no shortage of resources which might stop the project
working progress. The financial risks involves shortage of money for completing the project as
per the project schedule. If the resources are unavailable or the project time increases,

3PROJECT MANAGEMENT
simultaneously the project cost also increase which might lead to financial risk in the project.
There might also be risks from the team members. If the members are not experienced, they
might face issue while completing the tasks given to them and therefore, there might be increase
in budget and increase in time of the project.
The milestone that are provided in the project charter of Coolmine Recycling Center also
includes four milestones. Project initiation, completion of the planning phase and getting
approval from the sponsor, ordering the trucks, acquiring the tasks, completing simulation,
providing training as well as testing all the trucks. The last phase involves in competing the
project by completing all the phases above. The milestone provided in the charter includes
targeted time about when the milestones are going to be completed. If the milestones are not
completed in time, it might lead to risk in the project.
simultaneously the project cost also increase which might lead to financial risk in the project.
There might also be risks from the team members. If the members are not experienced, they
might face issue while completing the tasks given to them and therefore, there might be increase
in budget and increase in time of the project.
The milestone that are provided in the project charter of Coolmine Recycling Center also
includes four milestones. Project initiation, completion of the planning phase and getting
approval from the sponsor, ordering the trucks, acquiring the tasks, completing simulation,
providing training as well as testing all the trucks. The last phase involves in competing the
project by completing all the phases above. The milestone provided in the charter includes
targeted time about when the milestones are going to be completed. If the milestones are not
completed in time, it might lead to risk in the project.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

4PROJECT MANAGEMENT
Bibliography
Epa.ie. (2018). National Emissions Projections :: Environmental Protection Agency, Ireland.
[online] Available at:
http://www.epa.ie/climate/emissionsinventoriesandprojections/nationalemissionsprojections/
[Accessed 9 Dec. 2018].
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
European Environment Agency. (2018). Electric vehicles from life cycle and circular economy
perspectives - TERM 2018. [online] Available at:
https://www.eea.europa.eu/publications/electric-vehicles-from-life-cycle [Accessed 9 Dec.
2018].
Env.go.jp. (2018). [online] Available at: http://www.env.go.jp/en/recycle/smcs/attach/swmrt.pdf
[Accessed 9 Dec. 2018].
Bibliography
Epa.ie. (2018). National Emissions Projections :: Environmental Protection Agency, Ireland.
[online] Available at:
http://www.epa.ie/climate/emissionsinventoriesandprojections/nationalemissionsprojections/
[Accessed 9 Dec. 2018].
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
European Environment Agency. (2018). Electric vehicles from life cycle and circular economy
perspectives - TERM 2018. [online] Available at:
https://www.eea.europa.eu/publications/electric-vehicles-from-life-cycle [Accessed 9 Dec.
2018].
Env.go.jp. (2018). [online] Available at: http://www.env.go.jp/en/recycle/smcs/attach/swmrt.pdf
[Accessed 9 Dec. 2018].
1 out of 5
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.