Building Refurbishment Project Management

Verified

Added on  2021/04/17

|30
|3769
|35
AI Summary
This assignment provides a comprehensive overview of building refurbishment project management, including details on budget calculations for IT technician and electrician services, as well as the implementation of updated software and hardware resources. The document also includes a discussion on the importance of contractor involvement in reducing design risks in commercial building refurbishment projects.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Project Management
Name of Student
Name of University
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of Contents
Introduction..................................................................................................................................................................................................................3
Project initiation document (PID)................................................................................................................................................................................3
Objectives.................................................................................................................................................................................................................4
Budgetary information..............................................................................................................................................................................................4
Timescales................................................................................................................................................................................................................7
Approach...................................................................................................................................................................................................................8
Project Staff, Stakeholder and Resources.................................................................................................................................................................8
Key staff and stakeholder analysis table...................................................................................................................................................................9
Risk register................................................................................................................................................................................................................13
Project Plan.................................................................................................................................................................................................................20
Project plan along with Summary tasks..................................................................................................................................................................20
Project Milestones..................................................................................................................................................................................................23
Work Breakdown Structure....................................................................................................................................................................................24
Gantt chart showing critical path............................................................................................................................................................................25
Report to project sponsor...........................................................................................................................................................................................26
Risk management approach....................................................................................................................................................................................26
The effectiveness of the PRINCE2 methodology...................................................................................................................................................26
References..................................................................................................................................................................................................................27
Appendices.................................................................................................................................................................................................................29
Document Page
Introduction
The University of Roehampton's London Holborn Centre decides to refurbish the classrooms and the computer labs of the Birmingham
Campus. This initiative will facilitate the individuals who are willing to study in the heart of London. The University decides to replace the
existing hardware and software equipment with the latest ones. The teaching rooms will have modern furniture, well-designed benches, doors,
and windows. They have also planned to refurbish the computer labs. The computer labs will contain updated computer hardware and software
systems. The IT team will set up the hardware and software system, will set up the network and will initiate IT services within the campus. The
Managing Director has been given the responsibility to refurbish the Birmingham campus. He gets full support from the Director of Operations’
end. They also appoint me as the project manager.
The project manager will develop a project plan. The project plan will be helpful to carry out the business activities. The stakeholders can
be knowledgeable about the timeline of every activity. They can also know the budget required to conduct the project activities.
Project initiation document (PID)
Sponsor: Managing Director (MD) of the University of Roehampton
Project Name: Project Management on the refurbishment of Birmingham Campus of University of Roehampton
Prepared By: Mr. Richardson (Director of the Business School
of Roehampton)
Date
: 04/03/2018
Document Page
Objectives
To take up the latest IT services. The updated IT services will facilitate students’ learning. The IT services are helpful to build successful
relationships with the stakeholders of the project.
To build a classroom with modern features. The classroom will have a projector, modern furniture, and modern whiteboards. The
computer labs will have updated computer hardware and software resources.
To develop an IT helpdesk. IT helpdesk is responsible for identifying, analyse and IT related issues.
To build a healthy relationship between the teachers and the students. It facilitates the students to take up the training course materials
imparted by the University of Roehampton.
Budgetary information
Task Name Resource Names Cost
IT Infrastructure Set up at Birmingham campus of University of
Roehampton 31,968.00
IT Infrastructure Deployment at Birmingham campus of
University of Roehampton 31,968.00
Review 7,896.00
Current Classroom Review Director of University of Roehampton Birmingham
Branch,Project Manager 1,536.00
Current Hardware Resources Review
Department of Construction,Project Manager,Director
of University of Roehampton Birmingham Branch,IT
Technician
2,688.00
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Current Software Resources Review
Department of Construction,IT Technician,Project
Manager,Director of University of Roehampton
Birmingham Branch
2,688.00
Current update status of LAN/Wan connectivity Project Manager,Network Engineer 984.00
Analysis 9,192.00
Identifying the factors for improving the classrooms Department of Construction,Project Manager 2,408.00
Identifying the factors for hardware resources improvement Department of Construction,Project Manager 1,720.00
Identifying the factors for software resources improvement IT Support Representative,Project Manager 1,560.00
Analysing factors for improving the IT support desk IT Support Representative,IT Technician,Network
Engineer,Project Manager 3,504.00
Implementation 11,440.00
Furnishing classroom and computer labs 11,440.00
Classroom roof fittings Department of Construction 1,120.00
Classroom floor tiling Department of Construction 1,120.00
Electric wire set up Electrician 520.00
New doors and windows installation Department of Construction 640.00
Lights and fans set up Department of Construction 480.00
New benches set up Department of Construction 480.00
White board set up Department of Construction 320.00
Projector set up Electrician,IT Technician 696.00
Hardware resources implementation Department of Construction,Electrician,IT
Technician,Network Engineer 3,216.00 1
Software resources implementation IT Technician,Network Engineer 1,632.00 2
1 For details of budget calculation and assumptions see Appendix A
2 For details of budget calculation and assumptions see Appendix B
Document Page
Connecting all the hardware resources with LAN Network Engineer 576.00 3
IT Support Desk installation IT Support Representative 640.00
Project Closure 3,440.00
Project Handover Director of University of Roehampton Birmingham
Branch,Project Manager 1,536.00
Authority of University of Roehampton agreement Director of University of Roehampton Birmingham
Branch 800.00
Documentation Preparation Project Manager 552.00
Releasing Resources Project Manager 552.00
3 For details of budget calculation and assumptions see Appendix C
Document Page
Timescales
Task Name Duration Start Finish
IT Infrastructure Set up at Birmingham campus of University of
Roehampton 67 days Mon 05-03-18 Tue 05-06-18
IT Infrastructure Deployment at Birmingham campus of
University of Roehampton 67 days Mon 05-03-18 Tue 05-06-18
Review 15 days Mon 05-03-18 Fri 23-03-18
Current Classroom Review 4 days Mon 05-03-18 Thu 08-03-18
Current Hardware Resources Review 4 days Fri 09-03-18 Wed 14-03-18
Current Software Resources Review 4 days Thu 15-03-18 Tue 20-03-18
Current update status of LAN/Wan connectivity 3 days Wed 21-03-18 Fri 23-03-18
Analysis 16 days Thu 15-03-18 Thu 05-04-18
Identifying the factors for improving the classrooms 7 days Mon 26-03-18 Tue 03-04-18
Identifying the factors for hardware resources improvement 5 days Thu 15-03-18 Wed 21-03-18
Identifying the factors for software resources improvement 5 days Thu 22-03-18 Wed 28-03-18
Analysing factors for improving the IT support desk 6 days Thu 29-03-18 Thu 05-04-18
Implementation 34 days Wed 04-04-18 Mon 21-05-18
Furnishing classroom and computer labs 34 days Wed 04-04-18 Mon 21-05-18
Classroom roof fittings 7 days Wed 04-04-18 Thu 12-04-18
Classroom floor tiling 7 days Fri 13-04-18 Mon 23-04-18
Electric wire set up 5 days Tue 24-04-18 Mon 30-04-18
New doors and windows installation 4 days Tue 24-04-18 Fri 27-04-18
Lights and fans set up 3 days Tue 01-05-18 Thu 03-05-18
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
New benches set up 3 days Tue 24-04-18 Thu 26-04-18
White board set up 2 days Tue 24-04-18 Wed 25-04-18
Projector set up 3 days Tue 01-05-18 Thu 03-05-18
Hardware resources implementation 6 days Tue 01-05-18 Tue 08-05-18
Software resources implementation 6 days Tue 01-05-18 Tue 08-05-18
Connecting all the hardware resources with LAN 4 days Wed 09-05-18 Mon 14-05-18
IT Support Desk installation 5 days Tue 15-05-18 Mon 21-05-18
Project Closure 11 days Tue 22-05-18 Tue 05-06-18
Project Handover 4 days Tue 22-05-18 Fri 25-05-18
Authority of University of Roehampton agreement 4 days Mon 28-05-18 Thu 31-05-18
Documentation Preparation 3 days Fri 01-06-18 Tue 05-06-18
Releasing Resources 3 days Fri 01-06-18 Tue 05-06-18
Approach
The Business School of Roehampton is planning to refurbish the classrooms and the computer labs. The IT Head and Facility Head of the
University decides to update the hardware and software resources. The Director of the University of Roehampton is the main sponsor of the
project. He plans to implement all the modern network, hardware equipment and modern furniture in the classroom and the computer labs. The
adaptation of IT services will give the edge so that they can conduct business with ease. The Project Manager has been appointed to prepare a
project plan. He will engage the stakeholders who will perform all the project activities according to the schedule set in the Project Plan. The
Project Manager assigns Construction Department for the project. The Construction Department comprises of roofer, floorer, painter, and
decorator. They will provide their best and will perform all the activities within the given timeframe and the budget. The IT Technician and IT
Support Representative will handle all the IT-related activities and will solve all the queries raised by students, internal staff and the faculty staff.
Project Staff, Stakeholder, and Resources
Resource Name Type Max. Units Std. Rate
Director of University of Roehampton Birmingham Branch Work 100% 25.00/hr
Document Page
Project Manager Work 100% 23.00/hr
Department of Construction Work 100% 20.00/hr
Electrician Work 100% 13.00/hr
IT Technician Work 100% 16.00/hr
IT Support Representative Work 100% 16.00/hr
Network Engineer Work 100% 18.00/hr
Document Page
Key staff and stakeholder analysis table
Stakeholder
Name
Contact Person Impact Influenc
e
Category
of
stakehold
ers
What is
important to
the
stakeholder?
How could
the
stakeholder
contribute to
the project?
How could the
stakeholder
block the
project?
Strategy for
engaging the
stakeholder
Director 44 20 7946 0366,
265 Corbets Tey
Road, Upminster
RM14 2BN
Very
High
High Advocates Director is
the sponsor
of the project.
His role is to
create a good
educational
platform that
can assist
both the
teachers and
the students
Director’s
role is to
refurbish the
existing
classroom
infrastructure
. The
University of
Roehampton
can be able to
build a
platform for
the
Birmingham
Campus
He can interrupt
the project, or he
can reject the
project as a
whole
Director is the
primary sponsor
of the project
Project
Manager
6-8 Queen Annes
Gardens, Bush Hill
Park, Enfield EN1
Very
High
High Advocates He develops
the project
plan for the
Project
Manager
develops the
He has the
power to change
the worker if he
The project
manager
manages the
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
2JN entire project project plan.
All the
stakeholders
can
acknowledge
the list of
project
activities that
they need to
carry out
is not
performing well.
This approach
can negatively
impact on the
project
resources as
well as the
stakeholders that
are required for
the project
Construction
Department
Blessington Road,
Blackheath, London
SE13 5EB
Medium Medium Follower The
construction
department is
in charge of
constructing
and
refurbishing
the
classrooms
and computer
labs
The
construction
department
involves the
stakeholders
of various
categories-
painter, wood
machinist
roofer. They
will have to
rejuvenate
the classroom
and the
computer
labs
Construction
Department may
work
unethically.
They may be
careless bat
work. This
approach of the
construction
department can
adversely affect
the project
The project
manager
appoints
stakeholders-
roofer, floorer,
plumber, wood
machinist; they
all comprise the
construction
department
IT Support 447429006370, High High Follower The IT He must The IT The IT Support
Document Page
Representative 11/15 Park Road,
Surbiton KT5 8QA
Support
Representativ
e is in charge
to assist the
teachers,
students and
the staffs of
the Business
School
know the IT
staffs. He is
responsible
for solving
all the
queries of the
staffs and the
students of
University of
Roehampton
at
Birmingham
Campus
department will
fail to achieve
success if the IT
Support
Representative
fails to respond
to the students
and the teachers
Representative
has been
assigned the role
by the project
manager to
mitigate the
issues raised by
the students and
the faculty staffs
of the Business
School
Document Page
Risk register
Risk Name Document
Risks
Risk Owner Weightage Scores Risks Mitigation Contingency Plans
1. Social Media
Networking
Cybercrime is
associated with
social
networking.
The teachers
upload the
course materials
online over the
Internet. The
sensitive data
can get
breached due to
the cyber-
attack (Sekak
et al. 2016)
Birmingham
Campus staffs,
the teachers,
and the
hackers
80% Very High Ethical usage of
social networking
can only mitigate
threats related to
the social
networking.
Roehampton
University can
safeguard the
course materials
following certain
rules and policies
(Chen, Maiti and
Agapiou 2017)
The Business School must use
create certain principles. All
the teaching staffs, teachers,
and the students must follow
the norms to conduct social
networking ethically
2. Mobile Device The students
can misuse the
mobile phone.
Students and
the teachers of
Birmingham
40% Low The students
must use the
mobile phone in
The administrative body of
the Business School must
make certain rules for mobile
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
They can easily
lose
concentration,
and their
academics can
suffer. Also,
there is a risk
associated with
hackers. The
hackers can
steal sensitive
data from the
mobiles. The
hackers can get
access to the
course materials
(Lai and Fischer
2017)
Campus the classroom
ethically and
should use it
solely for the
education
purpose
phone usage. The students
must follow those norms as
that can give long-term
benefits to them
3. Malware attack Malware attack
can prove to be
disastrous the
Birmingham
Campus. The
malware attack
and sabotage
the system. For
this reason,
Birmingham
Hacktivists 80% Very High Birmingham
Campus must use
the antimalware
software on their
device. The
antimalware
software can
safeguard the
system of the
Business School
The University of
Roehampton must implement
the antimalware software in
all their system, and the
central database as that can
help them to know carry out
the work in a safe and secure
manner
Document Page
Campus can
lose the
sensitive data
residing within
the system
(Alhusban,
Danso-Amoako
and Gaterell
2017)
4. End-user computing Financial
statements are
often prepared
which involves
several frauds
and defects.
Also, they lack
forensic
capabilities. The
IT operations
and the business
operations can
get negatively
affected (Sesana
et al. 2016)
Non-
programmers
30% Very Low The authority or
the management
team of the
Business School
should constantly
check the
activities carried
out by the
stakeholders of
the project
It is the responsibility of the
University of Roehampton to
develop policies such that the
end-users can conduct the
business activities efficiently
5. Corporate
Espionage
The internal
staffs can leak
the copyright
materials
illegally. This
approach can
prove to be
Internal staff
and the
teaching staff
of Birmingham
Campus
65% Medium The management
team of
Birmingham
Campus should
constantly keep
an eye on the IP
address. They can
The administrative body of
Birmingham Campus must
notice the all the work
activities of the stakeholders.
If they see any unethical
practice, then they must take
legal actions against those
Document Page
disastrous for
the Birmingham
Campus
look at the issues
and can take
actions (Masrom
et al. 2017)
staffs
6. Project Backlog The
stakeholders
associated with
the project can
fail to deliver
quality services.
Disruption can
occur within the
project due to
the project
stakeholder’s
inefficiency and
project
manager’s
inefficiency
(Vicente,
Ferreira and da
Silva 2015).
The project can
suffer due to
inappropriate
delivery of the
project
University of
Roehampton
stakeholders
60% Medium The skilled
workers must be
employed for the
project. The
University Of
Roehampton
must train the
employees with
appropriate
technical skills so
that they can
make use of IT
services ethically
and efficiently
(Ishak 2018)
The management body of
Birmingham Campus must
appoint the skilled workers for
the refurbishment project.
They must have the
appropriate skill to provide
quality service
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
7. IT Governance
policies
Birmingham
Campus does
not follow the
IT Governance
policies, and
this approach
can lead to a
vulnerable
attack. The
hardware and
software
resources can
suffer due to
mismanagement
(Kamaruzzaman
et al. 2018). The
hackers also can
attack the
system with
ease, and thus
the sensitive
data can get
compromised
The
management
team and the
technical staff
of Birmingham
Campus of
University of
Roehampton
90% Very High The IT
Governance
policies must be
followed
carefully; the
policies can assist
them in
conducting the
project activities
within scheduled
deadline in an
efficient way.
The management
team of the
Business School
with the aid of
these policies can
ensure the
security of the
Business School
The University must follow
the IT Governance policies.
They can protect their system
from any kind of risks and
threats following the IT
policies
8. Managing
Electronic Records
During
conversion
procedures, the
University
campus can lose
Technical and
Management
staff of
Birmingham
Campus of
50% Medium The ERM must
be used
efficiently as
ERM can let the
management
The University of
Roehampton at Birmingham
Campus must ethically use the
ERP; it is necessary to
evaluate the monitoring and
Document Page
important data.
ERM comes
with several
challenges
related to
forensic and
storage
Roehampton
University
team check and
process storage
controls (Oloke
2015)
controls in an appropriate way
9. Data Management The IT
Technician’s
responsibility is
to manage the
database and its
contents (Ilter
and Ergen
2015).
Roehampton
University can
suffer huge loss
and reputation
due to the data
mismanagement
The database
developer of
University of
Roehampton
80% Very High Database
developers must
be skilled enough
to handle all the
entries of the
database.
Developers must
store the data
efficiently to
avoid any
discrepancies
The Project Manager must
choose the database
developers wisely. The
database developers must
have the efficiency to
maintain data entry and
manage the database.
10. Cloud Computing They have to
depend on the
cloud vendor
completely, and
they have to pay
heavy monthly
Project
manager and
IT Technician
of
Roehampton
University
35% Low University of
Roehampton
University
Birmingham
Campus must
follow the
The management team of
Business School must follow
the principles set up by the
cloud vendor. They have to
pay charges on monthly basis
or yearly basis. They must
Document Page
or yearly rent
(Aozasa et al.
2015)
principles set by
the cloud vendor.
The Business
School can get
advanced cloud
solutions and
secured solutions.
stay assure that the cloud
computing will provide them
numerous benefits
Probability
Very High
High
Medium
Low
Very Low
Severity Very Low Low Medium High Very High
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Project Plan
Project plan along with Summary tasks
WBS Task Name Duration Start Finish Predecessors Resource Names Cost
0
IT Infrastructure Set up at
Birmingham campus of
University of Roehampton
67 days Mon 05-03-
18
Tue 05-06-
18 31,968.00
1
IT Infrastructure Deployment
at Birmingham campus of
University of Roehampton
67 days Mon 05-03-
18
Tue 05-06-
18 31,968.00
1.1 Review 15 days Mon 05-03-
18
Fri 23-03-
18 7,896.00
1.1.1 Current Classroom Review 4 days Mon 05-03-
18
Thu 08-03-
18
Director of University of
Roehampton Birmingham
Branch,Project Manager
1,536.00
1.1.2 Current Hardware Resources
Review 4 days Fri 09-03-18 Wed 14-03-
18 3
Department of
Construction,Project
Manager,Director of
University of Roehampton
Birmingham Branch,IT
Technician
2,688.00
1.1.3 Current Software Resources
Review
4 days Thu 15-03-
18
Tue 20-03-
18
3,4 Department of
Construction,IT
Technician,Project
Manager,Director of
University of Roehampton
2,688.00
Document Page
Birmingham Branch
1.1.4 Current update status of
LAN/Wan connectivity 3 days Wed 21-03-
18 Fri 23-03-18 4,5 Project Manager,Network
Engineer 984.00
1.2 Analysis 16 days Thu 15-03-
18
Thu 05-04-
18 9,192.00
1.2.1 Identifying the factors for
improving the classrooms 7 days Mon 26-03-
18
Tue 03-04-
18 3,4,5,6
Department of
Construction,Project
Manager
2,408.00
1.2.2 Identifying the factors for
hardware resources improvement 5 days Thu 15-03-
18
Wed 21-03-
18 4
Department of
Construction,Project
Manager
1,720.00
1.2.3 Identifying the factors for
software resources improvement 5 days Thu 22-03-
18
Wed 28-03-
18 9
IT Support
Representative,Project
Manager
1,560.00
1.2.4 Analysing factors for
improving the IT support desk 6 days Thu 29-03-
18
Thu 05-04-
18 9,10
IT Support
Representative,IT
Technician,Network
Engineer,Project Manager
3,504.00
1.3 Implementation 34 days Wed 04-04-
18
Mon 21-05-
18 11,440.00
1.3.1 Furnishing classroom and
computer labs 34 days Wed 04-04-
18
Mon 21-05-
18 11,440.00
1.3.1.1 Classroom roof fittings 7 days Wed 04-04-
18
Thu 12-04-
18 8 Department of
Construction 1,120.00
1.3.1.2 Classroom floor tiling 7 days Fri 13-04-18 Mon 23-04-
18 14,8 Department of
Construction 1,120.00
1.3.1.3 Electric wire set up 5 days Tue 24-04- Mon 30-04- 14,15 Electrician 520.00
Document Page
18 18
1.3.1.4 New doors and windows
installation 4 days Tue 24-04-
18 Fri 27-04-18 14,15 Department of
Construction 640.00
1.3.1.5 Lights and fans set up 3 days Tue 01-05-
18
Thu 03-05-
18 16 Department of
Construction 480.00
1.3.1.6 New benches set up 3 days Tue 24-04-
18
Thu 26-04-
18 15 Department of
Construction 480.00
1.3.1.7 White board set up 2 days Tue 24-04-
18
Wed 25-04-
18 15 Department of
Construction 320.00
1.3.1.8 Projector set up 3 days Tue 01-05-
18
Thu 03-05-
18 16 Electrician,IT Technician 696.00
1.3.1.9 Hardware resources
implementation 6 days Tue 01-05-
18
Tue 08-05-
18 16
Department of
Construction,Electrician,IT
Technician,Network
Engineer
3,216.00
1.3.1.10 Software resources
implementation 6 days Tue 01-05-
18
Tue 08-05-
18 16 IT Technician,Network
Engineer 1,632.00
1.3.1.11 Connecting all the
hardware resources with LAN 4 days Wed 09-05-
18
Mon 14-05-
18 22 Network Engineer 576.00
1.3.1.12 IT Support Desk
installation 5 days Tue 15-05-
18
Mon 21-05-
18 24 IT Support Representative 640.00
1.4 Project Closure 11 days Tue 22-05-
18
Tue 05-06-
18 3,440.00
1.4.1 Project Handover 4 days Tue 22-05-
18 Fri 25-05-18 24,25
Director of University of
Roehampton Birmingham
Branch,Project Manager
1,536.00
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1.4.2 Authority of University of
Roehampton agreement 4 days Mon 28-05-
18
Thu 31-05-
18 27
Director of University of
Roehampton Birmingham
Branch
800.00
1.4.3 Documentation Preparation 3 days Fri 01-06-18 Tue 05-06-
18 27,28 Project Manager 552.00
1.4.4 Releasing Resources 3 days Fri 01-06-18 Tue 05-06-
18 28 Project Manager 552.00
Project Milestones
Task Name Expected Start
IT Infrastructure Set up at Birmingham campus of University of Roehampton Mon 05-03-18
Milestone 1: Completing Review Process Fri 23-03-18
Milestone 2: Completing Analysis Process Thu 05-04-18
Milestone 3: Completing Implementing Process Mon 21-05-18
Milestone 4: Completing the project Tue 05-06-18
Document Page
Work Breakdown Structure
Document Page
Gantt chart showing critical path
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Report to project sponsor
Risk management approach
The risk management is crucial for every organization. The Business School at Roehampton University similarly must take the risk
management approach to safeguard their organization. The risk management approach will assist them to conduct the IT activities safely and
securely. There are numerous project methodologies available, and the University of Roehampton must adopt the project methodology that can
suit them best. The Project Director is the sponsor for the project (Noori et al. 2016). He may ask to complete the entire project much earlier
before the scheduled time. Therefore, there is a risk. The Project quality can get compromised because of this approach. A project methodology
can be helpful to fix a specific deadline for the project. All the stakeholders associated with the project can be aware of the start time and the
finish time of the project. The project planning is a part of project management. The project plan can help the stakeholders to know the details of
every activity of the project. The project manager and the project stakeholders can know the project start date, finish date, the stakeholders
associated with the project. There are other risks associated with the project. There are risks related to the classroom infrastructure as well. The
Project Director and the Project Manager must review the hardware requirements. The risk management approach and adaptation of project
methodology can be helpful to know the areas which can be improved. The project Manager analyzing the areas for improvement can conduct
the feasibility analysis. The Director can be able to figure out the loopholes in the project. The roof fittings, the floor tiling needs to be completed
one after another, and following the project methodology appropriately they can avoid all the risks and can carry out the project activities.
The project methodology can be helpful to conduct the IT activities. The risks associated with the IT services can be mitigated with the
adaptation of project methodology. The project methodology helps to apply the IT governance policies for the project. The hacktivists can hack
he database, and the system and can steal the all the sensitive information (Oregi, Hernandez and Hernandez 2017). The data of the University of
Roehampton can get breached due to the malware attack. However, Roehampton University at Birmingham Campus can safeguard data by
mitigating the risks and adopting the project methodology.
The effectiveness of the PRINCE2 methodology
The PRINCE2 methodology is one of the project methodology following which the Business School can manage the classroom and the
computer labs. The Director, as well as the Project Manager, can get to know all about the project activities. The PRINCE2 helps in preparing
the Project Charter; The Project Charter explains all the stakeholders related to the project along with their roles. The project manager and the
stakeholders can acknowledge the risks and the threats involved with the project. The Project Director may ask to hand over the refurbishment
project sooner. However, the Project Charter will help them to know the risks and the threats associated with the project. The Project Charter
Document Page
demonstrates the start date and the finish date, thus stakeholders will have a clear idea about the deadline of the project activities ( Nibbelink,
Sutrisna and Zaman 2017). The Projector Charter also helps to know which stakeholders are associated with which activities. Also, they can get
to know the budget allocated for each project activity with the help of Charter. For this reason, the stakeholders associated with the project can
evaluate the minimal time and the maximal time by which the project activities must be completed. PRINCE2 can play an important role in
managing the sequential order of activities. The roof fitting, floor tiling, painting, and decoration will be done accordingly following an order.
The PRINCE2 Project methodology also helps in carrying out the refurbishment activities well. The PRINCE2 can assist in maintaining the
quality of the materials. The Business School can monitor the activities of the stakeholders and measure their skills and expertise, in this way
they can assign the best workers for the project (Lou, Lee and Welfle 2017). The PRINCE2 methodology can be helpful in mitigating the IT
risks associated with the project. The project methodology can be helpful in applying IT Governance policies. The IT Governance policies can
be helpful in mitigating the risks and the threats.
NULC collaborated with ILX and found out a solution by which the educational environment can get enhanced. They adopt the
PRINCE2 methodology to rejuvenate and improvise the education environment. The University of Western Australia also adopts the PRINCE2
methodology to organize their education environment (Lund et al. 2016). They were initially suffering from the bad project management.
However, they have recovered. The University of Roehampton can be able to rejuvenate the educational environment. The relationship between
the students and the teachers can be improved with the help of the PRINCE2.
Document Page
References
Alhusban, M., Danso-Amoako, M. and Gaterell, M., 2017. Procurement route and Building Information Modelling (BIM) implementation effect
on sustainable higher education refurbishment projects. In Building Information Modelling, Building Performance, Design and Smart
Construction (pp. 105-112). Springer, Cham.
Ali, A.S., Azmi, N.F. and Baaki, T.K., 2018. Cost performance of building refurbishment works: the case of Malaysia. International Journal of
Building Pathology and Adaptation, (just-accepted), pp.00-00.
Aozasa, K., Akimoto, T., Seike, T., Kim, Y., Tsai, I.C., Miyazawa, Y. and Muto, N., 2015. Current status of energy conservation refurbishment
of non-residence buildings utilizing the subsidy system. AIJ Journal of Technology and Design, 21(49), pp.1183-1188.
Chen, Z., Maiti, S. and Agapiou, A., 2017, May. Evidence-based safety management in building refurbishment. In ARCOM and BEAM Centre
Early Career Researcher and Doctoral Workshop on Building Asset Management (pp. 41-50).
Ilter, D. and Ergen, E., 2015. BIM for building refurbishment and maintenance: current status and research directions. Structural Survey, 33(3),
pp.228-256.
Ishak, N., 2018, February. The influences of attributes, skills and knowledge of managers on refurbishment project performance. In AIP
Conference Proceedings (Vol. 1930, No. 1, p. 020023). AIP Publishing.
Kamaruzzaman, S.N., Lou, E.C.W., Wong, P.F., Wood, R. and Che-Ani, A.I., 2018. Developing weighting system for refurbishment building
assessment scheme in Malaysia through analytic hierarchy process (AHP) approach. Energy Policy, 112, pp.280-290.
Lai, P.P.Y. and Fischer, D.A., 2017. The Price Impact of House Refurbishment Estimated by Geographically Weighted Regression and Hedonic
Pricing Model. International Journal of Property Sciences (E-ISSN: 2229-8568), 6(1)
Lou, E.C., Lee, A. and Welfle, A., 2017. Greenhouse gases (GHG) performance of refurbishment projects–Lessons from UK higher education
student accommodation case studies. Journal of Cleaner Production, 154, pp.309-317.
Lund, O.B., Haddadi, A., Lohne, J. and Bjørberg, S., 2016. Sustainable Planning in Refurbishment Projects–An Early Phase Evaluation. Energy
Procedia, 96, pp.425-434.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Masrom, M.A.N., Rahim, M.H.I.A., Ann, S.C., Mohamed, S. and Goh, K.C., 2017. A preliminary exploration of the barriers of sustainable
refurbishment for commercial building projects in Malaysia. Procedia engineering, 180, pp.1363-1371.
Moncaster, A.M., Birgisdottir, H., Malmqvist, T., Rasmussen, F.N., Wiberg, A.H. and Soulti, E., 2018. Embodied Carbon Measurement,
Mitigation and Management Within Europe, Drawing on a Cross-Case Analysis of 60 Building Case Studies. In Embodied Carbon in
Buildings (pp. 443-462). Springer, Cham.
Nibbelink, J.G., Sutrisna, M. and Zaman, A.U., 2017. Unlocking the potential of early contractor involvement in reducing design risks in
commercial building refurbishment projects–a Western Australian perspective. Architectural Engineering and Design Management, 13(6),
pp.439-456.
Noori, A., Saruwono, M., Adnan, H. and Rahmat, I., 2016. Conflict, Complexity, and Uncertainty in Building Refurbishment Projects.
In InCIEC 2015 (pp. 251-258). Springer, Singapore.
Oloke, D., 2015. Integrating Emerging Technologies for the Efficient Management of Health and Safety in Alteration and Refurbishment
Projects. Proceedings CIB W099 Belfast 2015, p.40.
Oregi, X., Hernandez, P. and Hernandez, R., 2017. Analysis of life-cycle boundaries for environmental and economic assessment of building
energy refurbishment projects. Energy and Buildings, 136, pp.12-25.
Passer, A., Ouellet-Plamondon, C., Kenneally, P., John, V. and Habert, G., 2016. The impact of future scenarios on building refurbishment
strategies towards plus energy buildings. Energy and Buildings, 124, pp.153-163.
Sekak, S.N.A.A., Rahmat, I., Ahmad, N. and Junus, Y.M., 2016. The Study of Energy Efficiency Performance in Refurbishment
Projects. Advanced Science Letters, 22(5-6), pp.1640-1642.
Sesana, M.M., Grecchi, M., Salvalai, G. and Rasica, C., 2016. The methodology of energy efficient building refurbishment: Application on two
university campus-building case studies in Italy with engineering students. Journal of Building Engineering, 6, pp.54-64.
Vicente, R., Ferreira, T.M. and da Silva, J.R.M., 2015. Supporting urban regeneration and building refurbishment. Strategies for building
appraisal and inspection of the old building stock in city centers. Journal of Cultural Heritage, 16(1), pp.1-14.
Document Page
Appendices
Appendix A
IT Technician along with the electrician is in charge of setting hardware resources in new Birmingham Campus of the University of
Roehampton. The IT Technician will have to set up about ten laptops. Each of the laptop’s prices ranges around £125.
Appendix B
The IT Technician will implement the updated software on the new campus at Birmingham. The University will have to implement the
updated software and the updated operating system.
Appendix C
IT Technician will have to install the about ten new routers, the price ranges from £ 600.00
chevron_up_icon
1 out of 30
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]