Project Management: Implementation of Trash Eating Drone

   

Added on  2023-01-19

11 Pages1654 Words99 Views
 | 
 | 
 | 
Running head: PROJECT MANAGEMENT
Project: Implementation of Trash Eating drone
Name of the Student
Name of the University
Author’s Note
Project Management: Implementation of Trash Eating Drone_1

1
PROJECT MANAGEMENT
Table of Contents
Part 4:.........................................................................................................................................2
4.1 Outsourcing needs of project activities............................................................................2
4.2 Resources, cost and budget outsourced activities............................................................2
4.3 Milestones and deliverables for the outsourced work......................................................3
4.4 Detailed project schedule.................................................................................................4
4.5 Cost allocation..................................................................................................................7
4.6 Time allocation.................................................................................................................8
4.7 Gantt chart and other planning details.............................................................................9
Bibliography.............................................................................................................................10
Project Management: Implementation of Trash Eating Drone_2

2
PROJECT MANAGEMENT
Part 4:
4.1 Outsourcing needs of project activities
The project activities are generally outsourced due to the expenditure and it is
identified that in this particular project, the activities are generally outsourced due to the taxes
as well as for providing a number of benefit to the employees of the organization [3]. In
addition to this, efficiency is considered as another reason for outsourcing project activities as
the employees need to properly deal with the project which requires proper training about the
project management practices that is generally required in successful completion of the
project activities. The activities that are outsourced while implementing the Trash eating
drone are generally listed below:
Framing
Connection of motor
Connecting ESC
Use of flight controller
Use of Radio Transmitter Dan Receiver
Adding the function of trash clearance
Testing of the system
4.2 Resources, cost and budget outsourced activities
The resources, cost as well as budget that is required for those activities that are
generally outsourced are mainly reflected in the table that is given below:
Task Name Duration Resource Names Cost
Framing 6 days IT manager $ 2,160.00
Connection of motor 6 days Technical engineer $ 2,160.00
Project Management: Implementation of Trash Eating Drone_3

3
PROJECT MANAGEMENT
Connecting ESC 8 days Contractor, Hardware[1] $ 62,880.00
Use of flight controller 10 days
Software[1],Sub-contractor,
Technical engineer
$ 56,800.00
Use of Radio Transmitter
Dan Receiver
10 days Additional cost[1],IT manager $ 48,800.00
Adding the function of trash
clearance
8 days Technical engineer $ 2,880.00
Testing of the system 4 days Tester $ 1,440.00
4.3 Milestones and deliverables for the outsourced work
The project milestone for the outsourced work so that the trash easting drone can be
implemented is reflected in the table that is given below:
Milestone Completion date
Milestone 4: Completion of implementation phase Mon 28-05-19
The deliverables for the outsourced work in order to implement the Trash eating
drone are generally listed below:
Project implementation report
Progress report
Detailed resource use report
Operation manual
Project Management: Implementation of Trash Eating Drone_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Installation of Assembly Line of Packaging Machines - Work Breakdown Structure, Dependency Matrix, AOA Network, and Gantt Chart Plan
|16
|2119
|313

Study | Project Management Plan
|13
|1884
|54

Information Technology – Software Upgrade Project Proposal
|14
|2698
|68

Project Management qwertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmqwertyuiop
|16
|3271
|96

Assignment on Project Plan PDF
|7
|1479
|33

Project Management: E-Toll system in India Hyderabad Ring Road
|21
|3432
|34