Project Scheduling and Control

Develop three models to explain the reasons behind the project failure in a real-life case study.

6 Pages857 Words277 Views
   

Added on  2023-06-13

About This Document

This article discusses project scheduling and control with a case study on the NBN project for connecting Australia on a faster telecom network. It includes a goal tree, current reality tree, and addressing perceived issues in the project. The article also includes a bibliography. Course code, course name, and college/university are not mentioned.

Project Scheduling and Control

Develop three models to explain the reasons behind the project failure in a real-life case study.

   Added on 2023-06-13

ShareRelated Documents
Running head: PROJECT SCHEDULING AND CONTROL
Project Scheduling and Control
NBN project for connecting Australia on a faster telecom network
Name of the Student:
Student ID:
Name of the University:
Author’s note:
Project Scheduling and Control_1
Providing access to fast broadband to homes and businesses across Australia
international networks
Peak wholesale download speeds of at least 25Mbps to all premises
Peak wholesale download speeds of at least 50Mbps to 90% of Fixed Line Network
Conjunction with phone and internet providers by NBN
Roll out of NBN access network
Unleashing the full potential of digital network of Australia with faster broadband
Develop Australia as more connected, more competitive and more innovative nation
Universal Connectivity for Australia
1PROJECT INITIATION SCHEDULING AND CONTROL
Task 1: Project Goal Description (Goal Tree)
The project is developed for the implementation of the fast broadband network for Australia and forming the bridge between the digital divide. The project would form the implication of
the faster data communication for the implementation of the effective operation development. The goal tree for the project is given below,
Figure 1: Goal Tree for the Project
Task 2: Current Reality Tree
The project is developed for the implementation of the fast broadband network for Australia and forming the bridge between the digital divide. The project would form the implication of
the faster data communication for the implementation of the effective operation development. The goal tree for the project is given below,
Project Scheduling and Control_2
UDE 1:
Broadband Speed Less than expected
UDE 2:
Unable to roll out NBN access network
Network Access with phone and network providers is absentUniversal Connectivity is not aligned with phone and internet providers Conjunction with internet and telephone providers
Universal connection cannot be established in Australia
Innovation and connection is developed for Australia
Full Potential of digital network of Australia is deployed
Network for domestic and international transmission network would be absent
2PROJECT INITIATION SCHEDULING AND CONTROL
Figure 2: Current Reality Tree for the Project
Project Scheduling and Control_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management for NBN Broadband Access Network
|14
|2062
|124

National Broadband Network Australia - PDF
|6
|1839
|82

Project Scheduling And Control
|13
|3149
|137

What is the National Broadband Network?
|4
|899
|89

Business Experience Project Name of the Student Name of the University Author
|17
|4619
|116

Broadband access Research Assignment PDF
|6
|1226
|28